241MW
The power of 200,000 US homes.
Drawing power since Jun 2026.
- H100-equivalents
- 203K
- Capital cost
- $6.7B
- Chips
- B300
- Users
- Meta
Power over time
facility power · 3 milestonesEvery milestone
- 1 Feb 2024 — Land clearing begins.
- 6 Mar 2026 — Building 1 and 2 shell and cooling look complete, but there's still construction activity. We give it another 3 months to operational.
- 4 Jun 2026 241 MW Building 1 and 2 are operational.
Gas made 37% of the power on this site's grid
net generation by fuel · Oct 2025 to Sep 2026Midcontinent Independent Transmission System Operator, Inc. MISO · balancing authority
- Gas 37%
- Coal 26%
- Nuclear 14%
- Wind 15%
- Solar 6%
- Hydro 1%
- Other 1%
The grid of the utilities that serve Clark County, IN. Each grid is a balancing authority. Generation only; imports are excluded. Every grid behind an AI site.
Owners plan 200 MW of new power in Clark County, all solar
power plants in Clark County · EIA-860M, September 2026- Flag Run Solar
In service in Clark County today: 6 MW. Since January 2023: 0 MW added, 0 MW retired. A plant in the same county does not mean it feeds the site. Power plants near every AI site.
Sources
selected by Epoch AIData: Epoch AI, “AI data centers”, CC BY 4.0, retrieved 22 Oct 2026. Facility power adds cooling and other overhead to the IT power the servers draw. Placed at the centre of Jeffersonville. Grid: U.S. Energy Information Administration, Hourly Electric Grid Monitor (Form EIA-930), public domain, retrieved 16 Oct 2026; utilities by county from Form EIA-861 and the U.S. Census Bureau Geocoder, public domain. Power plants: U.S. Energy Information Administration, Form EIA-860M, public domain, inventory as of September 2026. All sources.