Power prices where AI is building

Home power prices rise 26% near AI data centers, 29% elsewhere

Home electricity prices, median state, 2021 to the 12 months to August 2026. The comparison does not show cause.

All the electricity generated

newest twelve months · Ember
United States
4,641 TWh
Oct 2025 to Sep 2026
World
31,640 TWh
Sep 2025 to Aug 2026
All US data centres
192 TWh
2024 · 4.7% of US use

Every source and every grid. The AI campuses on this page draw from these totals. Ember, CC BY 4.0. All US data centres used 192 TWh in 2024, 4.7% of the country’s use, by Berkeley Lab’s estimate for its last historical year, crypto mining left out. That year is not Ember’s period. Berkeley Lab, United States Data Center Energy Usage Report: 2025 Update, pp. 8 to 10, CC BY 4.0.

The IEA expects data centers to use 950 TWh by 2030

all data centers, worldwide · IEA
2024
415 TWh
2025
485 TWh
2030 · base case
950 TWh

about 1.5% of world electricity in 2024, and around 3% by 2030. AI-focused data centers reach about 465 TWh in 2030. IEA, CC BY 4.0.

By region, 2024

  1. United States more than 4% 180 TWh
  2. China 100 TWh
  3. Europe slightly less than 2% 70 TWh
  4. Japan about 2% <20 TWh
  5. India about 0.5% 9 TWh

Find your state

Every state as a table
  1. AK +19%
  2. ME +74%
  3. WI +29%
  4. VT +24%
  5. NH +36%
  6. WA +40%
  7. ID +26%
  8. MT +24%
  9. ND +14%
  10. MN +21%
  11. IL +44%
  12. MI +21%
  13. NY +47%
  14. MA +33%
  15. OR +37%
  16. NV +17%
  17. WY +25%
  18. SD +17%
  19. IA +12%
  20. IN +26%
  21. OH +44%
  22. PA +52%
  23. NJ +45%
  24. CT +25%
  25. RI +32%
  26. CA +42%
  27. UT +27%
  28. CO +27%
  29. NE +19%
  30. MO +22%
  31. KY +21%
  32. WV +28%
  33. VA +39%
  34. MD +61%
  35. DE +44%
  36. AZ +23%
  37. NM +13%
  38. KS +17%
  39. AR +20%
  40. TN +23%
  41. NC +31%
  42. SC +23%
  43. DC +87%
  44. OK +26%
  45. LA +18%
  46. MS +29%
  47. AL +27%
  48. GA +21%
  49. HI +32%
  50. TX +32%
  51. FL +29%
AI capacity / state demand None drawing power Under 2% 2–5% 5–10% 10% or more Planned only Number on a tile: change in home power prices since 2021
Embed

On a phone page, 375 px wide, set the height to 770.

The frame credits U.S. Energy Information Administration and Epoch AI and links back to its page. Preview it.

On a light page, end the frame’s address with ?theme=light. Preview it light.

Cite
Download
Post on X

Prices and AI capacity

Prices rose about the same with and without AI data centers

+26%against+29%

The median state's rise in home power prices, with and without an AI data center drawing power.

AI data centers drawing power · 27 states

None drawing power · 23 states and DC

Change in home power prices, 2021 to the latest twelve months. One block per state.

Most of the AI capacity switched on in the last year

62%

of the AI capacity drawing power in US states switched on in the last year. Utilities reset rates after they spend, so a price effect can come later.

  1. A year ago · 13 Nov 2025 6.2 GW
  2. Today · 13 Nov 2026 16.2 GW
  3. 1 Jan 2030 · projected 43.4 GW

Facility power of the AI data centers Epoch AI tracks in US states. The projection is Epoch's.

