{"api":"v1","id":"power.queue","title":"ERCOT large-load queue: MW by ERCOT’s status words and by year, from each monthly operational overview","section":"power","row":"status and year in one monthly overview","page":"https://jesseahawkins.com/power/queue/","fields":[{"name":"month","type":"string","tier":null},{"name":"status","type":"string","tier":null},{"name":"year","type":"number","tier":"quoted"},{"name":"printed","type":"number","tier":"quoted"},{"name":"unit","type":"string","tier":null},{"name":"mw","type":"number","tier":"quoted"},{"name":"overview","type":"string","tier":null},{"name":"url","type":"string","tier":null},{"name":"page","type":"number","tier":null},{"name":"pdf_sha256","type":"string","tier":null},{"name":"table_image_sha256","type":"string","tier":null},{"name":"publisher","type":"string","tier":null},{"name":"license","type":"string","tier":null}],"tiers":["quoted"],"provenance":"Each cell is copied from the queue table of ERCOT’s monthly operational overview, as ERCOT printed it; mw changes only the unit.","freshness":{"state":"current","asOf":"2026-11-12","oldestCheck":"2026-11-03","next":"2026-12-04","late":"2026-12-11","status":"https://jesseahawkins.com/status/","sources":["queue"],"notice":null},"rowCount":957,"terms":["ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"],"checked":"2026-11-03","nextCheckBy":"2026-12-18","links":{"rows":"https://jesseahawkins.com/data/v1/datasets/power.queue.json","csv":"https://jesseahawkins.com/power/queue.csv","releases":"https://jesseahawkins.com/data/v1/datasets/power.queue/releases.json"},"latestRelease":{"id":"2026-11-03","date":"2026-11-03","sha256":"5ec08ae3b5a37a3ef0b4d6dcf52f928f166eeba128923249c04395e7d24ff409","json":"https://jesseahawkins.com/data/v1/datasets/power.queue/releases/2026-11-03.json","csv":"https://jesseahawkins.com/data/releases/power/queue/2026-11-03.csv"},"csvSha256":"5ec08ae3b5a37a3ef0b4d6dcf52f928f166eeba128923249c04395e7d24ff409","matchesLatestRelease":true,"rows":[{"month":"2025-04","status":"Total","year":2022,"printed":2634,"unit":"MW","mw":2634,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Total","year":2023,"printed":4680,"unit":"MW","mw":4680,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Total","year":2024,"printed":5239,"unit":"MW","mw":5239,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Total","year":2025,"printed":16835,"unit":"MW","mw":16835,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Total","year":2026,"printed":34090,"unit":"MW","mw":34090,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Total","year":2027,"printed":72344,"unit":"MW","mw":72344,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Total","year":2028,"printed":108459,"unit":"MW","mw":108459,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Total","year":2029,"printed":125332,"unit":"MW","mw":125332,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Total","year":2030,"printed":136625,"unit":"MW","mw":136625,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"No Studies Submitted","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"No Studies Submitted","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"No Studies Submitted","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"No Studies Submitted","year":2025,"printed":2278,"unit":"MW","mw":2278,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"No Studies Submitted","year":2026,"printed":5046,"unit":"MW","mw":5046,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"No Studies Submitted","year":2027,"printed":21860,"unit":"MW","mw":21860,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"No Studies Submitted","year":2028,"printed":45543,"unit":"MW","mw":45543,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"No Studies Submitted","year":2029,"printed":57773,"unit":"MW","mw":57773,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"No Studies Submitted","year":2030,"printed":66032,"unit":"MW","mw":66032,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Under ERCOT Review","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Under ERCOT Review","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Under ERCOT Review","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Under ERCOT Review","year":2025,"printed":6864,"unit":"MW","mw":6864,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Under ERCOT Review","year":2026,"printed":17484,"unit":"MW","mw":17484,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Under ERCOT Review","year":2027,"printed":35599,"unit":"MW","mw":35599,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Under ERCOT Review","year":2028,"printed":45438,"unit":"MW","mw":45438,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Under ERCOT Review","year":2029,"printed":48331,"unit":"MW","mw":48331,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Under ERCOT Review","year":2030,"printed":50846,"unit":"MW","mw":50846,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Planning Studies Approved","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Planning Studies Approved","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Planning Studies Approved","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Planning Studies Approved","year":2025,"printed":1304,"unit":"MW","mw":1304,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Planning Studies Approved","year":2026,"printed":5081,"unit":"MW","mw":5081,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Planning Studies Approved","year":2027,"printed":8406,"unit":"MW","mw":8406,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Planning Studies Approved","year":2028,"printed":10999,"unit":"MW","mw":10999,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Planning Studies Approved","year":2029,"printed":12449,"unit":"MW","mw":12449,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Planning Studies Approved","year":2030,"printed":12968,"unit":"MW","mw":12968,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Approved to Energize but Not Operational","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Approved to Energize but Not Operational","year":2023,"printed":569,"unit":"MW","mw":569,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Approved to Energize but Not Operational","year":2024,"printed":623,"unit":"MW","mw":623,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Approved to Energize but Not Operational","year":2025,"printed":1773,"unit":"MW","mw":1773,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Approved to Energize but Not Operational","year":2026,"printed":1863,"unit":"MW","mw":1863,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Approved to Energize but Not Operational","year":2027,"printed":1863,"unit":"MW","mw":1863,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Approved to Energize but Not Operational","year":2028,"printed":1863,"unit":"MW","mw":1863,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Approved to Energize but Not Operational","year":2029,"printed":2163,"unit":"MW","mw":2163,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Approved to Energize but Not Operational","year":2030,"printed":2163,"unit":"MW","mw":2163,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Observed Energized","year":2022,"printed":2634,"unit":"MW","mw":2634,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Observed Energized","year":2023,"printed":4111,"unit":"MW","mw":4111,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Observed Energized","year":2024,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Observed Energized","year":2025,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Observed Energized","year":2026,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Observed Energized","year":2027,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Observed Energized","year":2028,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Observed Energized","year":2029,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-04","status":"Observed Energized","year":2030,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (April 2025)","url":"https://www.ercot.com/files/docs/2025/05/15/ERCOT-Monthly-Operational-Overview-April-2025.pdf","page":9,"pdf_sha256":"d29641b7dadad04a55acb38a52509dda06f378c19369adb13e71352763a081bc","table_image_sha256":"95fa502a37e30d0a050790918a97fd88de0f79825bb43c30533f3653bf34057f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-05","status":"Total","year":2022,"printed":2634,"unit":"MW","mw":2634,"overview":"ERCOT Monthly Operational Overview (May 2025)","url":"https://www.ercot.com/files/docs/2025/06/17/ERCOT-Monthly-Operational-Overview-May-2025.pdf","page":9,"pdf_sha256":"c3ef478e77e0c1f3e8cd42ae36b1433b826a2ad93a1f8459df26458b20d7f3f9","table_image_sha256":"1759a9cc65f3b19f5c09f8115d27b0247a1d460550a17719b56ac99f27058cd5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-05","status":"Total","year":2023,"printed":4680,"unit":"MW","mw":4680,"overview":"ERCOT Monthly Operational Overview (May 2025)","url":"https://www.ercot.com/files/docs/2025/06/17/ERCOT-Monthly-Operational-Overview-May-2025.pdf","page":9,"pdf_sha256":"c3ef478e77e0c1f3e8cd42ae36b1433b826a2ad93a1f8459df26458b20d7f3f9","table_image_sha256":"1759a9cc65f3b19f5c09f8115d27b0247a1d460550a17719b56ac99f27058cd5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-05","status":"Total","year":2024,"printed":5239,"unit":"MW","mw":5239,"overview":"ERCOT Monthly Operational Overview (May 2025)","url":"https://www.ercot.com/files/docs/2025/06/17/ERCOT-Monthly-Operational-Overview-May-2025.pdf","page":9,"pdf_sha256":"c3ef478e77e0c1f3e8cd42ae36b1433b826a2ad93a1f8459df26458b20d7f3f9","table_image_sha256":"1759a9cc65f3b19f5c09f8115d27b0247a1d460550a17719b56ac99f27058cd5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-05","status":"Total","year":2025,"printed":18188,"unit":"MW","mw":18188,"overview":"ERCOT Monthly Operational Overview (May 2025)","url":"https://www.ercot.com/files/docs/2025/06/17/ERCOT-Monthly-Operational-Overview-May-2025.pdf","page":9,"pdf_sha256":"c3ef478e77e0c1f3e8cd42ae36b1433b826a2ad93a1f8459df26458b20d7f3f9","table_image_sha256":"1759a9cc65f3b19f5c09f8115d27b0247a1d460550a17719b56ac99f27058cd5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-05","status":"Total","year":2026,"printed":37176,"unit":"MW","mw":37176,"overview":"ERCOT Monthly Operational Overview (May 