Europe

Iceland

Iceland has one of the world’s largest AI campuses, drawing 7 MW today and computing with 6K H100-equivalents. 2 AI supercomputers outside the tracked campuses are in Epoch AI’s list to Jul 2025, with 5,240 H100-equivalents.

AI campuses
7 MW
1 · 13 MW by 2030
AI compute now
6K
H100e at the campuses · Oct 2026
AI supercomputers
5,240
H100e · 2 machines · to Jul 2025
Cloud regions
0
live, general access · 1 other

AI campuses

Epoch AI · facility power
Site Owner Today 2030
Nscale Keflavik Nscale 7 MW 13 MW

AI supercomputers

Epoch AI · to Jul 2025
Name Owner H100e Status Since
Nebius ISEG2 Nebius AI 4,992 Existing Jun 2025
Opera Iceland KEF-1 SuperPOD Opera 248 Existing Feb 2024

Cloud regions

one provider · 1 region

Nebius

  • eu-north2: Iceland eu-north2 Reykjavik Live · dedicated

Hydro made 71% of the power in Iceland

share of generation · Ember · Sep 2025 to Aug 2026

Iceland World

  1. Gas 0% against 21% for World
  2. Coal 0% against 33% for World
  3. Other fossil <1% against 3% for World
  4. Nuclear 0% against 9% for World
  5. Wind <1% against 9% for World
  6. Solar 0% against 10% for World
  7. Hydro 71% against 14% for World
  8. Bio & other 28% against 2% for World

Fossil <1% (0 pts on a year earlier) · nuclear 0% · renewables 100% · 17 g CO2e per kWh, life cycle · Sep 2025 to Aug 2026. Generation only, without imports. Every country in the registry, side by side.

Data-centre electricity

International Energy Agency

Europe, as the IEA defines it

  • 2024 estimated 70 TWh · slightly less than 2% IEA 2025, p. 58 Data centres account for slightly less than 2% of Europe’s electricity consumption, a share that is higher than China’s (1.1%). However, in absolute terms, Europe’s consumption is lower, at an estimated 70 TWh in 2024.
  • Change, 2024 to 2030 more than +45 TWh IEA 2025, p. 64 Consumption increases by around 240 TWh (up 130%) in the United States, compared to the 2024 level (Figure 2.12). In China it increases by around 175 TWh (up 170%). In Europe it grows by more than 45 TWh (up 70%). Japan increases by around 15 TWh (up 80%).
  • 2030, base case around 115 TWh IEA 2026, p. 64 This is comparable to the projected future demand from data centres in Europe, which is projected to grow to around 115 TWh, accounting for approximately 12% of global demand.