CoreWeave · Ellendale, North Dakota

CoreWeave Ellendale ND

88MW

The power of 71,000 US homes.

Drawing power since Oct 2025. Projected to reach 520 MW by Jun 2027.

Capital cost
$2.6B
Chips
B200
Users
OpenAI (unconfirmed)
Embed

Each frame credits Epoch AI and links back to its page. Preview it.

Cite
Download
Post on X
CoreWeave Ellendale ND on a globe of the world's largest AI data centers.

Power over time

facility power · 9 milestones
Every milestone
  1. 31 Oct 2023 — Start of construction for the first building, according to Applied Digital. CoreWeave was not leased yet at this site, but this is the construction start date we're using for relevance.
  2. 28 May 2025 — CoreWeave signed the first lease package for 250 MW. No buildings online yet. This is according to an SEC 8-k filing from this date.
  3. 29 Aug 2025 — A new 150 MW lease brings CoreWeave to 400 MW total contracted. The project is now clearly scheduled to be a three-building CoreWeave campus.
  4. 27 Oct 2025 65 MW The first 50 MW slice of Building 1 has reached Ready for Service status according to this report. This is the first point where we would count any CoreWeave capacity as operational.
  5. 24 Nov 2025 88 MW This Applied Digital report says the rest of Building 1 has reached Ready for Service, bringing the first building to its expected 100 MW. We can treat this as the first completed data center building.
  6. 27 Mar 2026 88 MW According to satellite imagery, Building 1 looks complete and in service, with the surrounding power/cooling equipment also operational. (Note: this image doesn't provide a view of buildings 2 or 3, though it's very safe to assume they're under construction at this stage, considering they're still under construction in the satellite image 3 months from now.)
  7. 30 Jun 2026 88 MW According to satellite imagery, Building 2 is fully roofed and shell complete, with rooftop chillers mostly installed. Building 3 construction is well underway, with about 1/4 of the roofing done and the foundation laid out.
  8. 31 Dec 2026 · projected 114 MW According to the schedule, Building 2 should be online sometime in the second half of 2026. We can estimate the end of 2026 for 250 MW operational.
  9. 1 Jun 2027 · projected 520 MW According to schedule, Building 3 should come online in the first half of 2027. That would bring the full PF1 campus to 400 MW, according to the contract.

Every step Epoch planned here on 2 Sep 2026 is still on plan. Planned against reached

Gas and wind lead the two grids that serve Dickey County

net generation by fuel · Oct 2025 to Sep 2026

Midcontinent Independent Transmission System Operator, Inc. MISO · balancing authority

  1. Gas 37%
  2. Coal 26%
  3. Nuclear 14%
  4. Wind 15%
  5. Solar 6%
  6. Hydro 1%
  7. Other 1%

Southwest Power Pool SWPP · balancing authority

  1. Gas 27%
  2. Coal 26%
  3. Nuclear 5%
  4. Wind 37%
  5. Solar 2%
  6. Hydro 3%
  7. Other <1%

The utilities that serve Dickey County, ND, report to 2 grids; the data does not show which one feeds the site. Each grid is a balancing authority. Generation only; imports are excluded. Every grid behind an AI site.

No new plant is planned in Dickey County

power plants in Dickey County · EIA-860M, September 2026

In service in Dickey County today: 330 MW. Since January 2023: 0 MW added, 0 MW retired. A plant in the same county does not mean it feeds the site. Power plants near every AI site.

Sources

selected by Epoch AI
  1. Applied Digital Announces 250MW AI Data Center Lease With CoreWeave
  2. SEC 8k Filing with Applied Digital
  3. Applied Digital Delivers Second Building at Polaris Forge 1

Data: Epoch AI, “AI data centers”, CC BY 4.0, retrieved 22 Oct 2026. Facility power adds cooling and other overhead to the IT power the servers draw. Placed at the centre of Ellendale. Grid: U.S. Energy Information Administration, Hourly Electric Grid Monitor (Form EIA-930), public domain, retrieved 16 Oct 2026; utilities by county from Form EIA-861 and the U.S. Census Bureau Geocoder, public domain. Power plants: U.S. Energy Information Administration, Form EIA-860M, public domain, inventory as of September 2026. All sources.