2025)","url":"https://www.ercot.com/files/docs/2025/06/17/ERCOT-Monthly-Operational-Overview-May-2025.pdf","page":9,"pdf_sha256":"c3ef478e77e0c1f3e8cd42ae36b1433b826a2ad93a1f8459df26458b20d7f3f9","table_image_sha256":"1759a9cc65f3b19f5c09f8115d27b0247a1d460550a17719b56ac99f27058cd5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-05","status":"Total","year":2027,"printed":83437,"unit":"MW","mw":83437,"overview":"ERCOT Monthly Operational Overview (May 2025)","url":"https://www.ercot.com/files/docs/2025/06/17/ERCOT-Monthly-Operational-Overview-May-2025.pdf","page":9,"pdf_sha256":"c3ef478e77e0c1f3e8cd42ae36b1433b826a2ad93a1f8459df26458b20d7f3f9","table_image_sha256":"1759a9cc65f3b19f5c09f8115d27b0247a1d460550a17719b56ac99f27058cd5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-05","status":"Total","year":2028,"printed":125786,"unit":"MW","mw":125786,"overview":"ERCOT Monthly Operational Overview (May 2025)","url":"https://www.ercot.com/files/docs/2025/06/17/ERCOT-Monthly-Operational-Overview-May-2025.pdf","page":9,"pdf_sha256":"c3ef478e77e0c1f3e8cd42ae36b1433b826a2ad93a1f8459df26458b20d7f3f9","table_image_sha256":"1759a9cc65f3b19f5c09f8115d27b0247a1d460550a17719b56ac99f27058cd5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-05","status":"Total","year":2029,"printed":144269,"unit":"MW","mw":144269,"overview":"ERCOT Monthly Operational Overview (May 2025)","url":"https://www.ercot.com/files/docs/2025/06/17/ERCOT-Monthly-Operational-Overview-May-2025.pdf","page":9,"pdf_sha256":"c3ef478e77e0c1f3e8cd42ae36b1433b826a2ad93a1f8459df26458b20d7f3f9","table_image_sha256":"1759a9cc65f3b19f5c09f8115d27b0247a1d460550a17719b56ac99f27058cd5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-05","status":"Total","year":2030,"printed":156062,"unit":"MW","mw":156062,"overview":"ERCOT Monthly Operational Overview (May 2025)","url":"https://www.ercot.com/files/docs/2025/06/17/ERCOT-Monthly-Operational-Overview-May-2025.pdf","page":9,"pdf_sha256":"c3ef478e77e0c1f3e8cd42ae36b1433b826a2ad93a1f8459df26458b20d7f3f9","table_image_sha256":"1759a9cc65f3b19f5c09f8115d27b0247a1d460550a17719b56ac99f27058cd5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Total","year":2022,"printed":2634,"unit":"MW","mw":2634,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Total","year":2023,"printed":4680,"unit":"MW","mw":4680,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Total","year":2024,"printed":5239,"unit":"MW","mw":5239,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Total","year":2025,"printed":17241,"unit":"MW","mw":17241,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Total","year":2026,"printed":37623,"unit":"MW","mw":37623,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Total","year":2027,"printed":86764,"unit":"MW","mw":86764,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Total","year":2028,"printed":134487,"unit":"MW","mw":134487,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Total","year":2029,"printed":157354,"unit":"MW","mw":157354,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Total","year":2030,"printed":172828,"unit":"MW","mw":172828,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"No Studies Submitted","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"No Studies Submitted","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"No Studies Submitted","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"No Studies Submitted","year":2025,"printed":3047,"unit":"MW","mw":3047,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"No Studies Submitted","year":2026,"printed":8794,"unit":"MW","mw":8794,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"No Studies Submitted","year":2027,"printed":32425,"unit":"MW","mw":32425,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"No Studies Submitted","year":2028,"printed":63430,"unit":"MW","mw":63430,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"No Studies Submitted","year":2029,"printed":80680,"unit":"MW","mw":80680,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"No Studies Submitted","year":2030,"printed":92081,"unit":"MW","mw":92081,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Under ERCOT Review","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Under ERCOT Review","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Under ERCOT Review","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Under ERCOT Review","year":2025,"printed":7027,"unit":"MW","mw":7027,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Under ERCOT Review","year":2026,"printed":17649,"unit":"MW","mw":17649,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Under ERCOT Review","year":2027,"printed":39712,"unit":"MW","mw":39712,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Under ERCOT Review","year":2028,"printed":53524,"unit":"MW","mw":53524,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Under ERCOT Review","year":2029,"printed":57391,"unit":"MW","mw":57391,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Under ERCOT Review","year":2030,"printed":60824,"unit":"MW","mw":60824,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Planning Studies Approved","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Planning Studies Approved","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Planning Studies Approved","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Planning Studies Approved","year":2025,"printed":623,"unit":"MW","mw":623,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Planning Studies Approved","year":2026,"printed":4484,"unit":"MW","mw":4484,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Planning Studies Approved","year":2027,"printed":7931,"unit":"MW","mw":7931,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Planning Studies Approved","year":2028,"printed":10837,"unit":"MW","mw":10837,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Planning Studies Approved","year":2029,"printed":12287,"unit":"MW","mw":12287,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Planning Studies Approved","year":2030,"printed":12927,"unit":"MW","mw":12927,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Approved to Energize but Not Operational","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Approved to Energize but Not Operational","year":2023,"printed":569,"unit":"MW","mw":569,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Approved to Energize but Not Operational","year":2024,"printed":623,"unit":"MW","mw":623,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Approved to Energize but Not Operational","year":2025,"printed":1928,"unit":"MW","mw":1928,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Approved to Energize but Not Operational","year":2026,"printed":2080,"unit":"MW","mw":2080,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Approved to Energize but Not Operational","year":2027,"printed":2080,"unit":"MW","mw":2080,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Approved to Energize but Not Operational","year":2028,"printed":2080,"unit":"MW","mw":2080,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Approved to Energize but Not Operational","year":2029,"printed":2380,"unit":"MW","mw":2380,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Approved to Energize but Not Operational","year":2030,"printed":2380,"unit":"MW","mw":2380,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Observed Energized","year":2022,"printed":2634,"unit":"MW","mw":2634,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Observed Energized","year":2023,"printed":4111,"unit":"MW","mw":4111,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Observed Energized","year":2024,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Observed Energized","year":2025,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Observed Energized","year":2026,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Observed Energized","year":2027,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Observed Energized","year":2028,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Observed Energized","year":2029,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-06","status":"Observed Energized","year":2030,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (June 2025)","url":"https://www.ercot.com/files/docs/2025/07/17/ERCOT-Monthly-Operational-Overview-June-2025.pdf","page":9,"pdf_sha256":"f7680e941d32f2887bf9177c368bca0e6d3dfedd1f726c5f743c601823cfd3f6","table_image_sha256":"bc3f93c97ca2244d9c81b5d4c4a362bf0873acb02f6246ea27ef93dae5a866e1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Total","year":2022,"printed":2634,"unit":"MW","mw":2634,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Total","year":2023,"printed":4680,"unit":"MW","mw":4680,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Total","year":2024,"printed":5239,"unit":"MW","mw":5239,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Total","year":2025,"printed":17191,"unit":"MW","mw":17191,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Total","year":2026,"printed":36669,"unit":"MW","mw":36669,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Total","year":2027,"printed":88734,"unit":"MW","mw":88734,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Total","year":2028,"printed":139975,"unit":"MW","mw":139975,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Total","year":2029,"printed":171811,"unit":"MW","mw":171811,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Total","year":2030,"printed":188233,"unit":"MW","mw":188233,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"No Studies Submitted","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"No Studies Submitted","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"No Studies Submitted","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"No Studies Submitted","year":2025,"printed":3047,"unit":"MW","mw":3047,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"No Studies Submitted","year":2026,"printed":7640,"unit":"MW","mw":7640,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"No Studies Submitted","year":2027,"printed":33862,"unit":"MW","mw":33862,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"No Studies Submitted","year":2028,"printed":68038,"unit":"MW","mw":68038,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"No Studies Submitted","year":2029,"printed":94288,"unit":"MW","mw":94288,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"No Studies Submitted","year":2030,"printed":106247,"unit":"MW","mw":106247,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Under ERCOT Review","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Under ERCOT Review","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Under ERCOT