Gas made 37% of the power on the grids that serve AI data centers

23 grids · net generation · Oct 2025 to Sep 2026

The 23 grids that serve AI data centers United States

  1. Gas 37% against 39% for the United States
  2. Coal 18% against 17% for the United States
  3. Nuclear 20% against 18% for the United States
  4. Wind 12% against 11% for the United States
  5. Solar 6% against 7% for the United States
  6. Hydro 5% against 6% for the United States
  7. Other 1% against 2% for the United States
Fuel mix of each grid that serves a county with an AI data center, Oct 2025 to Sep 2026
Grid Tracked AI today GasCoalNuclearWindSolarHydroOther
PJM Interconnection, LLC PJM · 19 sites 4.6 GW 41% 17% 31% 4% 3% 2% 3%
Midcontinent Independent Transmission System Operator, Inc. MISO · 15 sites 3.4 GW 37% 26% 14% 15% 6% 1% 1%
Electric Reliability Council of Texas, Inc. ERCO · 14 sites 2.4 GW 40% 12% 8% 24% 16% <1% <1%
Tennessee Valley Authority TVA · 6 sites 2.1 GW 33% 16% 41% 0% 2% 7% <1%
Southwest Power Pool SWPP · 10 sites 1.7 GW 27% 26% 5% 37% 2% 3% <1%
Southern Company Services, Inc. - Trans SOCO · 4 sites 1.1 GW 49% 18% 25% 0% 5% 2% 1%
Arizona Public Service Company AZPS · 3 sites 577 MW 39% 26% 0% 10% 24% 0% 1%
Salt River Project SRP · 3 sites 577 MW 33% 8% 51% 1% 7% <1% 0%
Western Area Power Administration - Desert Southwest Region WALC · 3 sites 577 MW 48% 0% 0% 9% 6% 37% 0%
Associated Electric Cooperative, Inc. AECI · 3 sites 568 MW 39% 49% 0% 13% 0% 0% <1%
Bonneville Power Administration BPAT · 2 sites 428 MW 4% 0% 11% 8% 1% 76% 1%
New York Independent System Operator NYIS · 2 sites 303 MW 54% 0% 19% 5% 0% 18% 3%
Portland General Electric Company PGE · 1 site 243 MW 77% 0% 0% 0% 0% 23% <1%
Nevada Power Company NEVP · 1 site 214 MW 57% 6% 0% 1% 25% 1% 11%
Idaho Power Company IPCO · 1 site 198 MW 25% 0% 0% 12% 14% 45% 3%
PacifiCorp - West PACW · 1 site 185 MW 40% 0% 0% 22% 10% 25% 3%
Western Area Power Administration - Rocky Mountain Region WACM · 1 site · 6 of 12 months 182 MW 10% 57% 0% 14% 5% 14% 0%
PacifiCorp - East PACE · 2 sites 179 MW 17% 40% 0% 26% 14% 2% 2%
South Carolina Public Service Authority SC · 1 site 168 MW 25% 65% 0% 0% 5% 1% 3%
Dominion Energy South Carolina SCEG · 1 site 168 MW 45% 18% 26% 0% 9% 2% <1%
Public Service Company of New Mexico PNM · 2 sites 147 MW 19% 13% 0% 37% 30% <1% <1%
Duke Energy Carolinas DUK · 1 site 91 MW 26% 20% 52% 0% 2% 1% <1%
El Paso Electric Company EPE · 1 site Planned 73% 0% 0% 0% 27% 0% 0%
United Statesevery grid in EIA-930 · lower 48 16.2 GW 39%17%18%11%7%6%2%

A grid is a balancing authority. EIA-930 has 6 of the twelve months for WACM: Oct 2025 to Mar 2026. grids.csv

PJM’s capacity price hits $329.17 a megawatt-day, 11 times 2024/25

The capacity price on the bill, zone by zone

RTO capacity price a zone priced higher the cap PJM’s simulation without the cap

  1. 2024/25 Jun 2024 – May 2025 · billed $28.92 DPL-SOUTH $426.17
  2. 2025/26 Jun 2025 – May 2026 · billed $269.92 BGE $466.35
  3. 2026/27 Jun 2026 – May 2027 · on bills now $329.17 at the cap $388.57 without it
  4. 2027/28 Jun 2027 – May 2028 · auctioned, not yet billed $333.44 at the cap $529.80 without it
  5. 2028/29 Jun 2028 – May 2029 · auctioned, not yet billed $325.00 at the cap $554.72 without it

ERCOT’s large-load queue reaches 467.4 GW by 2033, 5.1 times its peak demand

Large loads waiting for the Texas grid, month by month
  1. Feb 2026 by 2030 238.6 GW of large load in the queue
  2. Mar 2026 by 2033 429.8 GW of large load in the queue
  3. Apr 2026 by 2033 438.1 GW of large load in the queue
  4. May 2026 by 2033 474.7 GW of large load in the queue
  5. Jun 2026 by 2033 465.5 GW of large load in the queue
  6. Jul 2026 by 2033 467.4 GW of large load in the queue

