Chips · accelerators · Intel
Intel Gaudi 3 · Gaudi
1,864 gigaflops of dense BF16 compute per watt, at 900 W
Shipped the third quarter of 2024; shipped after the first date promised, up to 3 months. Epoch AI names it at no AI data center and no GPU cluster. Intel across the site.
Embed
The frame credits Intel and Epoch AI, AI data centers and links back to its page. Preview it.
Cite
Each figure in Intel’s own words
one chip, dense compute; memory is high-bandwidth memory- BF16, dense
- 1,678 TFLOPS
BF16 MME TFLOPS 432 1678
Intel Gaudi 3 AI Accelerator technical paper (July 2025, V1 Rev. 3) (read from a table with a column for each product, whose head reads “Feature/Product Intel® Gaudi® 2 AI Accelerator Intel® Gaudi® 3 AI Accelerator”) - FP8, dense
- 1,678 TFLOPS
FP8 MME TFLOPS 865 1678
Intel Gaudi 3 AI Accelerator technical paper (July 2025, V1 Rev. 3) (read from a table with a column for each product, whose head reads “Feature/Product Intel® Gaudi® 2 AI Accelerator Intel® Gaudi® 3 AI Accelerator”) - Memory
- 128 GB
128 GB of HBM2e memory capacity, and 3.7 TB/s of HBM bandwidth
Intel Gaudi 3 AI Accelerator technical paper (July 2025, V1 Rev. 3) - Memory bandwidth
- 3.7 TB/s
128 GB of HBM2e memory capacity, and 3.7 TB/s of HBM bandwidth
Intel Gaudi 3 AI Accelerator technical paper (July 2025, V1 Rev. 3) - Maximum power
- 900 W
supports up to 900W Total Device Power (TDP) with passive cooling
Intel Gaudi 3 AI Accelerator technical paper (July 2025, V1 Rev. 3) - Compute per watt
- 1,864 GFLOPS/Wdense BF16 over maximum power; 1,864 GFLOPS/W at FP8
Figures are for the HL-325L OAM card (the PCIe card is 600W). Intel's April 2024 promise of OEM availability in Q2 2024 is on intc.com and intel.com; intel.com answers 403 and intc.com is not on the record's Intel host list, so it is left out.
2 dated promises and the shipment
each date links to the page it is quoted from- 9 Apr 2024 Promised availability to server makers in the second quarter of 2024.
Intel Gaudi 3 will be available to OEMs - including Dell Technologies, Hewlett Packard Enterprise, Lenovo and Supermicro - in the second quarter of 2024
Intel unleashes enterprise AI with Gaudi 3, AI open systems strategy and new customer wins - 1 Aug 2024 Promised launch in the third quarter of 2024.
The Intel® Gaudi® 3 AI accelerator is also on track to launch in the third quarter
Intel second quarter 2024 financial results, 8-K exhibit 99.1 - the third quarter of 2024 Shipped: launched in Q3 2024 (Intel's word).
Intel also launched its Intel® Gaudi® 3 AI accelerators
Intel third quarter 2024 financial results, 8-K exhibit 99.1
Named at no AI data center Epoch AI tracks
H100-equivalents and power are the whole site’s today, with every chip it holdsIn no GPU cluster of Epoch AI’s list
Epoch AI’s list of AI supercomputers, which stops in July 2025Other Intel chips
- Gaudi 2 720 gigaflops of dense BF16 compute per watt, at 600 W
- Intel’s own pages, each linked beside the figure or date it gives. Each page was read and each quote checked on 23 Oct 2026.
- Where it runs: Epoch AI, AI data centers and Epoch AI, GPU clusters, CC BY 4.0.