Review","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Under ERCOT Review","year":2025,"printed":6772,"unit":"MW","mw":6772,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Under ERCOT Review","year":2026,"printed":17644,"unit":"MW","mw":17644,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Under ERCOT Review","year":2027,"printed":39740,"unit":"MW","mw":39740,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Under ERCOT Review","year":2028,"printed":53199,"unit":"MW","mw":53199,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Under ERCOT Review","year":2029,"printed":57035,"unit":"MW","mw":57035,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Under ERCOT Review","year":2030,"printed":60858,"unit":"MW","mw":60858,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Planning Studies Approved","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Planning Studies Approved","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Planning Studies Approved","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Planning Studies Approved","year":2025,"printed":674,"unit":"MW","mw":674,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Planning Studies Approved","year":2026,"printed":4535,"unit":"MW","mw":4535,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Planning Studies Approved","year":2027,"printed":8282,"unit":"MW","mw":8282,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Planning Studies Approved","year":2028,"printed":11888,"unit":"MW","mw":11888,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Planning Studies Approved","year":2029,"printed":13338,"unit":"MW","mw":13338,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Planning Studies Approved","year":2030,"printed":13978,"unit":"MW","mw":13978,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Approved to Energize but Not Operational","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Approved to Energize but Not Operational","year":2023,"printed":569,"unit":"MW","mw":569,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Approved to Energize but Not Operational","year":2024,"printed":623,"unit":"MW","mw":623,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Approved to Energize but Not Operational","year":2025,"printed":2082,"unit":"MW","mw":2082,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Approved to Energize but Not Operational","year":2026,"printed":2234,"unit":"MW","mw":2234,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Approved to Energize but Not Operational","year":2027,"printed":2234,"unit":"MW","mw":2234,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Approved to Energize but Not Operational","year":2028,"printed":2234,"unit":"MW","mw":2234,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Approved to Energize but Not Operational","year":2029,"printed":2534,"unit":"MW","mw":2534,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Approved to Energize but Not Operational","year":2030,"printed":2534,"unit":"MW","mw":2534,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Observed Energized","year":2022,"printed":2634,"unit":"MW","mw":2634,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Observed Energized","year":2023,"printed":4111,"unit":"MW","mw":4111,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Observed Energized","year":2024,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Observed Energized","year":2025,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Observed Energized","year":2026,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Observed Energized","year":2027,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Observed Energized","year":2028,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Observed Energized","year":2029,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-07","status":"Observed Energized","year":2030,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (July 2025)","url":"https://www.ercot.com/files/docs/2025/08/15/ERCOT-Monthly-Operational-Overview-July-2025.pdf","page":9,"pdf_sha256":"adbc607ea9c015db048ce491f790989cb26f2b3d9bd820aad8cd56d2cde9c1c0","table_image_sha256":"65492f3e941b3c75b5edb1d72954373ab1a7a0d1f477f191101f92b17cd51e10","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Total","year":2022,"printed":2634,"unit":"MW","mw":2634,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Total","year":2023,"printed":4194,"unit":"MW","mw":4194,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Total","year":2024,"printed":4753,"unit":"MW","mw":4753,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Total","year":2025,"printed":15209,"unit":"MW","mw":15209,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Total","year":2026,"printed":33856,"unit":"MW","mw":33856,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Total","year":2027,"printed":85635,"unit":"MW","mw":85635,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Total","year":2028,"printed":137001,"unit":"MW","mw":137001,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Total","year":2029,"printed":170234,"unit":"MW","mw":170234,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Total","year":2030,"printed":189328,"unit":"MW","mw":189328,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"No Studies Submitted","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"No Studies Submitted","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"No Studies Submitted","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"No Studies Submitted","year":2025,"printed":2072,"unit":"MW","mw":2072,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"No Studies Submitted","year":2026,"printed":7208,"unit":"MW","mw":7208,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"No Studies Submitted","year":2027,"printed":35054,"unit":"MW","mw":35054,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"No Studies Submitted","year":2028,"printed":67332,"unit":"MW","mw":67332,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"No Studies Submitted","year":2029,"printed":93400,"unit":"MW","mw":93400,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"No Studies Submitted","year":2030,"printed":106267,"unit":"MW","mw":106267,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Under ERCOT Review","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Under ERCOT Review","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Under ERCOT Review","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Under ERCOT Review","year":2025,"printed":5192,"unit":"MW","mw":5192,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Under ERCOT Review","year":2026,"printed":15062,"unit":"MW","mw":15062,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Under ERCOT Review","year":2027,"printed":35198,"unit":"MW","mw":35198,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Under ERCOT Review","year":2028,"printed":50966,"unit":"MW","mw":50966,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Under ERCOT Review","year":2029,"printed":56981,"unit":"MW","mw":56981,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Under ERCOT Review","year":2030,"printed":62388,"unit":"MW","mw":62388,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Planning Studies Approved","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Planning Studies Approved","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Planning Studies Approved","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Planning Studies Approved","year":2025,"printed":443,"unit":"MW","mw":443,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Planning Studies Approved","year":2026,"printed":4084,"unit":"MW","mw":4084,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Planning Studies Approved","year":2027,"printed":7881,"unit":"MW","mw":7881,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Planning Studies Approved","year":2028,"printed":11201,"unit":"MW","mw":11201,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Planning Studies Approved","year":2029,"printed":12351,"unit":"MW","mw":12351,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Planning Studies Approved","year":2030,"printed":13171,"unit":"MW","mw":13171,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Approved to Energize but Not Operational","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Approved to Energize but Not Operational","year":2023,"printed":83,"unit":"MW","mw":83,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Approved to Energize but Not Operational","year":2024,"printed":137,"unit":"MW","mw":137,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Approved to Energize but Not Operational","year":2025,"printed":2886,"unit":"MW","mw":2886,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Approved to Energize but Not Operational","year":2026,"printed":2886,"unit":"MW","mw":2886,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Approved to Energize but Not Operational","year":2027,"printed":2886,"unit":"MW","mw":2886,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Approved to Energize but Not Operational","year":2028,"printed":2886,"unit":"MW","mw":2886,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Approved to Energize but Not Operational","year":2029,"printed":2886,"unit":"MW","mw":2886,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Approved to Energize but Not Operational","year":2030,"printed":2886,"unit":"MW","mw":2886,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Observed Energized","year":2022,"printed":2634,"unit":"MW","mw":2634,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Observed Energized","year":2023,"printed":4111,"unit":"MW","mw":4111,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Observed Energized","year":2024,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Observed Energized","year":2025,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Observed Energized","year":2026,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Observed Energized","year":2027,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Observed Energized","year":2028,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Observed Energized","year":2029,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-08","status":"Observed Energized","year":2030,"printed":4616,"unit":"MW","mw":4616,"overview":"ERCOT Monthly Operational Overview (August 