xAI
3 AI campuses drawing 1.7 GW and computing with 1.4M H100-equivalents now, 2 frontier models.
- AI campuses1.7 GW drawn now
- AI supercomputers, to Jul 20251 cluster
- Frontier models2 models
Embed
The frame credits Epoch AI and LMArena and links back to its page. Preview it.
Cite
xAI’s AI campuses draw 1.7 GW now, 2.5 GW at planned peak
The Buildout →| Campus | Role | Power now | H100e now | Planned peak | First power |
|---|---|---|---|---|---|
| Colossus 2Memphis, Tennessee, United States | owner and user | 1.3 GW | 1.1M | 2.1 GWFeb 2027 | Oct 2025 |
| Colossus 1Memphis, Tennessee, United States | owner | 425 MW | 276K | 442 MWJul 2025 | Aug 2024 |
| xAI QTS AtlantaAtlanta, Georgia, United States | owner and user | 24 MW | 11K | 24 MWFeb 2025 | Feb 2025 |
Owner and users as Epoch AI names them. The totals above count the campuses xAI owns, not those it uses.
1 AI supercomputer in Epoch AI’s list to Jul 2025, 275,796 H100-equivalents operating then
Every listed supercomputer →| Cluster | Country | H100e | Status | From |
|---|---|---|---|---|
| xAI Colossus Memphis Phase 3 | United States | 275,796 | existing | Jul 2025 |
Epoch AI stopped this list in Jul 2025; the H100-equivalents now at each campus are in the campus table above, and on the Machine’s compute layer.
2 models that led or matched the top of an LMArena board
Frontier →Days in first place, summed across LMArena's boards.