How much new load wants to join the Texas grid?
467.4 GW
Large loads that ask to join ERCOT’s grid by 2033 add up to 467.4 GW, in ERCOT’s queue table for July 2026. These are requests to connect, not plants under construction.
For July 2026. Data checked 3 Nov 2026, from queue.csv.