Power · power plants near AI

23.2 GW of new power plants are planned in AI data-center counties

A plant in the same county does not mean it feeds the data center: a plant sells into its grid, and this data does not say who buys its power. A planned date can move, and a planned plant can be cancelled. EIA’s inventory as of September 2026; AI sites retrieved 22 Oct 2026.

Embed

The frame credits U.S. Energy Information Administration and Epoch AI and links back to its page. Preview it.

Cite
CSV Post on X

Gas makes up 40% of planned power there, 24% nationwide

Nameplate capacity planned, by fuel · EIA-860M, September 2026

AI counties All planned in the US, 290.2 GW

Planned 23.2 GW in 59 AI counties · 134 generators

  1. Gas 40% against 24% for All planned in the US, 290.2 GW
  2. Coal 0% against 0% for All planned in the US, 290.2 GW
  3. Nuclear 0% against 2% for All planned in the US, 290.2 GW
  4. Wind 1% against 8% for All planned in the US, 290.2 GW
  5. Solar 32% against 42% for All planned in the US, 290.2 GW
  6. Hydro 0% against <1% for All planned in the US, 290.2 GW
  7. Storage 26% against 23% for All planned in the US, 290.2 GW
  8. Other 0% against <1% for All planned in the US, 290.2 GW

AI counties All added in the US, 194.9 GW

In service since 2023 17.7 GW · 211 generators

  1. Gas 13% against 11% for All added in the US, 194.9 GW
  2. Coal 0% against <1% for All added in the US, 194.9 GW
  3. Nuclear 0% against 1% for All added in the US, 194.9 GW
  4. Wind 2% against 13% for All added in the US, 194.9 GW
  5. Solar 51% against 50% for All added in the US, 194.9 GW
  6. Hydro <1% against <1% for All added in the US, 194.9 GW
  7. Storage 34% against 24% for All added in the US, 194.9 GW
  8. Other <1% against <1% for All added in the US, 194.9 GW

Each bar is a share of nameplate capacity in the 59 counties that hold a tracked US AI data center. The tick is the same share for every generator in the US. Storage holds power and makes none. 17.7 GW came into service there since January 2023, 51% of it solar.

6.8 GW of it is under construction

planned capacity by the owner’s reported status
Status reported to EIA AI counties United States
Planned for installation, but regulatory approvals not initiated 8.2 GW 100.6 GW
Regulatory approvals pending. Not under construction 6.7 GW 64.7 GW
Regulatory approvals received. Not under construction 1.4 GW 27.0 GW
Under construction, less than or equal to 50 percent complete 3.9 GW 54.1 GW
Under construction, more than 50 percent complete 1.3 GW 26.1 GW
Construction complete, but not yet in commercial operation 1.6 GW 17.7 GW
Every planned generator 23.2 GW 290.2 GW

The last three rows are under construction, or built and not yet in commercial operation. The first three are proposed. EIA calls the inventory preliminary, and an owner reports each status itself.

