Amazon · New Albany, Ohio

AWS New Albany

255MW

The power of 210,000 US homes.

Drawing power since Dec 2024. Projected to reach 405 MW by Jul 2027.

Capital cost
$8.1B
Chips
Trainium2, H100, H200, B200
Embed

Each frame credits Epoch AI and links back to its page. Preview it.

Cite
Download
Post on X
AWS New Albany on a globe of the world's largest AI data centers.

Power over time

facility power · 5 milestones
Every milestone
  1. 1 Jul 2022 — Land clearing begins for Buildings 5-9 (eastern campus).
  2. 1 Dec 2024 136 MW Buildings 5-9 (eastern campus) operational. New Albany’s Dec. 2024 report lists AWS partial occupancy for 5 buildings at the eastern campus. Note that we're only including roughly 44% of all the New Albany campuses IT Power as being dedicated to leading AI chips, based on all the types of compute instances listed. The full IT power is much higher than 113 MW.
  3. 12 Mar 2026 255 MW Middle campus Buildings 10, 12, 13, and 14 appear complete/likely operational. Building 11 is still installing backup generators, so it is not counted as operational. Based on satellite imagery, northern campus Buildings 1-3 appear in late construction, with all roofs complete but nearby generator/cooling equipment still being installed for buildings 2-3. Building 4 is still early in construction. Eastern campus Buildings 5-9 appear complete and operational as expected. Note that we're only including roughly 44% of all the New Albany campuses IT Power as being dedicated to leading AI chips, based on all the types of compute instances listed.
  4. 18 May 2026 255 MW Satellite imagery shows Building 1 in the northern campus still appears structurally finished, with no visible change from the prior two months, but we're still not counting it operational due to visible construction work around the perimeter. Buildings 2-3 still have nearby generators/cooling equipment being installed, and Building 4 is only roughly 80% roofed. Eastern campus Buildings 5-9 remain operational. Middle campus Buildings 10, 12, 13, and 14 remain operational; Building 11 is still installing backup generators and is not counted.
  5. 1 Jul 2027 · projected 405 MW Expected operational date for the remaining tracked buildings (11, and 1-4) across the three campuses. This estimate is based on the previous buildings taking roughly 1.5 years from steel framing to complete operational status. Note that we're only including roughly 44% of all the New Albany campuses IT Power as being dedicated to leading AI chips, based on all the types of compute instances listed.

Every step Epoch planned here on 2 Sep 2026 is still on plan. Planned against reached

Gas made 41% of the power on this site's grid

net generation by fuel · Oct 2025 to Sep 2026

PJM Interconnection, LLC PJM · balancing authority

  1. Gas 41%
  2. Coal 17%
  3. Nuclear 31%
  4. Wind 4%
  5. Solar 3%
  6. Hydro 2%
  7. Other 3%

The grid of the utilities that serve Franklin County, OH. Each grid is a balancing authority. Generation only; imports are excluded. Every grid behind an AI site.

Owners plan 400 MW of new power in Franklin County, mostly solar

power plants in Franklin County · EIA-860M, September 2026
  1. Flint Storage · 200 MW · Jul 2027 · being built · Flint
  2. Pleasant Prairie Solar Energy LLC Solar · 200 MW · Dec 2026 · being built · Invenergy Services LLC

In service in Franklin County today: 15 MW. Since January 2023: 7 MW added, 3 MW retired. A plant in the same county does not mean it feeds the site. Power plants near every AI site.

Sources

selected by Epoch AI
  1. City of New Albany Project Updates
  2. New Albany Community Development Report - Dec. 2024
  3. New Albany Community Development Report - Aug. 2025
  4. Article reporting first signing of the project

Data: Epoch AI, “AI data centers”, CC BY 4.0, retrieved 22 Oct 2026. Facility power adds cooling and other overhead to the IT power the servers draw. Placed at the centre of New Albany. Grid: U.S. Energy Information Administration, Hourly Electric Grid Monitor (Form EIA-930), public domain, retrieved 16 Oct 2026; utilities by county from Form EIA-861 and the U.S. Census Bureau Geocoder, public domain. Power plants: U.S. Energy Information Administration, Form EIA-860M, public domain, inventory as of September 2026. All sources.