2025)","url":"https://www.ercot.com/files/docs/2025/09/22/ERCOT-Monthly-Operational-Overview-August-2025.pdf","page":9,"pdf_sha256":"3d87fe15e600b226335f1d03765023d9d7b023f85fc0fcdf68c3b53b98d568ed","table_image_sha256":"4c7a4a6b34c81c1b63087e6834a8b5b53e4ec5fc14c2b6284fc9e4a603e0c5d5","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Total","year":2022,"printed":2634,"unit":"MW","mw":2634,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Total","year":2023,"printed":4406,"unit":"MW","mw":4406,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Total","year":2024,"printed":4965,"unit":"MW","mw":4965,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Total","year":2025,"printed":13700,"unit":"MW","mw":13700,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Total","year":2026,"printed":32339,"unit":"MW","mw":32339,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Total","year":2027,"printed":84609,"unit":"MW","mw":84609,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Total","year":2028,"printed":142223,"unit":"MW","mw":142223,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Total","year":2029,"printed":179973,"unit":"MW","mw":179973,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Total","year":2030,"printed":205400,"unit":"MW","mw":205400,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"No Studies Submitted","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"No Studies Submitted","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"No Studies Submitted","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"No Studies Submitted","year":2025,"printed":1714,"unit":"MW","mw":1714,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"No Studies Submitted","year":2026,"printed":6995,"unit":"MW","mw":6995,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"No Studies Submitted","year":2027,"printed":30886,"unit":"MW","mw":30886,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"No Studies Submitted","year":2028,"printed":67232,"unit":"MW","mw":67232,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"No Studies Submitted","year":2029,"printed":96116,"unit":"MW","mw":96116,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"No Studies Submitted","year":2030,"printed":114246,"unit":"MW","mw":114246,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Under ERCOT Review","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Under ERCOT Review","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Under ERCOT Review","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Under ERCOT Review","year":2025,"printed":4720,"unit":"MW","mw":4720,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Under ERCOT Review","year":2026,"printed":13875,"unit":"MW","mw":13875,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Under ERCOT Review","year":2027,"printed":38461,"unit":"MW","mw":38461,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Under ERCOT Review","year":2028,"printed":56379,"unit":"MW","mw":56379,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Under ERCOT Review","year":2029,"printed":63767,"unit":"MW","mw":63767,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Under ERCOT Review","year":2030,"printed":70162,"unit":"MW","mw":70162,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Planning Studies Approved","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Planning Studies Approved","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Planning Studies Approved","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Planning Studies Approved","year":2025,"printed":637,"unit":"MW","mw":637,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Planning Studies Approved","year":2026,"printed":4268,"unit":"MW","mw":4268,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Planning Studies Approved","year":2027,"printed":8061,"unit":"MW","mw":8061,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Planning Studies Approved","year":2028,"printed":11411,"unit":"MW","mw":11411,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Planning Studies Approved","year":2029,"printed":12589,"unit":"MW","mw":12589,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Planning Studies Approved","year":2030,"printed":13491,"unit":"MW","mw":13491,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Approved to Energize but Not Operational","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Approved to Energize but Not Operational","year":2023,"printed":100,"unit":"MW","mw":100,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Approved to Energize but Not Operational","year":2024,"printed":154,"unit":"MW","mw":154,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Approved to Energize but Not Operational","year":2025,"printed":1395,"unit":"MW","mw":1395,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Approved to Energize but Not Operational","year":2026,"printed":1967,"unit":"MW","mw":1967,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Approved to Energize but Not Operational","year":2027,"printed":1967,"unit":"MW","mw":1967,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Approved to Energize but Not Operational","year":2028,"printed":1967,"unit":"MW","mw":1967,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Approved to Energize but Not Operational","year":2029,"printed":2267,"unit":"MW","mw":2267,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Approved to Energize but Not Operational","year":2030,"printed":2267,"unit":"MW","mw":2267,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Observed Energized","year":2022,"printed":2634,"unit":"MW","mw":2634,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Observed Energized","year":2023,"printed":4306,"unit":"MW","mw":4306,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Observed Energized","year":2024,"printed":4811,"unit":"MW","mw":4811,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Observed Energized","year":2025,"printed":5234,"unit":"MW","mw":5234,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Observed Energized","year":2026,"printed":5234,"unit":"MW","mw":5234,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Observed Energized","year":2027,"printed":5234,"unit":"MW","mw":5234,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Observed Energized","year":2028,"printed":5234,"unit":"MW","mw":5234,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Observed Energized","year":2029,"printed":5234,"unit":"MW","mw":5234,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-09","status":"Observed Energized","year":2030,"printed":5234,"unit":"MW","mw":5234,"overview":"ERCOT Monthly Operational Overview (September 2025)","url":"https://www.ercot.com/files/docs/2025/10/17/ERCOT-Monthly-Operational-Overview-September-2025.pdf","page":9,"pdf_sha256":"93ae806bac9e4edd435006283124037243e936d41ec843ace9524e6f9b0a4daf","table_image_sha256":"fe87560ec2efef402eb8528602a7f13f7015ab8d8d395129f4707016ce0befe1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Total","year":2022,"printed":2634,"unit":"MW","mw":2634,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Total","year":2023,"printed":4406,"unit":"MW","mw":4406,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Total","year":2024,"printed":4965,"unit":"MW","mw":4965,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Total","year":2025,"printed":13400,"unit":"MW","mw":13400,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Total","year":2026,"printed":33139,"unit":"MW","mw":33139,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Total","year":2027,"printed":84445,"unit":"MW","mw":84445,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Total","year":2028,"printed":147136,"unit":"MW","mw":147136,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Total","year":2029,"printed":189416,"unit":"MW","mw":189416,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Total","year":2030,"printed":223486,"unit":"MW","mw":223486,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"No Studies Submitted","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"No Studies Submitted","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"No Studies Submitted","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"No Studies Submitted","year":2025,"printed":1414,"unit":"MW","mw":1414,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"No Studies Submitted","year":2026,"printed":6885,"unit":"MW","mw":6885,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"No Studies Submitted","year":2027,"printed":30730,"unit":"MW","mw":30730,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"No Studies Submitted","year":2028,"printed":71859,"unit":"MW","mw":71859,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"No Studies Submitted","year":2029,"printed":104699,"unit":"MW","mw":104699,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"No Studies Submitted","year":2030,"printed":131058,"unit":"MW","mw":131058,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Under ERCOT Review","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Under ERCOT Review","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Under ERCOT Review","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Under ERCOT Review","year":2025,"printed":4720,"unit":"MW","mw":4720,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Under ERCOT Review","year":2026,"printed":13935,"unit":"MW","mw":13935,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Under ERCOT Review","year":2027,"printed":37648,"unit":"MW","mw":37648,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Under ERCOT Review","year":2028,"printed":55859,"unit":"MW","mw":55859,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Under ERCOT Review","year":2029,"printed":63822,"unit":"MW","mw":63822,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Under ERCOT Review","year":2030,"printed":70630,"unit":"MW","mw":70630,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Planning Studies Approved","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Planning Studies Approved","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Planning Studies Approved","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Planning Studies Approved","year":2025,"printed":637,"unit":"MW","mw":637,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Planning Studies Approved","year":2026,"printed":5118,"unit":"MW","mw":5118,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Planning Studies Approved","year":2027,"printed":8866,"unit":"MW","mw":8866,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Planning Studies Approved","year":2028,"printed":12217,"unit":"MW","mw":12217,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Planning Studies Approved","year":2029,"printed":13394,"unit":"MW","mw":13394,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Planning