A load costs 2.8× as much in New Jersey as New Mexico

What a data center pays for power a year, at your own size
  1. New Mexico 5.30¢ $464,280 per MW a year
  2. Tennessee 6.65¢ $582,540 per MW a year
  3. Texas 6.65¢ $582,540 per MW a year
  4. Oklahoma 6.66¢ $583,416 per MW a year
  5. Iowa 7.43¢ $650,868 per MW a year
  6. Mississippi 7.55¢ $661,380 per MW a year
  7. South Carolina 7.66¢ $671,016 per MW a year
  8. Arizona 7.83¢ $685,908 per MW a year
  9. Alabama 7.86¢ $688,536 per MW a year
  10. North Carolina 7.89¢ $691,164 per MW a year
  11. North Dakota 7.99¢ $699,924 per MW a year
  12. Idaho 8.13¢ $712,188 per MW a year
  13. Georgia 8.18¢ $716,568 per MW a year
  14. Nebraska 8.29¢ $726,204 per MW a year
  15. Oregon 8.32¢ $728,832 per MW a year
  16. Nevada 8.49¢ $743,724 per MW a year
  17. Missouri 8.56¢ $749,856 per MW a year
  18. Utah 8.58¢ $751,608 per MW a year
  19. Wyoming 8.73¢ $764,748 per MW a year
  20. Indiana 9.05¢ $792,780 per MW a year
  21. Wisconsin 9.35¢ $819,060 per MW a year
  22. Minnesota 9.65¢ $845,340 per MW a year
  23. Ohio 9.82¢ $860,232 per MW a year
  24. Virginia 10.01¢ $876,876 per MW a year
  25. New York 10.10¢ $884,760 per MW a year
  26. Pennsylvania 10.50¢ $919,800 per MW a year
  27. New Jersey 14.81¢ $1 million per MW a year

Gas makes up 40% of planned power there, 24% nationwide

Every power plant planned where AI is built

AI counties All planned in the US, 290.2 GW

Planned 23.2 GW in 59 AI counties · 134 generators

  1. Gas 40% against 24% for All planned in the US, 290.2 GW
  2. Coal 0% against 0% for All planned in the US, 290.2 GW
  3. Nuclear 0% against 2% for All planned in the US, 290.2 GW
  4. Wind 1% against 8% for All planned in the US, 290.2 GW
  5. Solar 32% against 42% for All planned in the US, 290.2 GW
  6. Hydro 0% against <1% for All planned in the US, 290.2 GW
  7. Storage 26% against 23% for All planned in the US, 290.2 GW
  8. Other 0% against <1% for All planned in the US, 290.2 GW

AI counties All added in the US, 194.9 GW

In service since 2023 17.7 GW · 211 generators

  1. Gas 13% against 11% for All added in the US, 194.9 GW
  2. Coal 0% against <1% for All added in the US, 194.9 GW
  3. Nuclear 0% against 1% for All added in the US, 194.9 GW
  4. Wind 2% against 13% for All added in the US, 194.9 GW
  5. Solar 51% against 50% for All added in the US, 194.9 GW
  6. Hydro <1% against <1% for All added in the US, 194.9 GW
  7. Storage 34% against 24% for All added in the US, 194.9 GW
  8. Other <1% against <1% for All added in the US, 194.9 GW

45% of tracked US AI campus capacity sits where a large-load tariff applies

Every large-load tariff, and what it charges
  • Approved tariff 7.3 GW · 45%
  • Tariff filed only 0.2 GW · 1%
  • No tariff found 8.7 GW · 54%
Tracked US AI campuses drawing power now, 16.2 GW at 60 sites

Each large-load tariff is quoted from the regulator’s or the utility’s own documents.

9.6 GW of nuclear is contracted to Amazon, Meta, Google and Microsoft

Every nuclear agreement, and when its power comes

Running reactorsRestartsUpratesNew fission reactorsFusion a framework

  1. Under contract 14 agreements
    1. Running reactors: 6,917 MW
    2. Restarts: 835 MW
    3. Uprates: 1,513 MW
    4. New fission reactors: 50 MW
    5. Fusion: 250 MW
    9.6 GW
  2. In frameworks 8 agreements
    1. Uprates: 96 MW
    2. New fission reactors: 11,250 MW
    11.3 GW
  • Under contract running reactors 6,917 MW · restarts 835 MW · uprates 1,513 MW · new fission reactors 50 MW · fusion 250 MW
  • In frameworks uprates 96 MW · new fission reactors 11,250 MW

Fossil fuels make 66% of the power behind AI outside the US

Every country’s power mix, beside the AI it hosts
  1. AI outside the US weighted by 3.3 GW drawing power today 66% fossil, 3% nuclear, 31% renewables
  2. Malaysia 1.7 GW tracked AI today · Jun 2025–May 2026 78% fossil, 0% nuclear, 22% renewables
  3. China 1.1 GW tracked AI today · Sep 2025–Aug 2026 58% fossil, 5% nuclear, 37% renewables
  4. United Kingdom 124 MW tracked AI today · Oct 2025–Sep 2026 32% fossil, 12% nuclear, 56% renewables
  5. Indonesia 94 MW tracked AI today · 2025 84% fossil, 0% nuclear, 16% renewables
  6. Finland 90 MW tracked AI today · Oct 2025–Sep 2026 6% fossil, 39% nuclear, 55% renewables
  7. Australia 57 MW tracked AI today · Oct 2025–Sep 2026 54% fossil, 0% nuclear, 46% renewables
  8. Norway 55 MW tracked AI today · Oct 2025–Sep 2026 1% fossil, 0% nuclear, 99% renewables
  9. Portugal 40 MW tracked AI today · Oct 2025–Sep 2026 18% fossil, 0% nuclear, 82% renewables
  10. Iceland 7 MW tracked AI today · Sep 2025–Aug 2026 <1% fossil, 0% nuclear, 100% renewables
  11. United Arab Emirates 1.4 GW AI by 2030, projected · 2025 68% fossil, 21% nuclear, 10% renewables
  12. Sweden 67 MW AI by 2030, projected · Oct 2025–Sep 2026 <1% fossil, 26% nuclear, 74% renewables
  13. World Sep 2025–Aug 2026 56% fossil, 9% nuclear, 35% renewables
  14. United States Oct 2025–Sep 2026 · for comparison 56% fossil, 17% nuclear, 27% renewables

