Power · the capacity price on the bill

$329.17 a megawatt-day clears PJM’s capacity auction, up from $28.92

The price is what PJM’s auction pays for capacity, a promise to supply power at the peak. Utilities and suppliers pay it for their customers’ share of the peak, and pass it on in their rates. Each figure cites PJM’s own report; retrieved 16 October 2026.

Embed

The frame credits PJM Interconnection and links back to its page. Preview it.

Cite
CSV Post on X

Three auctions in a row clear at the price cap

$ per megawatt-day · base auction · by delivery year

RTO capacity price a zone priced higher the cap PJM’s simulation without the cap

  1. 2024/25 Jun 2024 – May 2025 · billed $28.92 DPL-SOUTH $426.17
  2. 2025/26 Jun 2025 – May 2026 · billed $269.92 BGE $466.35
  3. 2026/27 Jun 2026 – May 2027 · on bills now $329.17 at the cap $388.57 without it
  4. 2027/28 Jun 2027 – May 2028 · auctioned, not yet billed $333.44 at the cap $529.80 without it
  5. 2028/29 Jun 2028 – May 2029 · auctioned, not yet billed $325.00 at the cap $554.72 without it

“The PJM simulation included existing offers provided by Capacity Market Sellers. PJM does not know how offers may have changed if the temporary cap and floor was not implemented.” PJM, 2028/2029 Base Residual Auction Report, p. 20.

Each kilowatt of peak load costs $9.18 a month, up from $0.96

every PJM zone · $ a month per kW of peak load

Dollars a month for each kilowatt of peak load

What PJM's capacity price costs a month, by zone and delivery year
Zone 2024/25 billed 2025/26 billed 2026/27 now 2027/28 to come 2028/29 to come
All of PJM, at the RTO pricethe price most zones pay $0.96$7.71$9.18$9.42$9.29
AEP AEP · IN KY MI OH TN VA WV · AEP Ohio, Appalachian Power, Indiana Michigan Power, Kentucky Power and others $0.96 $7.71 $9.18 $9.42 $9.29
AES Ohio DAY · OH · formerly Dayton Power and Light $0.96 $7.71 $9.18 $9.42 $9.29
Allegheny Power APS · MD PA WV · Mon Power, Potomac Edison, West Penn Power $0.96 $7.71 $9.18 $9.42 $9.29
Atlantic City Electric AECO · NJ $1.78 $7.71 $9.18 $9.42 $9.29
Baltimore Gas and Electric BGE · MD $2.42 $13.32 $9.18 $9.42 $9.29
ComEd COMED · IL $0.96 $7.71 $9.18 $9.42 $9.29
Delmarva Power, DPL South DPL · DE MD VA $14.12 $7.71 $9.18 $9.42 $9.29
Delmarva Power, rest of zone DPL · DE MD $1.78 $7.71 $9.18 $9.42 $9.29
Dominion Energy DOM · NC VA own supply $12.68 $9.18 $9.42 $9.29
Duke Energy Ohio and Kentucky DEOK · KY OH $3.19 $7.71 $9.18 $9.42 $9.29
Duquesne Light DUQ · PA $0.96 $7.71 $9.18 $9.42 $9.29
East Kentucky Power Cooperative EKPC · KY $0.96 $7.71 $9.18 $9.42 $9.29
FirstEnergy Ohio and Penn Power ATSI · OH PA · Ohio Edison, The Illuminating Company, Toledo Edison, Penn Power $0.96 $7.71 $9.18 $9.42 $9.29
Jersey Central Power & Light JCPL · NJ $1.78 $7.71 $9.18 $9.42 $9.29
Met-Ed METED · PA $1.64 $7.71 $9.18 $9.42 $9.29
PECO PECO · PA $1.78 $7.71 $9.18 $9.42 $9.29
Penelec PENELEC · PA $1.64 $7.71 $9.18 $9.42 $9.29
Pepco PEPCO · DC MD $1.64 $7.71 $9.18 $9.42 $9.29
PPL Electric Utilities PPL · PA $1.64 $7.71 $9.18 $9.42 $9.29
PSE&G PSEG · NJ $1.78 $7.71 $9.18 $9.42 $9.29
Rockland Electric RECO · NJ $1.78 $7.71 $9.18 $9.42 $9.29

Your peak load contribution is your share of your zone’s summer peak, and your utility sets it once a year. Some bills and most supplier contracts print it as a PLC, a capacity obligation or a peak load contribution. PJM priced some zones apart from the rest in 2024/25 and 2025/26, and every zone alike in 2026/27, 2027/28 and 2028/29. Dominion’s zone supplied its own capacity in 2024/25: “Dominion FRR has changed to RPM and therefore the entire Dominion zone is now in RPM.” (2025/2026 Base Residual Auction Report, p. 7).

PJM’s load forecast grows 15,314 MW over four auctions

what each auction bought for, and what it cost
Delivery year Load forecast Short of the requirement Cleared MW × price As a bar
2024/25Jun 2024 – May 2025 — — $2.2 bn
2025/26Jun 2025 – May 2026 +3,243 MW — $14.7 bn
2026/27Jun 2026 – May 2027 +5,446.1 MW — $16.1 bn
2027/28Jun 2027 – May 2028 +5,249.9 MW 6,516.6 MW $16.4 bn
2028/29Jun 2028 – May 2029 +1,374.5 MW 6,831.3 MW $16.4 bn

Cleared megawatts times price: $16.1 bn for 2026/27, from $2.2 bn for 2024/25. “Note that the $16.4 billion value does not equate to a total cost to load because load that is hedged through self-supply or bilateral contracts is not exposed to the clearing prices in the auction.” (PJM, p. 7.) The reports for 2027/28 and 2028/29 give the forecast’s rise as “largely due to additional Large Loads”. The Buildout tracks the largest AI data centers.