Studies Approved","year":2030,"printed":14297,"unit":"MW","mw":14297,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Approved to Energize but Not Operational","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Approved to Energize but Not Operational","year":2023,"printed":79,"unit":"MW","mw":79,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Approved to Energize but Not Operational","year":2024,"printed":133,"unit":"MW","mw":133,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Approved to Energize but Not Operational","year":2025,"printed":1329,"unit":"MW","mw":1329,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Approved to Energize but Not Operational","year":2026,"printed":1901,"unit":"MW","mw":1901,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Approved to Energize but Not Operational","year":2027,"printed":1901,"unit":"MW","mw":1901,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Approved to Energize but Not Operational","year":2028,"printed":1901,"unit":"MW","mw":1901,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Approved to Energize but Not Operational","year":2029,"printed":2201,"unit":"MW","mw":2201,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Approved to Energize but Not Operational","year":2030,"printed":2201,"unit":"MW","mw":2201,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Observed Energized","year":2022,"printed":2634,"unit":"MW","mw":2634,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Observed Energized","year":2023,"printed":4327,"unit":"MW","mw":4327,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Observed Energized","year":2024,"printed":4832,"unit":"MW","mw":4832,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Observed Energized","year":2025,"printed":5300,"unit":"MW","mw":5300,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Observed Energized","year":2026,"printed":5300,"unit":"MW","mw":5300,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Observed Energized","year":2027,"printed":5300,"unit":"MW","mw":5300,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Observed Energized","year":2028,"printed":5300,"unit":"MW","mw":5300,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Observed Energized","year":2029,"printed":5300,"unit":"MW","mw":5300,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-10","status":"Observed Energized","year":2030,"printed":5300,"unit":"MW","mw":5300,"overview":"ERCOT Monthly Operational Overview (October 2025)","url":"https://www.ercot.com/files/docs/2025/11/17/ERCOT-Monthly-Operational-Overview-October-2025.pdf","page":9,"pdf_sha256":"69fd89ccc301235e9c63249a2acd514ed9d541ffcf7a9f2420b950943e86a33d","table_image_sha256":"bcddf36abec68b2f53c6f5b76b08d3d3080d38504dfe352558e9c4236ba415f1","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Total","year":2022,"printed":2634,"unit":"MW","mw":2634,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Total","year":2023,"printed":4406,"unit":"MW","mw":4406,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Total","year":2024,"printed":4965,"unit":"MW","mw":4965,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Total","year":2025,"printed":13337,"unit":"MW","mw":13337,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Total","year":2026,"printed":33591,"unit":"MW","mw":33591,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Total","year":2027,"printed":86424,"unit":"MW","mw":86424,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Total","year":2028,"printed":151019,"unit":"MW","mw":151019,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Total","year":2029,"printed":192320,"unit":"MW","mw":192320,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Total","year":2030,"printed":230799,"unit":"MW","mw":230799,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"No Studies Submitted","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"No Studies Submitted","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"No Studies Submitted","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"No Studies Submitted","year":2025,"printed":1414,"unit":"MW","mw":1414,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"No Studies Submitted","year":2026,"printed":7385,"unit":"MW","mw":7385,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"No Studies Submitted","year":2027,"printed":29580,"unit":"MW","mw":29580,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"No Studies Submitted","year":2028,"printed":70709,"unit":"MW","mw":70709,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"No Studies Submitted","year":2029,"printed":102470,"unit":"MW","mw":102470,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"No Studies Submitted","year":2030,"printed":131987,"unit":"MW","mw":131987,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Under ERCOT Review","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Under ERCOT Review","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Under ERCOT Review","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Under ERCOT Review","year":2025,"printed":4455,"unit":"MW","mw":4455,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Under ERCOT Review","year":2026,"printed":13670,"unit":"MW","mw":13670,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Under ERCOT Review","year":2027,"printed":40533,"unit":"MW","mw":40533,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Under ERCOT Review","year":2028,"printed":60627,"unit":"MW","mw":60627,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Under ERCOT Review","year":2029,"printed":68690,"unit":"MW","mw":68690,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Under ERCOT Review","year":2030,"printed":76749,"unit":"MW","mw":76749,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Planning Studies Approved","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Planning Studies Approved","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Planning Studies Approved","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Planning Studies Approved","year":2025,"printed":629,"unit":"MW","mw":629,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Planning Studies Approved","year":2026,"printed":5125,"unit":"MW","mw":5125,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Planning Studies Approved","year":2027,"printed":8900,"unit":"MW","mw":8900,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Planning Studies Approved","year":2028,"printed":12272,"unit":"MW","mw":12272,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Planning Studies Approved","year":2029,"printed":13449,"unit":"MW","mw":13449,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Planning Studies Approved","year":2030,"printed":14352,"unit":"MW","mw":14352,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Approved to Energize but Not Operational","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Approved to Energize but Not Operational","year":2023,"printed":64,"unit":"MW","mw":64,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Approved to Energize but Not Operational","year":2024,"printed":118,"unit":"MW","mw":118,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Approved to Energize but Not Operational","year":2025,"printed":1524,"unit":"MW","mw":1524,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Approved to Energize but Not Operational","year":2026,"printed":2096,"unit":"MW","mw":2096,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Approved to Energize but Not Operational","year":2027,"printed":2096,"unit":"MW","mw":2096,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Approved to Energize but Not Operational","year":2028,"printed":2096,"unit":"MW","mw":2096,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Approved to Energize but Not Operational","year":2029,"printed":2396,"unit":"MW","mw":2396,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Approved to Energize but Not Operational","year":2030,"printed":2396,"unit":"MW","mw":2396,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Observed Energized","year":2022,"printed":2634,"unit":"MW","mw":2634,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Observed Energized","year":2023,"printed":4342,"unit":"MW","mw":4342,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Observed Energized","year":2024,"printed":4847,"unit":"MW","mw":4847,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Observed Energized","year":2025,"printed":5315,"unit":"MW","mw":5315,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Observed Energized","year":2026,"printed":5315,"unit":"MW","mw":5315,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Observed Energized","year":2027,"printed":5315,"unit":"MW","mw":5315,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Observed Energized","year":2028,"printed":5315,"unit":"MW","mw":5315,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Observed Energized","year":2029,"printed":5315,"unit":"MW","mw":5315,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-11","status":"Observed Energized","year":2030,"printed":5315,"unit":"MW","mw":5315,"overview":"ERCOT Monthly Operational Overview (November 2025)","url":"https://www.ercot.com/files/docs/2025/12/16/ERCOT-Monthly-Operational-Overview-November-2025.pdf","page":9,"pdf_sha256":"9867d564418b6e6cd0e51439bb94c23e67b5ddaab5a923a114a43b8448e03956","table_image_sha256":"f3c8b704b3239bd34a53afd1a3beec35df1e366f1b2f94dfddb8b0062128686e","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Total","year":2022,"printed":2634,"unit":"MW","mw":2634,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Total","year":2023,"printed":4406,"unit":"MW","mw":4406,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Total","year":2024,"printed":4965,"unit":"MW","mw":4965,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Total","year":2025,"printed":6913,"unit":"MW","mw":6913,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Total","year":2026,"printed":26630,"unit":"MW","mw":26630,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Total","year":2027,"printed":82282,"unit":"MW","mw":82282,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Total","year":2028,"printed":146927,"unit":"MW","mw":146927,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Total","year":2029,"printed":189098,"unit":"MW","mw":189098,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Total","year":2030,"printed":233639,"unit":"MW","mw":233639,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"No Studies Submitted","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"No