CoreWeave · Muskogee, Oklahoma

CoreWeave Muskogee OK

181MW projected

The power of 150,000 US homes, once built.

Under construction. Projected to draw 181 MW by Dec 2027.

Chips
B300
Users
OpenAI (unconfirmed)
Embed

Each frame credits Epoch AI and links back to its page. Preview it.

Cite
Download
Post on X
CoreWeave Muskogee OK on a globe of the world's largest AI data centers.

Power over time

facility power · 5 milestones
Every milestone
  1. 18 Nov 2024 — Core Scientific, CoreWeave, and Port Muskogee publicly announce groundbreaking for the 100 MW Muskogee HPC data center. Core Scientific says the site will provide about 70 MW of critical IT load for CoreWeave's NVIDIA GPUs.
  2. 9 Apr 2026 — Based on satellite imagery, Building 1 looks mostly complete, but the site still appears to be in construction or commissioning. Not much progress has happened in the past 4 months, and a Q2 2026 finish seems unlikely.
  3. 13 Jun 2026 — Based on satellite imagery, Building 1 has completed construction, with adjacent land cleared for what we're assuming will have power substations/generators. We can assume Building 1 is not operational from all the yard work directly surrounding it, and the lack of a parking lot. Building 2 (The one not leased to CoreWeave) is still in land clearing phase.
  4. 31 Dec 2026 · projected 98 MW Estimating building 1 is operational by the end of the year, judging from the building currently completed, the completed power substation to the southwest. The surrounding yard work/construction will likely still take several months, judging from the slow pace.
  5. 31 Dec 2027 · projected 181 MW Core Scientific expects initial delivery of the second, unleased 82.5 MW Muskogee building in Q4 2027. Not signed to have CoreWeave GPUs as of yet, but may change in the future. Source: https://www.sec.gov/Archives/edgar/data/1839341/000162828026030918/exhibit991polarispressre.htm

Every step Epoch planned here on 2 Sep 2026 is still on plan. Planned against reached

Wind and coal lead the two grids that serve Muskogee County

net generation by fuel · Oct 2025 to Sep 2026

Southwest Power Pool SWPP · balancing authority

  1. Gas 27%
  2. Coal 26%
  3. Nuclear 5%
  4. Wind 37%
  5. Solar 2%
  6. Hydro 3%
  7. Other <1%

Associated Electric Cooperative, Inc. AECI · balancing authority

  1. Gas 39%
  2. Coal 49%
  3. Nuclear 0%
  4. Wind 13%
  5. Solar 0%
  6. Hydro 0%
  7. Other <1%

The utilities that serve Muskogee County, OK, report to 2 grids; the data does not show which one feeds the site. Each grid is a balancing authority. Generation only; imports are excluded. Every grid behind an AI site.

Owners plan 400 MW of new power in Muskogee County, all solar

power plants in Muskogee County · EIA-860M, September 2026
  1. High Spring Solar Energy Solar · 400 MW · Dec 2027 · proposed · High Spring Solar Energy

In service in Muskogee County today: 1.9 GW. Since January 2023: 0 MW added, 0 MW retired. A plant in the same county does not mean it feeds the site. Power plants near every AI site.

Sources

selected by Epoch AI
  1. Core Scientific ground breaking announcement
  2. Port Muskogee ground breaking announcement
  3. Air quality permit application

Data: Epoch AI, “AI data centers”, CC BY 4.0, retrieved 22 Oct 2026. Facility power adds cooling and other overhead to the IT power the servers draw. Placed at the centre of Muskogee. Grid: U.S. Energy Information Administration, Hourly Electric Grid Monitor (Form EIA-930), public domain, retrieved 16 Oct 2026; utilities by county from Form EIA-861 and the U.S. Census Bureau Geocoder, public domain. Power plants: U.S. Energy Information Administration, Form EIA-860M, public domain, inventory as of September 2026. All sources.