Chips · accelerators · NVIDIA
NVIDIA Tesla V100 SXM2 · Volta
417 gigaflops of dense FP16 compute per watt, at 300 W
Shipped 10 Aug 2017; shipped by the first date promised. Epoch AI names it at no AI data center and 46 GPU clusters.
Embed
The frame credits NVIDIA, Epoch AI, AI data centers and Epoch AI, Data on GPU clusters and links back to its page. Preview it.
Cite
Each figure in NVIDIA’s own words
one chip, dense compute; memory is high-bandwidth memory- FP16, dense
- 125 TFLOPS
Tesla V100 delivers 125 teraFLOPS of deep learning performance
NVIDIA Tesla V100 GPU accelerator datasheet (Mar 2018) - Memory
- 32 GB
GPU Memory 32GB /16GB HBM2
NVIDIA Tesla V100 GPU accelerator datasheet (Mar 2018) - Memory bandwidth
- 0.9 TB/s
Memory Bandwidth 900GB/sec
NVIDIA Tesla V100 GPU accelerator datasheet (Mar 2018) (900 GB/s on the page) - Maximum power
- 300 W
PCIe Full Height/Length SXM2 250 W 300 W Max Power Comsumption
NVIDIA Tesla V100 GPU accelerator datasheet (Mar 2018) (read from a table with a column for each product, whose head reads “PCIe Full Height/Length SXM2 250 W 300 W Max Power Comsumption”) - Compute per watt
- 417 GFLOPS/Wdense FP16 over maximum power
V100 has no BF16 or FP8, so fp16 gives the Tensor Core figure (125 TFLOPS for SXM2, from the datasheet text). The datasheet table is a two-column PCIe/SXM2 layout, so the SXM2 power reads as the second value (300 W); it shows only 'Mar18' as its date. The earliest window found is for Volta-based DGX systems, not the bare GPU.
1 dated promise and the shipment
each date links to the page it is quoted from- 10 May 2017 Promised Volta-based DGX-1 and DGX Station orderable now, expected to ship in the third quarter in the third quarter of 2017.
Volta-based DGX Station and DGX-1 servers are available now and expected to ship in the third quarter.
NVIDIA Advances AI Computing Revolution with New Volta-Based DGX Systems - 10 Aug 2017 Shipped: began shipping Tesla V100; shipped Volta in volume to AI customers in the quarter.
This quarter, we shipped Volta in volume to leading AI customers.
NVIDIA Announces Financial Results for Second Quarter Fiscal 2018
Named at no AI data center Epoch AI tracks
H100-equivalents and power are the whole site’s today, with every chip it holds124,932 chips in 46 GPU clusters
Epoch AI’s list of AI supercomputers, which stops in July 2025; the 20 largest shown, all in the CSV of Epoch’s list| Cluster | Owner | Country | Chips | First operational |
|---|---|---|---|---|
| Meta 2017 V100 Cluster | Meta AI | United States of America | 22,000 | 2017-10-01 |
| Lawrence Livermore NL Sierra | US Department of Energy | United States of America | 17,280 | 2018-06-01 |
| Azure OpenAI GPT-3 Cluster | Microsoft,OpenAI | United States of America | 10,000 | 2020-04-15 |
| XTX Markets Cluster | XTX Markets | Not given | 10,000 | 2023-03-27 |
| Saudi Aramco Dammam-7 | Saudi Aramco | Saudi Arabia | 7,912 | 2021-01-21 |
| Eni HPC5 | Eni | Italy | 7,280 | 2020-02-21 |
| NVIDIA SATURN V Phase 2 | Nvidia | United States of America | 5,280 | 2018-03-26 |
| Cineca Marconi-100 | Cineca | Italy | 3,952 | 2020-04-20 |
| TotalEnergies Pangea III | TotalEnergies | France | 3,384 | 2019-06-18 |
| Lawrence Livermore NL Lassen Phase 2 | US Department of Energy | United States of America | 3,168 | 2020-08-19 |
| Eni HPC4 Phase 2 | Eni | Italy | 2,750 | 2021-10-30 |
| Jean Zay Supercomputer Phase 3 | GENCI | France | 2,696 | 2022-06-01 |
| Petrobras Dragão | Petrobras | Brazil | 2,176 | 2021-06-01 |
| AWS Fast BERT Training | Amazon | United States of America | 2,048 | 2019-12-03 |
| Taiwania 2 | National Applied Research Laboratories Taiwan | Taiwan | 2,016 | 2018-11-01 |
| NVIDIA DGX SuperPOD 2019 | Nvidia | Not given | 1,536 | 2019-06-17 |
| RPI AiMOS | Rensselaer Polytechnic Institute | United States of America | 1,512 | 2019-12-11 |
| G42 Artemis | G42 | United Arab Emirates | 1,296 | 2019-11-01 |
| Microsoft Azure Immunity Bio | Microsoft | United States of America | 1,250 | 2020-04-01 |
| SberCloud Christofari | SberCloud | Russia | 1,200 | 2019-11-09 |
Epoch AI’s names for this chip: NVIDIA V100; NVIDIA Tesla V100 SXM2; NVIDIA Tesla V100 DGXS 32 GB.
Other NVIDIA chips
- A100 SXM 80GB 780 gigaflops of dense BF16 compute per watt, at 400 W
- H100 SXM 1,414 gigaflops of dense BF16 compute per watt, at 700 W
- H200 SXM 1,414 gigaflops of dense BF16 compute per watt, at 700 W
- GH200 Grace Hopper Superchip 990 gigaflops of dense BF16 compute per watt, at 1,000 W
- B200 2,200 gigaflops of dense BF16 compute per watt, at 1,000 W
- GB200 Grace Blackwell Superchip 5,000 teraflops of dense BF16 compute a chip; NVIDIA publishes no power figure
- B300 (Blackwell Ultra) 2,000 gigaflops of dense BF16 compute per watt, at 1,100 W
- Rubin GPU 4,000 teraflops of dense BF16 compute a chip; NVIDIA publishes no power figure
- NVIDIA’s own pages, each linked beside the figure or date it gives. Each page was read and each quote checked on 23 Oct 2026.
- Where it runs: Epoch AI, AI data centers and Epoch AI, GPU clusters, CC BY 4.0.