Chips · stack

6 stages take a chip from raw material to the data center

Each stage below takes its rows from its own page, and links to it. Read it from the top: materials, tools, fabs, process nodes, memory, chip and package. Then the data centers that run the chips, and the power they draw.

  1. Materials

    100% of the world’s primary gallium comes from China.

    Materials: rows from /chips/materials/
    MaterialUsed inLargest producerShare
    Galliumcompound semiconductors, the waferChina100%
    Silicon metalthe waferChina87%
    Indiumcompound semiconductors, packagingChina69%
    Fluorsparetch and cleanChina60%
    Arseniccompound semiconductorsPeru49%
    Heliumfab gasesUnited States43%

    The whole materials page

  2. Tools

    29% of a typical chip-tool maker’s sales go to China.

    Tools: rows from /chips/books/
    Tool makerSold to ChinaYear to
    Lam Research32%2026-06
    KLA30%2026-06
    ASML29%2025-12
    Applied Materials28%2026-07

    The whole tools page

  3. Fabs

    $26.4 billion in CHIPS Act awards goes to 17 US chip plants.

    Fabs: rows from /chips/fabs/
    StatusPlantsFor example
    ramping or in production7Intel Fab 52, Intel Fab 34, SK hynix M15X
    under construction7Samsung Taylor 1, Samsung Pyeongtaek P4, Samsung Pyeongtaek P5
    announced4Samsung Taylor 2, SK hynix Yongin Y2, SK hynix M17
    paused or delayed1Intel Ohio One
    cancelled1Intel Magdeburg

    The whole fabs page

  4. Process nodes

    15 of 19 process nodes shipped by the date first promised.

    Process nodes: rows from /chips/nodes/
    CompanyNodesKeptLate
    Samsung1270
    SK hynix641
    TSMC330
    Intel502
    Micron411

    The whole process nodes page

  5. Memory

    Micron’s revenue grows to 4.8× its level of a year ago.

    Memory: rows from /chips/memory/
    Memory nodeStatus
    Micron 1β (1-beta)up to 12 months late
    Micron 1γ (1-gamma)by the first date promised
    SK hynix 1bnmno dated delivery yet
    SK hynix 1cnmup to 10 months late
    Samsung 1b DRAMby the first date promised
    Samsung 1cdelivered
    SK hynix HBM3Eby the first date promised
    SK hynix HBM4by the first date promised
    Samsung HBM3Eby the first date promised
    Samsung HBM4by the first date promised
    Micron HBM3Eno dated delivery yet
    Micron HBM4no dated delivery yet

    The whole memory page

  6. Chip and package

    64 of the largest possible dies fit on a 300 mm wafer.

    Chip and package: rows from /chips/cost/
    DesignerAI chips in Epoch AI’s data
    AmazonTrainium1, Trainium2
    AMDMI300A, MI300X, MI308X, MI325X, MI350X, MI355X
    GoogleTPU v5e, TPU v5p, TPU v6e, TPU v7
    NVIDIAB200, B300, H100/H200, H20

    The whole chip and package page

After the package: the data center and its power

Terms used on this page: industrial price , reticle limit , defect density , chiplet , interposer , high-bandwidth memory , herfindahl index , net import reliance , capital intensity , inventory days , Entity List , foreign direct product rule , gross margin , diffusion index , unit value , average selling price and bit shipments .

Through every stage: the cycle and the controls

  • The chip cycle8 of 8 chip-cycle indicators improve on three months earlier.
  • Export controls1,110 Chinese entries sit on the US Entity List, 6.6 times 2017’s.