The global AI buildout
Today Nov 2026
19.5GW of power capacity at the tracked AI campuses
the power capacity of the 96 large AI campuses that Epoch AI tracks, about 44% of the world's AI computing capacity
At full load, the power of 16.2 million US homes.
- H100-equivalents
- 15.8M
- Online
- 76
- Building
- 20
- Data-centre power use, 2025
- 485 TWh
- World AI compute, Q2 2026
- 31.7M H100e
- Share at these campuses, Epoch’s estimate
- about 44%
- Capex, Q3 2026
- $265.5B
- Cloud regions
- 297 in 46 countries
- AI campus, by power
- AI supercomputer
- Cloud region
Data: Epoch AI, CC BY 4.0 · IEA, CC BY 4.0 · company filings · cloud providers · by country · sources
Embed
Each frame credits Epoch AI and links back to its page. Preview it.
On a light page, end the frame’s address with ?theme=light. Preview it light.
Cite
The tracked AI campuses have added 1.3 GW since 22 Oct 2026
Epoch's 22 Oct 2026 release against 13 Nov 2026- Switched on6 sites +803 MW
- 22 Oct 2026, restated3 sites revised by Epoch +296 MW
- Newly tracked1 site +155 MW
- Net change18.2 GW → 19.5 GW +1,254 MW
Switched on · 6
- OpenAI Stargate Abilene +289 MW 865 MW → 1.2 GW
- Anthropic Lake Mariner +196 MW 49 MW → 245 MW
- Envision Galaxy Ulanqab +153 MW 0 MW → 153 MW
- Meta Aiken +78 MW 90 MW → 168 MW
- Huawei Wuhu +54 MW 202 MW → 256 MW
- Meta Los Lunas +33 MW 114 MW → 147 MW
Restated · 3
- OpenAI Stargate Abilene +275 MW 590 MW → 865 MW
- Huawei Wuhu +21 MW 181 MW → 202 MW
- Huawei Horinger 0 MW 212 MW → 212 MW
Newly tracked · 1
- YTL Johor 155 MW Undisclosed
- Sites tracked
- 95 → 96
- Drawing power
- 74 → 76
- Projected, Jan 2030
- 49.9 GW → 50.4 GW
Against Epoch's release of 22 Oct 2026 (archived copy).
10 of 94 planned campus power increases have slipped or shrunk
Each planned step against the newest release- On plan
- 84 steps · 27.3 GW planned · at the planned size on the planned date
- Later
- 7 steps · 1.3 GW planned · the planned size, on a later date
- Smaller
- 3 steps · 2.9 GW planned · never at the planned size
The IEA expects data centers to use 950 TWh by 2030
all data centers, worldwide · IEA- 2024
- 415 TWh
- 2025
- 485 TWh
- 2030 · base case
- 950 TWh
about 1.5% of world electricity in 2024, and around 3% by 2030. AI-focused data centers reach about 465 TWh in 2030. IEA, CC BY 4.0.
By region, 2024
$265.5B of capital spending in Q3 2026, up 127% on a year earlier
10 companies · quarterly- $51.6B 2024 Q1
- $60.8B 2024 Q2
- $66.9B 2024 Q3
- $90.2B 2024 Q4
- $86.6B 2025 Q1
- $109.4B 2025 Q2
- $116.8B 2025 Q3
- $143.9B 2025 Q4
- $168.6B 2026 Q1
- $214.0B 2026 Q2
- $265.5B 2026 Q3
| Company | Q3 2026 | A year earlier | Change |
|---|---|---|---|
| Amazon US | $77.3B | $35.1B | +120% |
| Alphabet US | $51.4B | $24.0B | +114% |
| Microsoft US | $39.4B | $19.4B | +103% |
| Meta US | $33.9B | $18.8B | +80% |
| Oracle US | $28.5B | $8.5B | +235% |
| Tencent CN | $9.7B | $2.8B | +246% |
| CoreWeave US | $9.4B | $2.4B | +295% |
| Alibaba CN | $7.5B | $4.4B | +70% |
| Nebius NL | $7.3B | $1.0B | +664% |
| Baidu CN | $1.1B | $0.5B | +129% |
Cash spent on property and equipment, from each company's filings, in US dollars. The last four quarters total $792.0B.