Richland Parish, Louisiana, has the most planned: 4.7 GW, all gas

38 of the 59 AI counties have a plant planned
County AI data centers In service Since 2023 Planned Being built Retiring
Richland Parish, Louisiana Meta Hyperion 200 MW 200 MW 4.7 GW — —
Maricopa County, Arizona Google Mesa, Microsoft Goodyear, Stream Phoenix 24.0 GW 6.4 GW 3.6 GW 1.6 GW 3 MW
Wasco County, Oregon Google The Dalles 2.0 GW 212 MW 2.1 GW — —
Laramie County, Wyoming Meta Cheyenne 746 MW 256 MW 1.5 GW — —
Milam County, Texas OpenAI Stargate Milam 1.2 GW 1.2 GW 1.4 GW 1.0 GW —
Chesterfield County, Virginia CoreWeave Chester VA 504 MW 25 MW 1.2 GW 3 MW —
Bell County, Texas Meta Temple 2.8 GW 1.2 GW 903 MW 755 MW —
Lancaster County, Nebraska Google Lincoln 811 MW 4 MW 852 MW — —
Madison County, Mississippi Amazon Madison Mega Site, Amazon Ridgeland 100 MW 100 MW 819 MW 819 MW —
Bexar County, Texas Microsoft SAT14, Microsoft SAT40, Vantage TX1 5.0 GW 511 MW 750 MW 200 MW 1.5 GW
Ellis County, Texas Google Midlothian, Google Red Oak 2.5 GW 230 MW 574 MW 197 MW —
Franklin County, Ohio AWS New Albany, Google Columbus, Google New Albany, Meta Prometheus 15 MW 7 MW 400 MW 400 MW —
Ada County, Idaho Meta Kuna 828 MW 625 MW 400 MW 400 MW —
Muskogee County, Oklahoma CoreWeave Muskogee OK 1.9 GW — 400 MW — —
Niagara County, New York Anthropic Lake Mariner, Core42 Lake Mariner 3.1 GW 42 MW 333 MW — —
Taylor County, Texas Crusoe Abilene Expansion, OpenAI Stargate Abilene, OpenAI Stargate Shackelford 991 MW 20 MW 299 MW — —
Mitchell County, Texas Anthropic Barber Lake 688 MW 1 MW 276 MW — —
Sarpy County, Nebraska Google Papillion, Meta Sarpy 866 MW 528 MW 272 MW 8 MW —
Armstrong County, Texas Goodnight 266 MW 266 MW 266 MW 266 MW —
Fairfield County, Ohio Google Lancaster none — 220 MW — —
Valencia County, New Mexico Meta Los Lunas 621 MW 355 MW 208 MW 208 MW —
Dickens County, Texas Coreweave Helios 450 MW 300 MW 204 MW — —
Mayes County, Oklahoma Google Pryor (North) 4.0 GW 1.2 GW 200 MW 200 MW —
Denton County, Texas CoreWeave Denton TX 1.1 GW 348 MW 200 MW — —
Washington County, Oregon Meta-QTS Hillsboro 2 99 MW 92 MW 200 MW — —
Clark County, Indiana Meta Jeffersonville 6 MW — 200 MW — —
Loudoun County, Virginia Google Arcola 812 MW — 170 MW 170 MW —
Doña Ana County, New Mexico OpenAI Stargate New Mexico 1.1 GW 390 MW 155 MW 155 MW 217 MW
Linn County, Iowa Google Cedar Rapids, QTS Cedar Rapids 742 MW 210 MW 100 MW 100 MW —
Washtenaw County, Michigan OpenAI Stargate Michigan 316 MW 140 MW 100 MW 100 MW —
Montgomery County, Alabama Meta Montgomery 180 MW 180 MW 80 MW — —
Prince William County, Virginia Google Bristow 786 MW 2 MW 60 MW 60 MW —
Wood County, Ohio Meta Bowling Green 915 MW 15 MW 50 MW 50 MW —
Henrico County, Virginia QTS Richmond 1, QTS Richmond 2, QTS Richmond 3 398 MW — 20 MW — —
Shelby County, Tennessee Colossus 1, Colossus 2 1.6 GW 225 MW 16 MW — —
Columbia County, Pennsylvania AWS Berwick none — 15 MW 9 MW —
Racine County, Wisconsin Microsoft Fairwater Wisconsin 340 MW 328 MW 12 MW — —
Storey County, Nevada Google Storey County 1.2 GW — 1 MW 1 MW —
St. Joseph County, Indiana Anthropic-Amazon New Carlisle 1.0 GW 150 MW — — —
Fayette County, Georgia Microsoft Fairwater Atlanta none — — — —
Pottawattamie County, Iowa Google Council Bluffs (East) 1.8 GW — — — —
Douglas County, Nebraska Google Omaha 941 MW 163 MW — — 291 MW
Dakota County, Minnesota Meta Rosemount 1.1 GW 50 MW — — 847 MW
Warren County, Iowa Microsoft Project Osmium 44 MW 3 MW — — —
Madison County, Alabama Meta Huntsville 43 MW 32 MW — — —
Utah County, Utah Meta Eagle Mountain, QTS Eagle Mountain 2.2 GW 697 MW — — —
Jackson County, Missouri Google Kansas City East 2.0 GW 10 MW — — —
Manassas city, Virginia STACK Infrastructure NVA02 none — — — —
Sumner County, Tennessee Meta Gallatin 2.0 GW — — — 1.9 GW
Cherokee County, North Carolina CoreWeave Marble NC 168 MW — — — —
Aiken County, South Carolina Meta Aiken 855 MW — — — —
Dickey County, North Dakota CoreWeave Ellendale ND 330 MW — — — —
Cumberland County, New Jersey Microsoft-Nebius New Jersey 555 MW 17 MW — — 212 MW
Whitfield County, Georgia CoreWeave Dalton 1 & 2 1 MW — — — —
Fulton County, Georgia xAI QTS Atlanta 59 MW 4 MW — — —
Allen County, Indiana Google Fort Wayne none — — — —
Trumbull County, Ohio OpenAI Stargate Lordstown 2.0 GW 977 MW — — —
Lancaster County, Pennsylvania CoreWeave Lancaster Greenfield site 1.8 GW — — — —
Ozaukee County, Wisconsin OpenAI Stargate Wisconsin 1.2 GW 8 MW — — —
All 59 AI counties 77 sites 81.2 GW 17.7 GW 23.2 GW 6.8 GW 4.9 GW

