Nscale · Sines, Setúbal, Portugal
Start Campus Sines Data Campus
40MW
The power of 32,000 US homes.
Drawing power since Apr 2026. Projected to reach 280 MW by Sep 2027.
- H100-equivalents
- 32K
- Capital cost
- $1.3B
- Chips
- B300
- Users
- Microsoft
Power over time
facility power · 5 milestonesEvery milestone
- 1 Jan 2022 — Land clearing begins for Building 1 (SIN01)
- 31 Oct 2024 — Building 1 (SIN01) is completed, but at this point it likely not being used for AI as the collaboration with Microsoft that resulted in GB300s did not occur until Q1 2026. The completion is based both on satellite imagery, which shows the building fully completed, and a March 2025 article that says it "has been in operation since October", which is October of 2024.
- 3 Apr 2026 40 MW Building 1 (SIN01) operational for AI, with the first deployment of 12,600 Nvidia GB300 NVL72s to the site being reported completed "Q1 2026" based on the corporate announcement. Land clearing also begins for Building 2 (SIN02), with faint dirt outlines for roads and building foundations visible.
- 16 Aug 2026 40 MW Satellite imagery shows two black outlines, suggesting two buildings going up on a second adjacent site. There is an outline of another building as well. Further to the east, there is land clearing.
- 30 Sep 2027 · projected 280 MW Building 2 (SIN02) projected to be operational. This is based on the timeline provided in the factsheet for the site. We expect VR200 GPUs to be used as a lot of those chips will have already been available in September 2027, and the "up to 600kW racks" in the factsheet suggest they are aiming for this.
Every step Epoch planned here on 2 Sep 2026 is still on plan. Planned against reached
Wind made 30% of the power in Portugal
share of generation · Oct 2025 to Sep 2026Portugal World
- Gas 18% against 21% for World
- Coal 0% against 33% for World
- Other fossil 1% against 3% for World
- Nuclear 0% against 9% for World
- Wind 30% against 9% for World
- Solar 22% against 10% for World
- Hydro 24% against 14% for World
- Bio & other 6% against 2% for World
Fossil 18% (+1 pt on a year earlier) · nuclear 0% · renewables 82% · 126 g CO2e per kWh, life cycle · Oct 2025 to Sep 2026. Generation for all of Portugal, without imports; the data does not show which grid feeds the site. Every country behind an AI site.
Sources
selected by Epoch AIData: Epoch AI, “AI data centers”, CC BY 4.0, retrieved 22 Oct 2026. Facility power adds cooling and other overhead to the IT power the servers draw. Placed at the centre of Sines. Grid: Ember, “Monthly Electricity Data and Yearly Electricity Data”, CC BY 4.0, retrieved 11 Oct 2026; shares computed here. All sources.