SpaceXAI · Atlanta, Georgia

xAI QTS Atlanta

24MW

The power of 19,000 US homes.

Drawing power since Feb 2025.

Capital cost
$0.7B
Chips
H100, A100
Users
SpaceXAI
Embed

Each frame credits Epoch AI and links back to its page. Preview it.

Cite
Download
Post on X
xAI QTS Atlanta on a globe of the world's largest AI data centers.

Power over time

facility power · 4 milestones
Every milestone
  1. 23 Jan 2024 — X Corp's $700 million investment in AI training hardware for the Atlanta data center is approved by the Development Authority of Fulton County (bond resolution fact sheet).
  2. 20 Feb 2025 24 MW xAI's GPU cluster in the QTS Atlanta building at 1025 Jefferson Street NW is operational around this time. This date is a tentative estimate: Business Insider reported the buildout in February 2025, so the cluster likely came online around or shortly after then, though the exact date is not disclosed. The cluster comprises 11,000 NVIDIA H100 and about 1,448 A100 GPUs, based on documents submitted to Develop Fulton as reported by Business Insider. xAI occupies part of this multi-tenant building, so its cooling is not attributed to xAI alone.
  3. 21 Aug 2025 24 MW No significant change to the building since the cluster became operational.
  4. 10 Jul 2026 24 MW No significant change to the building since the August 2025 image.

Gas made 49% of the power on this site's grid

net generation by fuel · Oct 2025 to Sep 2026

Southern Company Services, Inc. - Trans SOCO · balancing authority

  1. Gas 49%
  2. Coal 18%
  3. Nuclear 25%
  4. Wind 0%
  5. Solar 5%
  6. Hydro 2%
  7. Other 1%

The grid of the utilities that serve Fulton County, GA. Each grid is a balancing authority. Generation only; imports are excluded. Every grid behind an AI site.

No new plant is planned in Fulton County

power plants in Fulton County · EIA-860M, September 2026

In service in Fulton County today: 59 MW. Since January 2023: 4 MW added, 16 MW retired. A plant in the same county does not mean it feeds the site. Power plants near every AI site.

Sources

selected by Epoch AI
  1. Develop Fulton bond fact sheet: X Corp Generative AI Equipment Project (Jan 23, 2024)
  2. Business Insider: Elon Musk's new Atlanta data center for xAI has $700 million in AI equipment
  3. Fortune: Elon Musk's xAI is sharing X's equipment at its Atlanta data center (Jan 24, 2025)

Data: Epoch AI, “AI data centers”, CC BY 4.0, retrieved 22 Oct 2026. Facility power adds cooling and other overhead to the IT power the servers draw. Placed at the centre of Atlanta. Grid: U.S. Energy Information Administration, Hourly Electric Grid Monitor (Form EIA-930), public domain, retrieved 16 Oct 2026; utilities by county from Form EIA-861 and the U.S. Census Bureau Geocoder, public domain. Power plants: U.S. Energy Information Administration, Form EIA-860M, public domain, inventory as of September 2026. All sources.