Oracle · Batam, Riau Islands, Indonesia
Oracle Batam
94MW
The power of 76,000 US homes.
Drawing power since May 2025.
- H100-equivalents
- 84K
- Capital cost
- $2.7B
- Chips
- B200, B300
- Users
- Tencent (unconfirmed)
Power over time
facility power · 7 milestonesEvery milestone
- 1 Jul 2022 — Land clearing begins.
- 15 May 2025 43 MW Building 1 and 2 are operational. Based on Oracle announcing the Indonesia North (Batam) region is available, and both buildings looking complete soon after, in June.
- 13 Jun 2025 43 MW Building 3 shell is partly built. Building 1 and 2 look complete.
- 1 Oct 2025 43 MW Building 3 has cooling towers beginning to be installed.
- 19 Mar 2026 43 MW Building 3 looks complete including building shell, chillers and backup generators.
- 17 Apr 2026 94 MW Building 3 is operational. Based on it looking complete as of March, and DayOne posting a video of the facility on this date. In one shot of the video, fan movement is visible for all buildings, suggesting they are all operational.
- 6 May 2026 94 MW The three buildings look unchanged since March.
Coal made 69% of the power in Indonesia
share of generation · 2025Indonesia World
- Gas 12% against 21% for World
- Coal 69% against 33% for World
- Other fossil 3% against 3% for World
- Nuclear 0% against 9% for World
- Wind <1% against 9% for World
- Solar <1% against 10% for World
- Hydro 7% against 14% for World
- Bio & other 9% against 2% for World
Fossil 84% (−1 pt on a year earlier) · nuclear 0% · renewables 16% · 705 g CO2e per kWh, life cycle · 2025. Generation for all of Indonesia, without imports; the data does not show which grid feeds the site. Every country behind an AI site.
Sources
selected by Epoch AI- DayOne discloses a partnership with "leading global tech company" at their Batam campus
- Oracle announces their Batam cloud compute region
- Oracle is later reported to be leasing DayOne data centers in Indonesia
- DayOne video stating 72 MW of IT power and NVIDIA partnership, and showing cooling tower fan movement
- Tencent deal with Oracle for 100,000 AI chips in Southeast Asian data centers
Data: Epoch AI, “AI data centers”, CC BY 4.0, retrieved 22 Oct 2026. Facility power adds cooling and other overhead to the IT power the servers draw. Placed at the centre of Batam. Grid: Ember, “Monthly Electricity Data and Yearly Electricity Data”, CC BY 4.0, retrieved 11 Oct 2026; shares computed here. All sources.