A county holds the town centre that the dataset gives for a site; a site at the edge of a town can sit in the next county. “In service” is every generator of 1 MW or more running there today. “Retiring” is capacity in service whose owner reports a planned retirement date. EIA lists no generator of 1 MW or more in Fayette County, Georgia, Allen County, Indiana, Manassas city, Virginia.

The 88 planned plants in these counties, largest first

each plant’s generators added together
Plant County Fuel Capacity Planned for Stage
Deschutes Solar and BESSDECH bn, LLC Wasco County, Oregon Solar 2.0 GW Nov 2029 proposed
Franklin Farms 1&2Entergy Louisiana LLC Richland Parish, Louisiana Gas 1.6 GW Dec 2028 proposed
Richland Parish Power Station 1&2Entergy Louisiana LLC Richland Parish, Louisiana Gas 1.6 GW Mar 2030 proposed
Saddleback Generation StationCopia Power Maricopa County, Arizona Gas 1.3 GW Dec 2030 proposed
ChesterfieldVirginia Electric & Power Co Chesterfield County, Virginia Gas 1.0 GW Jun 2029 proposed
Traceview Advanced Power StationEntergy Mississippi LLC Madison County, Mississippi Gas 819 MW Aug 2028 being built
Cowboy Solar ICowboy Solar I Laramie County, Wyoming Solar 800 MW Mar 2028 to Dec 2028 proposed
Richland Parish Power Station 3Entergy Louisiana LLC Richland Parish, Louisiana Gas 780 MW Oct 2030 proposed
Richland Parish Power Station 4Entergy Louisiana LLC Richland Parish, Louisiana Gas 780 MW Oct 2030 proposed
Princeton Road StationNebraska Public Power District Lancaster County, Nebraska Gas 748 MW Jun 2029 to Dec 2029 proposed
Desert Sand BESSDESA bn, LLC Maricopa County, Arizona Solar 600 MW Dec 2028 proposed
Cowboy Solar IICowboy Solar II Laramie County, Wyoming Solar 565 MW Dec 2027 proposed
Maricopa SolarMaricopa Solar Maricopa County, Arizona Storage 550 MW Dec 2026 being built
High Spring Solar EnergyHigh Spring Solar Energy Muskogee County, Oklahoma Solar 400 MW Dec 2027 proposed
Blacks Creek SolarBlacks Creek Energy Center, LLC Ada County, Idaho Solar 400 MW Jun 2027 being built
Red HawkArizona Public Service Co Maricopa County, Arizona Gas 392 MW Oct 2027 being built
Chillingham SolarChillingham Solar LLC Bell County, Texas Solar 350 MW Dec 2026 being built
Sypert Branch SolarSypert Branch Solar LLC Milam County, Texas Solar 294 MW Dec 2026 being built
Goodnight Wind IIFGE Goodnight II, LLC Armstrong County, Texas Wind 266 MW May 2027 being built
Turtle CreekOmaha Public Power District Sarpy County, Nebraska Gas 264 MW Aug 2028 proposed
Open the other 68 planned plants
Oak Valley SolarOak Valley Solar LLC Ellis County, Texas Solar 251 MW Sep 2029 proposed
Cattlemen Solar ParkCattlemen Solar Park LLC Milam County, Texas Solar 240 MW Oct 2026 being built
Adelite Storage Project LLCAcciona Energy USA Global, LLC Milam County, Texas Storage 230 MW Mar 2028 proposed
Romero Energy CenterRomero Energy Center, LLC Maricopa County, Arizona Storage 225 MW Jun 2027 being built
Romero Energy Center II, LLCRomero Energy Center II, LLC Maricopa County, Arizona Storage 225 MW Jun 2028 being built
Eastern Cottontail SolarEDF Renewables Development, Inc. Fairfield County, Ohio Solar 220 MW Dec 2028 proposed
Hoyte SolarMilano Solar LLC Milam County, Texas Solar 207 MW Jul 2027 being built
Donegal Solar ProjectHE-Cottonwood Solar, LLC Dickens County, Texas Solar 204 MW Oct 2028 proposed