54 countries
Every country →| Country | Tracked campuses, today | Their AI compute, H100e | Cloud regions |
|---|---|---|---|
| United States | 16.2 GW | 13.6M | 52 |
| Malaysia | 1.7 GW | 1.4M | 6 |
| China | 1.1 GW | 336K | 34 |
| United Kingdom | 124 MW | 124K | 10 |
| Indonesia | 94 MW | 84K | 7 |
| Finland | 90 MW | 49K | 2 |
| Australia | 57 MW | 46K | 10 |
| Norway | 55 MW | 51K | 1 |
| Portugal | 40 MW | 32K | — |
| Iceland | 7 MW | 6K | — |
| Germany | — | — | 8 |
| Japan | — | — | 13 |
| France | — | — | 9 |
| Switzerland | — | — | 4 |
| Saudi Arabia | — | — | 5 |
A dash means Epoch AI tracks no campus there, not that the country has none. Epoch AI estimates that its sites hold about 44% of the world’s AI computing capacity, and it covered the United States first.
Cloud regions by provider, live and open to all customers
Brazil's Scala AI City leads the announced campuses at 4.75 GW
not tracked by Epoch AI · not in any total on this page- Brazil · Scala AI CityScala Data Centers, Eldorado do Sul, Rio Grande do Sul 4.75 GWfull build, May 2025 · release
- Saudi Arabia · DataVolt OxagonDataVolt, Oxagon, NEOM 1.5 GWfull build, Aug 2026 · release
- France · Campus IAMGX, Bpifrance, Mistral AI and NVIDIA, Paris region 1.4 GWfull build, May 2025 · release
- Japan · SoftBank SakaiSoftBank, Sakai, Osaka over 400 MWfull build, Jun 2024 · release
- Germany · Schwarz Digits LübbenauSchwarz Digits, Lübbenau, Brandenburg around 200 MWfirst build, Nov 2025 · release
Each figure is the release's own, and the outline means announced, not built. None of these sites is in the tracked totals above. 3 of them are dashed rings on the globe, at the town the release names. DataVolt Oxagon is not drawn: OpenStreetMap has no town named Oxagon, and NEOM is a region. Campus IA is not drawn: its release names the Paris region and no town.
From 82 MW in 2023 to 19.5 GW today
facility power of the tracked sites · by monthEpoch AI tracks sites that started to operate in 2024 or later, with some exceptions, so the early years hold few sites.
- Jan 2023
- 82 MW
- Today
- 19.5 GW
- Jan 2030 · projected
- 50.4 GW
As a table
| 1 January | Facility power | H100-equivalents | Capital cost | Sites drawing power |
|---|---|---|---|---|
| 2022 | 57 MW | 8K | $1.8B | 1 |
| 2023 | 82 MW | 14K | $2.5B | 2 |
| 2024 | 591 MW | 213K | $17.8B | 7 |
| 2025 | 2.6 GW | 1.2M | $78.0B | 23 |
| 2026 | 8.6 GW | 5.9M | $256.0B | 47 |
| 2027 (projected) | 22.1 GW | 18.6M | $647.0B | 84 |
| 2028 (projected) | 37.2 GW | 41.0M | $1.07T | 92 |
| 2029 (projected) | 50.2 GW | 66.1M | $1.45T | 96 |
| 2030 (projected) | 50.4 GW | 66.2M | $1.46T | 96 |
The largest, today
by facility powerToday Projected peak
The United States holds 83% of the tracked campuses' power
facility power today · 96 tracked sitesBy owner
By country
Epoch AI covered the United States first and is adding sites in other countries, so the share of the tracked sites is not the share of the world. Epoch AI marks the owner of 4 sites as unconfirmed (VNET Bayin Ulanqab, QTS Cedar Rapids, Goodnight, QTS Eagle Mountain); each has its own bar here.
56% of the world’s arrived AI compute is outside Epoch AI’s tracked campuses
arrivals to 30 Jun 2026 · owners to 31 Dec 2025 · CSVEpoch AI counts 27.4M H100-equivalents arrived worldwide by 30 Jun 2026. Its tracked campuses held 12.1M of them that day, 44%. The other 15.3M are at sites Epoch AI does not track.
By country, 30 Jun 2026
Arrived, Epoch AI's chip imports At the tracked campuses
By chip owner, 31 Dec 2025
Held, Epoch AI's chip owners At the tracked campuses
Google holds the most compute outside the tracked campuses: 3.4M H100e of its 5.0M, on 31 Dec 2025. What the chip makers sell into data centers.