Studies Submitted","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"No Studies Submitted","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"No Studies Submitted","year":2025,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"No Studies Submitted","year":2026,"printed":6100,"unit":"MW","mw":6100,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"No Studies Submitted","year":2027,"printed":31301,"unit":"MW","mw":31301,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"No Studies Submitted","year":2028,"printed":73401,"unit":"MW","mw":73401,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"No Studies Submitted","year":2029,"printed":106867,"unit":"MW","mw":106867,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"No Studies Submitted","year":2030,"printed":140127,"unit":"MW","mw":140127,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Under ERCOT Review","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Under ERCOT Review","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Under ERCOT Review","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Under ERCOT Review","year":2025,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Under ERCOT Review","year":2026,"printed":7792,"unit":"MW","mw":7792,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Under ERCOT Review","year":2027,"printed":34174,"unit":"MW","mw":34174,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Under ERCOT Review","year":2028,"printed":53348,"unit":"MW","mw":53348,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Under ERCOT Review","year":2029,"printed":60575,"unit":"MW","mw":60575,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Under ERCOT Review","year":2030,"printed":70954,"unit":"MW","mw":70954,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Planning Studies Approved","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Planning Studies Approved","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Planning Studies Approved","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Planning Studies Approved","year":2025,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Planning Studies Approved","year":2026,"printed":4253,"unit":"MW","mw":4253,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Planning Studies Approved","year":2027,"printed":8322,"unit":"MW","mw":8322,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Planning Studies Approved","year":2028,"printed":11693,"unit":"MW","mw":11693,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Planning Studies Approved","year":2029,"printed":12871,"unit":"MW","mw":12871,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Planning Studies Approved","year":2030,"printed":13773,"unit":"MW","mw":13773,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Approved to Energize but Not Operational","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Approved to Energize but Not Operational","year":2023,"printed":40,"unit":"MW","mw":40,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Approved to Energize but Not Operational","year":2024,"printed":94,"unit":"MW","mw":94,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Approved to Energize but Not Operational","year":2025,"printed":1189,"unit":"MW","mw":1189,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Approved to Energize but Not Operational","year":2026,"printed":2761,"unit":"MW","mw":2761,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Approved to Energize but Not Operational","year":2027,"printed":2761,"unit":"MW","mw":2761,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Approved to Energize but Not Operational","year":2028,"printed":2761,"unit":"MW","mw":2761,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Approved to Energize but Not Operational","year":2029,"printed":3061,"unit":"MW","mw":3061,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Approved to Energize but Not Operational","year":2030,"printed":3061,"unit":"MW","mw":3061,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Observed Energized","year":2022,"printed":2634,"unit":"MW","mw":2634,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Observed Energized","year":2023,"printed":4366,"unit":"MW","mw":4366,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Observed Energized","year":2024,"printed":4871,"unit":"MW","mw":4871,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Observed Energized","year":2025,"printed":5724,"unit":"MW","mw":5724,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Observed Energized","year":2026,"printed":5724,"unit":"MW","mw":5724,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Observed Energized","year":2027,"printed":5724,"unit":"MW","mw":5724,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Observed Energized","year":2028,"printed":5724,"unit":"MW","mw":5724,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Observed Energized","year":2029,"printed":5724,"unit":"MW","mw":5724,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2025-12","status":"Observed Energized","year":2030,"printed":5724,"unit":"MW","mw":5724,"overview":"ERCOT Monthly Operational Overview (December 2025)","url":"https://www.ercot.com/files/docs/2026/01/15/ERCOT-Monthly-Operational-Overview-December-2025.pdf","page":9,"pdf_sha256":"2a7daf707427faac20f4111b43c0800496256c3b8ba2135b23afec23c6486974","table_image_sha256":"9c7cd9261e3391822045ace94730f881e57478c528845cbfd32d2823c0660102","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Total","year":2022,"printed":2634,"unit":"MW","mw":2634,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Total","year":2023,"printed":4406,"unit":"MW","mw":4406,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Total","year":2024,"printed":4965,"unit":"MW","mw":4965,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Total","year":2025,"printed":7830,"unit":"MW","mw":7830,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Total","year":2026,"printed":29308,"unit":"MW","mw":29308,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Total","year":2027,"printed":84967,"unit":"MW","mw":84967,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Total","year":2028,"printed":149807,"unit":"MW","mw":149807,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Total","year":2029,"printed":192948,"unit":"MW","mw":192948,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Total","year":2030,"printed":237189,"unit":"MW","mw":237189,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"No Studies Submitted","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"No Studies Submitted","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"No Studies Submitted","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"No Studies Submitted","year":2025,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"No Studies Submitted","year":2026,"printed":7012,"unit":"MW","mw":7012,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"No Studies Submitted","year":2027,"printed":31220,"unit":"MW","mw":31220,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"No Studies Submitted","year":2028,"printed":72805,"unit":"MW","mw":72805,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"No Studies Submitted","year":2029,"printed":106441,"unit":"MW","mw":106441,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"No Studies Submitted","year":2030,"printed":139551,"unit":"MW","mw":139551,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Under ERCOT Review","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Under ERCOT Review","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Under ERCOT Review","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Under ERCOT Review","year":2025,"printed":887,"unit":"MW","mw":887,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Under ERCOT Review","year":2026,"printed":9558,"unit":"MW","mw":9558,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Under ERCOT Review","year":2027,"printed":36940,"unit":"MW","mw":36940,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Under ERCOT Review","year":2028,"printed":56824,"unit":"MW","mw":56824,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Under ERCOT Review","year":2029,"printed":64851,"unit":"MW","mw":64851,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Under ERCOT Review","year":2030,"printed":75080,"unit":"MW","mw":75080,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Planning Studies Approved","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Planning Studies Approved","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Planning Studies Approved","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Planning Studies Approved","year":2025,"printed":30,"unit":"MW","mw":30,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Planning Studies Approved","year":2026,"printed":4253,"unit":"MW","mw":4253,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Planning Studies Approved","year":2027,"printed":8322,"unit":"MW","mw":8322,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Planning Studies Approved","year":2028,"printed":11693,"unit":"MW","mw":11693,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Planning Studies Approved","year":2029,"printed":12871,"unit":"MW","mw":12871,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Planning Studies Approved","year":2030,"printed":13773,"unit":"MW","mw":13773,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Approved to Energize but Not Operational","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Approved to Energize but Not Operational","year":2023,"printed":40,"unit":"MW","mw":40,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Approved to Energize but Not Operational","year":2024,"printed":94,"unit":"MW","mw":94,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Approved to Energize but Not Operational","year":2025,"printed":1189,"unit":"MW","mw":1189,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Approved to Energize but Not Operational","year":2026,"printed":2761,"unit":"MW","mw":2761,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Approved to Energize but Not Operational","year":2027,"printed":2761,"unit":"MW","mw":2761,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Approved to Energize but Not Operational","year":2028,"printed":2761,"unit":"MW","mw":2761,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Approved to Energize but Not Operational","year":2029,"printed":3061,"unit":"MW","mw":3061,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Approved to Energize but Not