Limewood Bell Renewables SolarModal Power LLC Bell County, Texas Solar 204 MW Nov 2026 being built
Cattlemen Solar IICattlemen Solar Park II LLC Milam County, Texas Solar 200 MW Oct 2026 being built
Twelvemile Solar 3Leeward Asset Management, LLC Mayes County, Oklahoma Solar 200 MW Dec 2026 being built
Flag Run SolarMAHI bn, LLC Clark County, Indiana Solar 200 MW Dec 2029 proposed
Tualatin Battery Energy Storage SystemTUAL bn, LLC Washington County, Oregon Storage 200 MW Dec 2027 proposed
Alamo City ESSAlamo City ESS LLC Bexar County, Texas Storage 200 MW Jul 2027 proposed
Rush ESSRush ESS LLC Bexar County, Texas Storage 200 MW Dec 2031 proposed
FlintFlint Franklin County, Ohio Storage 200 MW Jul 2027 being built
Padua 3Padua 3 Bexar County, Texas Storage 200 MW Oct 2026 being built
Pleasant Prairie Solar Energy LLCInvenergy Services LLC Franklin County, Ohio Solar 200 MW Dec 2026 being built
Star Light Energy CenterStar Light Energy Center Valencia County, New Mexico Solar 200 MW Dec 2026 being built
Oakley BESSOakley BESS LLC Denton County, Texas Storage 200 MW Dec 2030 proposed
Oystercatcher SolarCardinal Investment Company, Inc. Ellis County, Texas Solar 197 MW Mar 2027 being built
Hackberry Creek SolarHackberry Creek Solar, LLC Mitchell County, Texas Solar 175 MW Mar 2028 proposed
Chester Solar Technology Park, LLCChester Solar Technology Park, LLC Chesterfield County, Virginia Solar 160 MW Oct 2027 proposed
Chimney Rock BESSRIC Development, LLC Taylor County, Texas Storage 156 MW Apr 2028 proposed
Dulles Solar and StorageDominion Energy Inc. Loudoun County, Virginia Solar 150 MW Dec 2026 being built
AgaveArizona Public Service Co Maricopa County, Arizona Storage 150 MW Nov 2026 being built
Santa Teresa SolarSanta Teresa Solar Doña Ana County, New Mexico Storage 150 MW Oct 2026 being built
El PatrimonioHeritage Solar LLC Bexar County, Texas Solar 150 MW Sep 2027 proposed
Sierra Luna Energy StorageSierra Luna Energy Storage LLC Maricopa County, Arizona Storage 150 MW Dec 2030 proposed
Cosper SolarGransolar Texas Twenty LLC Bell County, Texas Solar 148 MW Nov 2027 proposed
Summerhill BESSRIC Development, LLC Taylor County, Texas Storage 143 MW Dec 2028 proposed
Oxbow HillCypress Creek Renewables Niagara County, New York Solar 140 MW May 2029 proposed
Dolomite StorageBelltown Power Texas 2, LLC Ellis County, Texas Storage 126 MW Jul 2028 proposed
Cheyenne Prairie Generating StationBlack Hills Service Company LLC Laramie County, Wyoming Gas 120 MW Dec 2028 proposed
Terry Bundy Generating StationLincoln Electric System Lancaster County, Nebraska Gas 104 MW Jun 2029 proposed
Sunset SolarAvangrid Power LLC Wasco County, Oregon Solar 103 MW Dec 2028 proposed
Dolce BESS, LLCSamsung C&T Renewables, LLC Mitchell County, Texas Storage 101 MW Apr 2028 proposed
Hermes Solar PVBell 1 Solar, LLC Bell County, Texas Solar 100 MW Oct 2026 being built
Hermes Storage BESSBell 1 Storage, LLC Bell County, Texas Storage 100 MW Oct 2026 being built
Yaupon Solar Project (Hybrid)Yaupon Solar, LLC Milam County, Texas Storage 100 MW Dec 2027 proposed
Somerset Solar LLCAES Clean Energy Niagara County, New York Solar 100 MW Oct 2029 proposed
Voyager Energy StorageVoyager Energy Storage LLC Washtenaw County, Michigan Storage 100 MW Jan 2027 being built