How: each figure is one of Epoch AI's estimates less another, both in H100e, on the same day. A campus's compute is read from its own timeline on that day. A campus counts for a chip owner only where Epoch AI's rows name the same company, and Epoch AI's SpaceXAI campuses count as xAI. 961K H100e at 12 campuses are not mapped to an owner: Undisclosed 501K, ByteDance 221K, ByteDance (unconfirmed) 123K, Huawei 55K, Nebius 25K, Core42 20K, Alibaba 16K. All other owners, China and smuggled chips have no campus Epoch AI names, so they show the whole only. In Malaysia the campuses hold more than Epoch AI counts as arrived: the two estimates come from different runs and disagree there. xAI's campuses hold more than its owner estimate, so it shows no untracked part. The owners file ends earlier, so its dates differ from the arrivals. Epoch AI states its tracked sites hold 44% of world compute (30% to 78%), from a third file. These are modelled estimates, not an inventory.
US data-center building rises 90% in a year, to $96.5 bn a year
Construction spending, with every revisionU.S. Census Bureau, Construction Spending, release of 2 November 2026, public domain. Buildings only, without the servers inside. September 2026 is Census’s preliminary estimate, and the next two releases will revise it. The level, the change on a year earlier and the revisions.
All 96 sites
Download CSV| Site | Owner | Where | Today | Projected peak |
|---|---|---|---|---|
| Colossus 2 | SpaceXAI | Memphis, Tennessee | 1.3 GW | 2.1 GW · Feb 2027 |
| Anthropic-Amazon New Carlisle | Amazon | New Carlisle, Indiana | 1.2 GW | 2.3 GW · Mar 2028 |
| OpenAI Stargate Abilene | Oracle | Abilene, Texas | 1.2 GW | — |
| Microsoft Fairwater Atlanta | Microsoft | Fayetteville, Georgia | 859 MW | — |
| DayOne Nusajaya | Undisclosed | Johor Bahru, Johor, Malaysia | 662 MW | — |
| Meta Prometheus | Meta | New Albany, Ohio | 612 MW | 1.3 GW · Jul 2028 |
| DayOne Kempas | Undisclosed | Kempas, Johor, Malaysia | 590 MW | — |
| Microsoft Fairwater Wisconsin | Microsoft | Mount Pleasant, Wisconsin | 442 MW | 2.7 GW · May 2028 |
| Google Pryor (North) | Pryor, Oklahoma | 442 MW | — | |
| Colossus 1 | SpaceXAI | Memphis, Tennessee | 425 MW | — |
| Google New Albany | New Albany, Ohio | 400 MW | — | |
| CoreWeave Denton TX | CoreWeave | Denton, Texas | 367 MW | 395 MW · May 2027 |
| Google Columbus | Columbus, Ohio | 364 MW | 464 MW · Jul 2027 | |
| Amazon Madison Mega Site | Amazon | Canton, Mississippi | 341 MW | 819 MW · Mar 2028 |
| QTS Richmond 1 | Undisclosed | Sandston, Virginia | 333 MW | — |
| Bridge Data Centres MY06 | ByteDance | Kulai, Johor, Malaysia | 315 MW | — |
| Google Bristow | Bristow, Virginia | 286 MW | — | |
| Google Omaha | Omaha, Nebraska | 284 MW | 474 MW · Jul 2028 | |
| Google Council Bluffs (East) | Council Bluffs, Iowa | 284 MW | — | |
| Google Papillion | Papillion, Nebraska | 284 MW | — | |
| Amazon Ridgeland | Amazon | Ridgeland, Mississippi | 273 MW | 1.0 GW · Sep 2028 |
| Microsoft Goodyear | Microsoft | Goodyear, Arizona | 263 MW | — |
| Huawei Wuhu | Huawei | Wuhu, Anhui, China | 256 MW | 589 MW · Dec 2027 |
| AWS New Albany | Amazon | New Albany, Ohio | 255 MW | 405 MW · Jul 2027 |
| VNET Bayin Ulanqab | ByteDance (unconfirmed) | Ulanqab, Inner Mongolia, China | 252 MW | 798 MW · Sep 2027 |
| QTS Richmond 2 | Undisclosed | Sandston, Virginia | 252 MW | — |
| Anthropic Lake Mariner | AI XPV Platform | Barker, New York | 245 MW | 441 MW · Mar 2027 |