Operational","year":2030,"printed":3061,"unit":"MW","mw":3061,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Observed Energized","year":2022,"printed":2634,"unit":"MW","mw":2634,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Observed Energized","year":2023,"printed":4366,"unit":"MW","mw":4366,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Observed Energized","year":2024,"printed":4871,"unit":"MW","mw":4871,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Observed Energized","year":2025,"printed":5724,"unit":"MW","mw":5724,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Observed Energized","year":2026,"printed":5724,"unit":"MW","mw":5724,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Observed Energized","year":2027,"printed":5724,"unit":"MW","mw":5724,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Observed Energized","year":2028,"printed":5724,"unit":"MW","mw":5724,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Observed Energized","year":2029,"printed":5724,"unit":"MW","mw":5724,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-01","status":"Observed Energized","year":2030,"printed":5724,"unit":"MW","mw":5724,"overview":"ERCOT Monthly Operational Overview (January 2026)","url":"https://www.ercot.com/files/docs/2026/02/18/ERCOT-Monthly-Operational-Overview-January-2026.pdf","page":9,"pdf_sha256":"f9d9a4df9a05f89f011e9aff7eea7c3d260e743b68a4adbc0b165a3336e31fb1","table_image_sha256":"bac70c7b6a753d7e9786ec133c13d2b7b62ff060795b246a97aba2e1379cb622","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Total","year":2022,"printed":2634,"unit":"MW","mw":2634,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Total","year":2023,"printed":4286,"unit":"MW","mw":4286,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Total","year":2024,"printed":4845,"unit":"MW","mw":4845,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Total","year":2025,"printed":6714,"unit":"MW","mw":6714,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Total","year":2026,"printed":21765,"unit":"MW","mw":21765,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Total","year":2027,"printed":66679,"unit":"MW","mw":66679,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Total","year":2028,"printed":124785,"unit":"MW","mw":124785,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Total","year":2029,"printed":180910,"unit":"MW","mw":180910,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Total","year":2030,"printed":238630,"unit":"MW","mw":238630,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"No Studies Submitted","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"No Studies Submitted","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"No Studies Submitted","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"No Studies Submitted","year":2025,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"No Studies Submitted","year":2026,"printed":2704,"unit":"MW","mw":2704,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"No Studies Submitted","year":2027,"printed":20341,"unit":"MW","mw":20341,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"No Studies Submitted","year":2028,"printed":53546,"unit":"MW","mw":53546,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"No Studies Submitted","year":2029,"printed":95879,"unit":"MW","mw":95879,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"No Studies Submitted","year":2030,"printed":130303,"unit":"MW","mw":130303,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Under ERCOT Review","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Under ERCOT Review","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Under ERCOT Review","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Under ERCOT Review","year":2025,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Under ERCOT Review","year":2026,"printed":7353,"unit":"MW","mw":7353,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Under ERCOT Review","year":2027,"printed":28454,"unit":"MW","mw":28454,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Under ERCOT Review","year":2028,"printed":48171,"unit":"MW","mw":48171,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Under ERCOT Review","year":2029,"printed":58831,"unit":"MW","mw":58831,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Under ERCOT Review","year":2030,"printed":79825,"unit":"MW","mw":79825,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Planning Studies Approved","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Planning Studies Approved","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Planning Studies Approved","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Planning Studies Approved","year":2025,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Planning Studies Approved","year":2026,"printed":3181,"unit":"MW","mw":3181,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Planning Studies Approved","year":2027,"printed":9164,"unit":"MW","mw":9164,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Planning Studies Approved","year":2028,"printed":14348,"unit":"MW","mw":14348,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Planning Studies Approved","year":2029,"printed":17180,"unit":"MW","mw":17180,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Planning Studies Approved","year":2030,"printed":19482,"unit":"MW","mw":19482,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Approved to Energize but Not Operational","year":2022,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Approved to Energize but Not Operational","year":2023,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Approved to Energize but Not Operational","year":2024,"printed":0,"unit":"MW","mw":0,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Approved to Energize but Not Operational","year":2025,"printed":946,"unit":"MW","mw":946,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Approved to Energize but Not Operational","year":2026,"printed":2759,"unit":"MW","mw":2759,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Approved to Energize but Not Operational","year":2027,"printed":2952,"unit":"MW","mw":2952,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Approved to Energize but Not Operational","year":2028,"printed":2952,"unit":"MW","mw":2952,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Approved to Energize but Not Operational","year":2029,"printed":3252,"unit":"MW","mw":3252,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Approved to Energize but Not Operational","year":2030,"printed":3252,"unit":"MW","mw":3252,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Observed Energized","year":2022,"printed":2634,"unit":"MW","mw":2634,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Observed Energized","year":2023,"printed":4286,"unit":"MW","mw":4286,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Observed Energized","year":2024,"printed":4845,"unit":"MW","mw":4845,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Observed Energized","year":2025,"printed":5768,"unit":"MW","mw":5768,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Observed Energized","year":2026,"printed":5768,"unit":"MW","mw":5768,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Observed Energized","year":2027,"printed":5768,"unit":"MW","mw":5768,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Observed Energized","year":2028,"printed":5768,"unit":"MW","mw":5768,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Observed Energized","year":2029,"printed":5768,"unit":"MW","mw":5768,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-02","status":"Observed Energized","year":2030,"printed":5768,"unit":"MW","mw":5768,"overview":"ERCOT Monthly Operational Overview (February 2026)","url":"https://www.ercot.com/files/docs/2026/03/18/ERCOT-Monthly-Operational-Overview-February-2026.pdf","page":9,"pdf_sha256":"afaad6f78798765af7a3f5dba7c8fbecc3813a5bccbfdd95d9837fd9aff24276","table_image_sha256":"6c09cbc8e054d6d65f522ce3bed0c44dcce8374cdbba3be6e96b838f5e9e328f","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Total","year":2022,"printed":2.6,"unit":"GW","mw":2600,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Total","year":2023,"printed":4.3,"unit":"GW","mw":4300,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Total","year":2024,"printed":4.8,"unit":"GW","mw":4800,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Total","year":2025,"printed":6.7,"unit":"GW","mw":6700,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Total","year":2026,"printed":43.5,"unit":"GW","mw":43500,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Total","year":2027,"printed":150.6,"unit":"GW","mw":150600,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Total","year":2028,"printed":258,"unit":"GW","mw":258000,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Total","year":2029,"printed":337.2,"unit":"GW","mw":337200,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Total","year":2030,"printed":397.8,"unit":"GW","mw":397800,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Total","year":2031,"printed":417.3,"unit":"GW","mw":417300,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Total","year":2032,"printed":424,"unit":"GW","mw":424000,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Total","year":2033,"printed":429.8,"unit":"GW","mw":429800,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"No Studies Submitted","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"No Studies Submitted","year":2023,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"No Studies Submitted","year":2024,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"No Studies Submitted","year":2025,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"No Studies Submitted","year":2026,"printed":25.3,"unit":"GW","mw":25300,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"No Studies Submitted","year":2027,"printed":100.8,"unit":"GW","mw":100800,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"No Studies Submitted","year":2028,"printed":182.1,"unit":"GW","mw":182100,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"No Studies Submitted","year":2029,"printed":247,"unit":"GW","mw":247000,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"No Studies Submitted","year":2030,"printed":284.8,"unit":"GW","mw":284800,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"No Studies Submitted","year":2031,"printed":300.8,"unit":"GW","mw":300800,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"No Studies