Coggon Solar LLCClenera DevCo LLC Linn County, Iowa Solar 100 MW Dec 2027 being built
Stoneridge Solar, LLCRWE Americas, LLC Milam County, Texas Storage 100 MW Dec 2026 being built
White Tank Energy StorageWhite Tank Energy Storage LLC Maricopa County, Arizona Storage 100 MW Apr 2027 being built
Bear RidgeCypress Creek Renewables Niagara County, New York Solar 93 MW May 2028 proposed
SR Hope HullSR Hope Hull, LLC Montgomery County, Alabama Solar 80 MW Dec 2027 proposed
Juliet Energy Project, LLCLightsource Renewable Energy Asset Management, LLC Wood County, Ohio Solar 50 MW Oct 2026 being built
Bridleton SolarDominion Renewable Energy Henrico County, Virginia Solar 20 MW Oct 2028 proposed
Bethlehem Energy Center, LLC - (VA)East Point Energy, LLC Prince William County, Virginia Storage 20 MW Dec 2026 being built
Evergreen Energy Center, LLCEast Point Energy, LLC Loudoun County, Virginia Storage 20 MW Oct 2026 being built
Railroad Energy Center, LLCEast Point Energy, LLC Prince William County, Virginia Storage 20 MW Dec 2026 being built
Reid Energy Center, LLCEast Point Energy, LLC Prince William County, Virginia Storage 20 MW Dec 2026 being built
SR ShelbySR Shelby, LLC Shelby County, Tennessee Solar 10 MW Dec 2027 proposed
Papillion Creek WastewaterCity of Omaha - (NE) Sarpy County, Nebraska Gas 8 MW Nov 2026 being built
SR Shelby II, LLCSR Shelby II, LLC Shelby County, Tennessee Solar 6 MW Feb 2028 proposed
Root River Solar WI, LLCOneEnergy, Inc. Racine County, Wisconsin Solar 6 MW Dec 2026 proposed
Tichigan Solar WI, LLCOneEnergy, Inc. Racine County, Wisconsin Solar 6 MW Dec 2026 proposed
USS Jornada SolarUSS Jornada Solar LLC Doña Ana County, New Mexico Solar 5 MW Dec 2026 being built
Trigo Sol Solar CSGTrigo Sol Solar Valencia County, New Mexico Solar 5 MW Jan 2027 being built
USS Meadow Lake SolarUSS Meadow Lake Solar LLC Valencia County, New Mexico Solar 3 MW Dec 2026 being built
Montour Tower Drive Solar LLCDimension Energy LLC Columbia County, Pennsylvania Solar 3 MW Sep 2027 proposed
Greenwood Bottom Road Solar LLCDimension Energy LLC Columbia County, Pennsylvania Solar 3 MW Mar 2027 being built
Greenwood Route 254 Solar LLCDimension Energy LLC Columbia County, Pennsylvania Solar 3 MW Mar 2027 being built
Madison Taylor Road Solar LLCDimension Energy LLC Columbia County, Pennsylvania Solar 3 MW Mar 2027 being built
Penn Shoofly Solar LLCDimension Energy LLC Columbia County, Pennsylvania Solar 3 MW May 2027 proposed
Petersburg - VA 0224 (Murphy)CVE US VA Petersburg 224 LLC Chesterfield County, Virginia Solar 3 MW Dec 2027 being built
Tesla Reno GigaFactoryTesla Inc. Storey County, Nevada Solar 1 MW Dec 2026 being built

The fuel is the one with the most capacity at the plant; a solar plant with batteries can list both. The owner is the entity that reports the plant to EIA. A plant can be cancelled or move to a later date, and the next monthly inventory will show it.

2.7 GW has retired there since 2023, with 4.9 GW more planned

every change by fuel, in the 59 AI counties
Fuel Added since 2023 Retired since 2023 Planned Planned retirements
Gas 2.3 GW 151 MW 9.4 GW 3.1 GW
Coal — 2.0 GW — 1.8 GW
Nuclear — — — —
Wind 371 MW 11 MW 266 MW —
Solar 9.0 GW 2 MW 7.5 GW 3 MW
Hydro 4 MW — — —
Storage 6.0 GW — 6.0 GW —
Other 7 MW 564 MW — 4 MW
Every fuel 17.7 GW 2.7 GW 23.2 GW 4.9 GW