Power · large loads waiting for the grid
467.4 GW of large loads ask to join ERCOT’s grid by 2033
Requests to connect to ERCOT’s grid, not plants being built. ERCOT’s own figures, from its monthly operational overview.
Power · large loads waiting for the grid
Requests to connect to ERCOT’s grid, not plants being built. ERCOT’s own figures, from its monthly operational overview.