Every state

Download CSV
Open the table · 51 rows, by AI capacity against demand
State Home price 2021 Latest 12 months Change AI capacity Of demand
Nebraska 10.75¢ 12.74¢ +19% 843 MW 18.6%
Tennessee 11.07¢ 13.61¢ +23% 1.8 GW 14.8%
Indiana 13.37¢ 16.90¢ +26% 1.5 GW 12.3%
Mississippi 11.56¢ 14.85¢ +29% 614 MW 10.7%
Ohio 12.77¢ 18.41¢ +44% 1.8 GW 9.4%
Wyoming 11.17¢ 14.01¢ +25% 182 MW 9.1%
Virginia 11.96¢ 16.64¢ +39% 1.4 GW 8.2%
Iowa 12.73¢ 14.20¢ +12% 512 MW 7.4%
Idaho 10.16¢ 12.77¢ +26% 198 MW 6.5%
Oregon 11.37¢ 15.53¢ +37% 428 MW 6.0%
Wisconsin 14.52¢ 18.79¢ +29% 442 MW 5.4%
Arizona 12.54¢ 15.39¢ +23% 577 MW 5.2%
Georgia 12.51¢ 15.17¢ +21% 923 MW 5.2%
Oklahoma 11.00¢ 13.81¢ +26% 442 MW 5.1%
Nevada 11.49¢ 13.45¢ +17% 214 MW 4.5%
Utah 10.43¢ 13.26¢ +27% 179 MW 4.3%
Texas 12.11¢ 15.98¢ +32% 2.4 GW 3.9%
New Mexico 13.52¢ 15.31¢ +13% 147 MW 3.9%
Alabama 12.96¢ 16.44¢ +27% 397 MW 3.9%
Minnesota 13.50¢ 16.28¢ +21% 241 MW 3.2%
North Dakota 10.85¢ 12.35¢ +14% 88 MW 2.5%
New York 19.48¢ 28.60¢ +47% 303 MW 1.9%
South Carolina 12.86¢ 15.77¢ +23% 168 MW 1.7%
Missouri 11.41¢ 13.97¢ +22% 126 MW 1.4%
Pennsylvania 13.76¢ 20.86¢ +52% 139 MW 0.9%
New Jersey 16.35¢ 23.74¢ +45% 70 MW 0.8%
North Carolina 11.32¢ 14.79¢ +31% 91 MW 0.6%
District of Columbia 13.09¢ 24.48¢ +87% — —
Maine 17.02¢ 29.60¢ +74% — —
Maryland 13.12¢ 21.18¢ +61% — —
Delaware 12.52¢ 17.98¢ +44% — —
Illinois 13.18¢ 18.91¢ +44% — —
California 22.82¢ 32.34¢ +42% — —
Washington 10.11¢ 14.20¢ +40% — —
New Hampshire 19.85¢ 26.95¢ +36% — —
Massachusetts 22.89¢ 30.39¢ +33% — —
Hawaii 33.49¢ 44.27¢ +32% — —
Rhode Island 22.30¢ 29.44¢ +32% — —
Florida 11.90¢ 15.41¢ +29% — —
West Virginia 12.15¢ 15.53¢ +28% — —
Colorado 13.07¢ 16.61¢ +27% — —
Connecticut 21.91¢ 27.42¢ +25% — —
Montana 11.22¢ 13.94¢ +24% — —
Vermont 19.26¢ 23.90¢ +24% — —
Michigan 17.54¢ 21.28¢ +21% Planned —
Kentucky 11.50¢ 13.94¢ +21% — —
Arkansas 11.27¢ 13.57¢ +20% — —
Alaska 22.55¢ 26.94¢ +19% — —
Louisiana 11.02¢ 13.02¢ +18% Planned —
South Dakota 12.22¢ 14.28¢ +17% — —
Kansas 12.98¢ 15.13¢ +17% — —
United States 13.66¢ 18.04¢ +32% 16.2 GW 3.4%