| Meta-QTS Hillsboro 2 | Meta | Hillsboro, Oregon | 243 MW | — |
| Meta Jeffersonville | Meta | Jeffersonville, Indiana | 241 MW | — |
| Meta Rosemount | Meta | Rosemount, Minnesota | 241 MW | — |
| Google Mesa | Mesa, Arizona | 237 MW | — | |
| Meta Temple | Meta | Temple, Texas | 231 MW | — |
| Microsoft Project Osmium | Microsoft | Cumming, Iowa | 228 MW | — |
| Google Storey County | Clark, Nevada | 214 MW | 389 MW · Jun 2027 | |
| Huawei Horinger | Huawei | Hohhot, Inner Mongolia, China | 212 MW | 439 MW · Feb 2028 |
| Alibaba Zhangbei | Alibaba | Zhangbei, Hebei, China | 203 MW | — |
| QTS Richmond 3 | Undisclosed | Sandston, Virginia | 202 MW | 336 MW · Feb 2027 |
| Coreweave Helios | CoreWeave | Afton, Texas | 200 MW | 800 MW · Jan 2029 |
| Meta Montgomery | Meta | Montgomery, Alabama | 199 MW | 465 MW · Feb 2027 |
| Meta Huntsville | Meta | Huntsville, Alabama | 198 MW | — |
| Meta Kuna | Meta | Kuna, Idaho | 198 MW | — |
| Google The Dalles | The Dalles, Oregon | 185 MW | — | |
| Meta Cheyenne | Meta | Cheyenne, Wyoming | 182 MW | 249 MW · Feb 2027 |
| Meta Eagle Mountain | Meta | Eagle Mountain, Utah | 179 MW | — |
| Google Lincoln | Lincoln, Nebraska | 170 MW | 339 MW · Oct 2027 | |
| Meta Aiken | Meta | Aiken, South Carolina | 168 MW | — |
| Google Lancaster | Lancaster, Ohio | 164 MW | — | |
| YTL Johor | Undisclosed | Kulai, Johor, Malaysia | 155 MW | 389 MW · Aug 2028 |
| Envision Galaxy Ulanqab | Undisclosed | Ulanqab, Inner Mongolia, China | 153 MW | 612 MW · Dec 2027 |
| Meta Los Lunas | Meta | Los Lunas, New Mexico | 147 MW | 273 MW · Jan 2028 |
| AWS Berwick | Amazon | Berwick, Pennsylvania | 139 MW | 212 MW · Aug 2027 |
| Google Kansas City East | Kansas City, Missouri | 126 MW | — | |
| Google Waltham Cross | Cheshunt, Hertfordshire, United Kingdom | 124 MW | — | |
| Google Midlothian | Midlothian, Texas | 123 MW | — | |
| STACK Infrastructure NVA02 | Undisclosed | Manassas, Virginia | 118 MW | 487 MW · Jan 2028 |
| CoreWeave Chester VA | CoreWeave | Chester, Virginia | 114 MW | 197 MW · Jun 2027 |
| Meta Gallatin | Meta | Gallatin, Tennessee | 114 MW | — |
| Microsoft SAT40 | Microsoft | San Antonio, Texas | 106 MW | — |
| Meta Sarpy | Meta | Springfield, Nebraska | 105 MW | — |
| Oracle Batam | Oracle | Batam, Riau Islands, Indonesia | 94 MW | — |
| Google Red Oak | Red Oak, Texas | 93 MW | 185 MW · Dec 2026 | |
| Google Arcola | Arcola, Virginia | 93 MW | — | |
| CoreWeave Marble NC | CoreWeave | Marble, North Carolina | 91 MW | — |
| Nebius Mantsala | Nebius | Mantsala, Uusimaa, Finland | 90 MW | 196 MW · Dec 2027 |
| CoreWeave Ellendale ND | CoreWeave | Ellendale, North Dakota | 88 MW | 520 MW · Jun 2027 |
| Stream Phoenix | Undisclosed | Goodyear, Arizona | 77 MW | 267 MW · Jan 2030 |
| Microsoft-Nebius New Jersey | Nebius | Vineland, New Jersey | 70 MW | — |
| Microsoft SAT14 | Microsoft | San Antonio, Texas | 66 MW | — |
| Core42 Lake Mariner | Core42 | Barker, New York | 58 MW | — |
| Southgate Melbourne | Firmus | Melbourne, Victoria, Australia | 57 MW | — |
| CoreWeave Norway | CoreWeave | Øvrebø, Agder, Norway | 55 MW | — |
| Vantage TX1 | Undisclosed | San Antonio, Texas | 45 MW | 179 MW · Aug 2027 |
| Start Campus Sines Data Campus | Nscale | Sines, Setúbal, Portugal | 40 MW | 280 MW · Sep 2027 |
| CoreWeave Dalton 1 & 2 | CoreWeave | Dalton, Georgia | 40 MW | — |
| xAI QTS Atlanta | SpaceXAI | Atlanta, Georgia | 24 MW | — |
| Nscale Keflavik | Nscale | Reykjanesbær, Suðurnes, Iceland | 7 MW | 13 MW · Dec 2026 |
