Meta · Holly Ridge, Louisiana
Meta Hyperion
2.2GW projected
The power of 1.8 million US homes, once built.
Under construction. Projected to draw 2.2 GW by Jan 2028.
Meta · Holly Ridge, Louisiana
2.2GW projected
The power of 1.8 million US homes, once built.
Under construction. Projected to draw 2.2 GW by Jan 2028.