Vantage TX1
45MW
The power of 36,000 US homes.
Drawing power since Feb 2026. Projected to reach 179 MW by Aug 2027.
- H100-equivalents
- 39K
- Capital cost
- $1.2B
- Chips
- B200
Power over time
facility power · 3 milestonesEvery milestone
- 15 Dec 2023 — Land clearing begins for both Building 1 & Building 2
- 15 Feb 2026 45 MW Building 1 operational; Roads around Building 1 complete, all cooling and side generator equipment construction has since finished as well. Although this is still earlier than the completion date reported on TDLR, based on the appearance, we believe it is operational. Reported IT power of 32 MW. Source
- 31 Aug 2027 · projected 179 MW Estimated construction completion date of Building 2. Construction Project Filing
Every step Epoch planned here on 2 Sep 2026 is still on plan. Planned against reached
Gas made 40% of the power on this site's grid
net generation by fuel · Oct 2025 to Sep 2026Electric Reliability Council of Texas, Inc. ERCO · balancing authority
- Gas 40%
- Coal 12%
- Nuclear 8%
- Wind 24%
- Solar 16%
- Hydro <1%
- Other <1%
The grid of the utilities that serve Bexar County, TX. Each grid is a balancing authority. Generation only; imports are excluded. Every grid behind an AI site.
Owners plan 750 MW of new power in Bexar County, mostly storage
power plants in Bexar County · EIA-860M, September 2026- Alamo City ESS
- Rush ESS
- Padua 3
- El Patrimonio
In service in Bexar County today: 5.0 GW. Since January 2023: 511 MW added, 942 MW retired. Owners plan to retire 1.5 GW more. A plant in the same county does not mean it feeds the site. Power plants near every AI site.
Sources
selected by Epoch AIData: Epoch AI, “AI data centers”, CC BY 4.0, retrieved 22 Oct 2026. Facility power adds cooling and other overhead to the IT power the servers draw. Placed at the centre of San Antonio. Grid: U.S. Energy Information Administration, Hourly Electric Grid Monitor (Form EIA-930), public domain, retrieved 16 Oct 2026; utilities by county from Form EIA-861 and the U.S. Census Bureau Geocoder, public domain. Power plants: U.S. Energy Information Administration, Form EIA-860M, public domain, inventory as of September 2026. All sources.