Asia

Malaysia

Malaysia has 3 of the world’s largest AI campuses, drawing 1.6 GW today and computing with 1.3M H100-equivalents. One AI supercomputer outside the tracked campuses is in Epoch AI’s list to Jul 2025. 6 public cloud regions are live here, from 5 providers.

AI campuses
1.6 GW
3 · 1.6 GW by 2030
AI compute now
1.3M
H100e at the campuses · Oct 2026
AI supercomputers
—
no H100e given · one machine · to Jul 2025
Cloud regions
6
live, general access · 1 announced · 1 other

AI campuses

Epoch AI · facility power
Site Owner Today 2030
DayOne Nusajaya Undisclosed 662 MW 662 MW
DayOne Kempas Undisclosed 590 MW 590 MW
Bridge Data Centres MY06 ByteDance 315 MW 315 MW

AI supercomputers

Epoch AI · to Jul 2025
Name Owner H100e Status Since
Alibaba Cloud in Malaysia Phase 2 Alibaba — Existing Jul 2025

Cloud regions

6 providers · 8 regions

AWS

  • Asia Pacific (Malaysia) ap-southeast-5 Kuala Lumpur Live

Microsoft Azure

  • Malaysia West malaysiawest Kuala Lumpur Live
  • Southeast Asia 3 Kuala Lumpur Announced

Oracle Cloud Infrastructure

  • Malaysia West 2 (Kulai) ap-kulai-2 Kulai Live

Alibaba Cloud

  • Malaysia (Johor) ap-southeast-8 Johor Bahru Live
  • Malaysia (Kuala Lumpur) ap-southeast-3 Kuala Lumpur Live

Tencent Cloud

  • 亚太和中东(新山) ap-johorbahru Johor Bahru Live

Huawei Cloud

  • AP-Kuala Lumpur-OP6 my-kualalumpur-1 Kuala Lumpur Live · partner-operated

Coal made 43% of the power in Malaysia

share of generation · Ember · Jun 2025 to May 2026

Malaysia World

  1. Gas 34% against 21% for World
  2. Coal 43% against 33% for World
  3. Other fossil 1% against 3% for World
  4. Nuclear 0% against 9% for World
  5. Wind 0% against 9% for World
  6. Solar 2% against 10% for World
  7. Hydro 17% against 14% for World
  8. Bio & other 3% against 2% for World

Fossil 78% (+1 pt on a year earlier) · nuclear 0% · renewables 22% · 637 g CO2e per kWh, life cycle · Jun 2025 to May 2026. Generation only, without imports. Every country in the registry, side by side.

Data-centre electricity

International Energy Agency

Asia Pacific excluding China, as the IEA defines it

  • 2030, base case around 100 TWh IEA 2026, p. 64 Regionally, the Asia Pacific region – excluding China – is projected to consume around 100 TWh for data centres in 2030, which accounts for 11% of future global electricity consumption by data centres.