| OpenAI Stargate New Mexico | Oracle | Santa Teresa, New Mexico | Building | 2.5 GW · Dec 2028 |
| Meta Hyperion | Meta | Holly Ridge, Louisiana | Building | 2.2 GW · Jan 2028 |
| OpenAI Stargate Shackelford | Oracle | Abilene, Texas | Building | 2.0 GW · Nov 2028 |
| QTS Cedar Rapids | Meta (unconfirmed) | Cedar Rapids, Iowa | Building | 1.6 GW · Nov 2027 |
| OpenAI Stargate UAE | G42 | Abu Dhabi, Abu Dhabi, United Arab Emirates | Building | 1.4 GW · Jan 2028 |
| OpenAI Stargate Michigan | Oracle | Benton, Michigan | Building | 1.4 GW · Dec 2028 |
| OpenAI Stargate Wisconsin | Oracle | Port Washington, Wisconsin | Building | 1.3 GW · Dec 2028 |
| Goodnight | Google (unconfirmed) | Claude, Texas | Building | 1.3 GW · Oct 2027 |
| OpenAI Stargate Milam | Softbank | Burlington, Texas | Building | 1.2 GW · Dec 2028 |
| Google Fort Wayne | Fort Wayne, Indiana | Building | 1.0 GW · Jun 2028 | |
| Crusoe Abilene Expansion | Microsoft | Abilene, Texas | Building | 941 MW · Nov 2027 |
| Meta Bowling Green | Meta | Bowling Green, Ohio | Building | 570 MW · Jan 2028 |
| QTS Eagle Mountain | Meta (unconfirmed) | Eagle Mountain, Utah | Building | 411 MW · Jul 2027 |
| Google Cedar Rapids | Cedar Rapids, Iowa | Building | 314 MW · May 2027 | |
| Anthropic Barber Lake | Cipher Mining | Colorado City, Texas | Building | 300 MW · Apr 2027 |
| OpenAI Stargate Lordstown | Softbank | Lordstown, Ohio | Building | 300 MW · Mar 2027 |
| CoreWeave Muskogee OK | CoreWeave | Muskogee, Oklahoma | Building | 181 MW · Dec 2027 |
| CoreWeave Lancaster Greenfield site | CoreWeave | Lancaster, Pennsylvania | Building | 124 MW · Jun 2027 |
| Microsoft Narvik Norway | Nscale | Bjerkvik, Narvik, Norway | Building | 124 MW · Dec 2026 |
| EcoDataCenter 2 | Mistral AI | Borlänge, Dalarna County, Sweden | Building | 67 MW · Jun 2028 |
- Epoch AI, “AI data centers”, CC BY 4.0, retrieved 13 Nov 2026. Values after 13 Nov 2026 are Epoch's projections. Each megawatt figure is capacity. Epoch AI puts average use at 60% to 80% of capacity. Earlier release: 22 Oct 2026 (archived copy).
- U.S. Energy Information Administration, Form EIA-861M, public domain: a US home used 10,499 kWh a year from September 2025 to August 2026, residential sales over residential customers. One home is 1.20 kW of continuous draw. EIA marks 8 of the months preliminary.
- U.S. Census Bureau, Construction Spending, release of 2 November 2026, public domain.
- Epoch AI, “Data on GPU clusters”, CC BY 4.0, retrieved 16 Oct 2026.
- Epoch AI, “Statements on dataset coverage”, CC BY 4.0, retrieved 13 Nov 2026.
- Epoch AI, “AI chip sales (world AI compute)”, CC BY 4.0, retrieved 16 Nov 2026.
- International Energy Agency, “Energy and AI (2025); Key Questions on Energy and AI (2026); Energy and AI in East Asia (2026)”, CC BY 4.0, retrieved 11 Oct 2026.
- Company filings, “Quarterly capital expenditure of Microsoft, Alphabet, Amazon, Meta, Oracle, CoreWeave, Alibaba, Tencent, Baidu, Nebius”, SEC filings are public information; Tencent figures are cited from its HKEX announcements; FX from the Federal Reserve H.10, public domain, retrieved 22 Nov 2026.
- Cloud providers, “Public region lists of AWS, Microsoft Azure, Google Cloud, Oracle Cloud Infrastructure, Alibaba Cloud, Tencent Cloud, Huawei Cloud, IBM Cloud, CoreWeave, Nebius”, Facts from each provider’s public region list, retrieved 11 Oct 2026.
- Town and city locations: © OpenStreetMap contributors, ODbL.
- The CSV and JSON files are CC BY 4.0, with credit to Epoch AI.