Submitted","year":2032,"printed":306.1,"unit":"GW","mw":306100,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"No Studies Submitted","year":2033,"printed":310.6,"unit":"GW","mw":310600,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Under ERCOT Review","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Under ERCOT Review","year":2023,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Under ERCOT Review","year":2024,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Under ERCOT Review","year":2025,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Under ERCOT Review","year":2026,"printed":6.7,"unit":"GW","mw":6700,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Under ERCOT Review","year":2027,"printed":31.2,"unit":"GW","mw":31200,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Under ERCOT Review","year":2028,"printed":53.3,"unit":"GW","mw":53300,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Under ERCOT Review","year":2029,"printed":65.3,"unit":"GW","mw":65300,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Under ERCOT Review","year":2030,"printed":87.2,"unit":"GW","mw":87200,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Under ERCOT Review","year":2031,"printed":90.6,"unit":"GW","mw":90600,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Under ERCOT Review","year":2032,"printed":91.9,"unit":"GW","mw":91900,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Under ERCOT Review","year":2033,"printed":93.1,"unit":"GW","mw":93100,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Section 9.5 Requirements Met","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Section 9.5 Requirements Met","year":2023,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Section 9.5 Requirements Met","year":2024,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Section 9.5 Requirements Met","year":2025,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Section 9.5 Requirements Met","year":2026,"printed":3,"unit":"GW","mw":3000,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Section 9.5 Requirements Met","year":2027,"printed":9.9,"unit":"GW","mw":9900,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Section 9.5 Requirements Met","year":2028,"printed":13.9,"unit":"GW","mw":13900,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Section 9.5 Requirements Met","year":2029,"printed":15.9,"unit":"GW","mw":15900,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Section 9.5 Requirements Met","year":2030,"printed":16.8,"unit":"GW","mw":16800,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Section 9.5 Requirements Met","year":2031,"printed":16.9,"unit":"GW","mw":16900,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Section 9.5 Requirements Met","year":2032,"printed":17,"unit":"GW","mw":17000,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Section 9.5 Requirements Met","year":2033,"printed":17.1,"unit":"GW","mw":17100,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"A2E but not operational","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"A2E but not operational","year":2023,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"A2E but not operational","year":2024,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"A2E but not operational","year":2025,"printed":0.9,"unit":"GW","mw":900,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"A2E but not operational","year":2026,"printed":2.7,"unit":"GW","mw":2700,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"A2E but not operational","year":2027,"printed":2.9,"unit":"GW","mw":2900,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"A2E but not operational","year":2028,"printed":2.9,"unit":"GW","mw":2900,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"A2E but not operational","year":2029,"printed":3.2,"unit":"GW","mw":3200,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"A2E but not operational","year":2030,"printed":3.2,"unit":"GW","mw":3200,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"A2E but not operational","year":2031,"printed":3.2,"unit":"GW","mw":3200,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"A2E but not operational","year":2032,"printed":3.2,"unit":"GW","mw":3200,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"A2E but not operational","year":2033,"printed":3.2,"unit":"GW","mw":3200,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Observed Energized","year":2022,"printed":2.6,"unit":"GW","mw":2600,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Observed Energized","year":2023,"printed":4.3,"unit":"GW","mw":4300,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Observed Energized","year":2024,"printed":4.8,"unit":"GW","mw":4800,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Observed Energized","year":2025,"printed":5.8,"unit":"GW","mw":5800,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Observed Energized","year":2026,"printed":5.8,"unit":"GW","mw":5800,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Observed Energized","year":2027,"printed":5.8,"unit":"GW","mw":5800,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Observed Energized","year":2028,"printed":5.8,"unit":"GW","mw":5800,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Observed Energized","year":2029,"printed":5.8,"unit":"GW","mw":5800,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Observed Energized","year":2030,"printed":5.8,"unit":"GW","mw":5800,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Observed Energized","year":2031,"printed":5.8,"unit":"GW","mw":5800,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Observed Energized","year":2032,"printed":5.8,"unit":"GW","mw":5800,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-03","status":"Observed Energized","year":2033,"printed":5.8,"unit":"GW","mw":5800,"overview":"ERCOT Monthly Operational Overview (March 2026)","url":"https://www.ercot.com/files/docs/2026/04/16/ERCOT-Monthly-Operational-Overview-March-2026.pdf","page":9,"pdf_sha256":"00fdeec4355b13bbb023aefb21a4f0a8d2c512a17817f1301088067dc636b462","table_image_sha256":"f3b18580d8a550ebf757522c58cd24b6abc94fb158f46d7ac8c0978f8b7ed051","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Total","year":2022,"printed":2.6,"unit":"GW","mw":2600,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Total","year":2023,"printed":4.8,"unit":"GW","mw":4800,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Total","year":2024,"printed":6.4,"unit":"GW","mw":6400,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Total","year":2025,"printed":8.8,"unit":"GW","mw":8800,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Total","year":2026,"printed":53.5,"unit":"GW","mw":53500,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Total","year":2027,"printed":194.8,"unit":"GW","mw":194800,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Total","year":2028,"printed":326.5,"unit":"GW","mw":326500,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Total","year":2029,"printed":389.4,"unit":"GW","mw":389400,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Total","year":2030,"printed":427.8,"unit":"GW","mw":427800,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Total","year":2031,"printed":437.8,"unit":"GW","mw":437800,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Total","year":2032,"printed":438.1,"unit":"GW","mw":438100,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Total","year":2033,"printed":438.1,"unit":"GW","mw":438100,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"No Studies Submitted","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"No Studies Submitted","year":2023,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"No Studies Submitted","year":2024,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"No Studies Submitted","year":2025,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"No Studies Submitted","year":2026,"printed":26.9,"unit":"GW","mw":26900,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"No Studies Submitted","year":2027,"printed":122.6,"unit":"GW","mw":122600,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"No Studies Submitted","year":2028,"printed":232.3,"unit":"GW","mw":232300,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"No Studies Submitted","year":2029,"printed":282.9,"unit":"GW","mw":282900,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"No Studies Submitted","year":2030,"printed":311.1,"unit":"GW","mw":311100,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"No Studies Submitted","year":2031,"printed":321.1,"unit":"GW","mw":321100,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"No Studies Submitted","year":2032,"printed":321.4,"unit":"GW","mw":321400,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"No Studies Submitted","year":2033,"printed":321.4,"unit":"GW","mw":321400,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Under ERCOT Review","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Under ERCOT Review","year":2023,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Under ERCOT Review","year":2024,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Under ERCOT Review","year":2025,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Under ERCOT Review","year":2026,"printed":8.9,"unit":"GW","mw":8900,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Under ERCOT Review","year":2027,"printed":43.3,"unit":"GW","mw":43300,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Under ERCOT Review","year":2028,"printed":60.1,"unit":"GW","mw":60100,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Under ERCOT Review","year":2029,"printed":70,"unit":"GW","mw":70000,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Under ERCOT Review","year":2030,"printed":80.2,"unit":"GW","mw":80200,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Under ERCOT Review","year":2031,"printed":80.2,"unit":"GW","mw":80200,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Under ERCOT Review","year":2032,"printed":80.2,"unit":"GW","mw":80200,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Under ERCOT Review","year":2033,"printed":80.2,"unit":"GW","mw":80200,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4 Requirements Only","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4 Requirements Only","year":2023,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4 Requirements Only","year":2024,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4 Requirements Only","year":2025,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4 Requirements Only","year":2026,"printed":0.4,"unit":"GW","mw":400,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4 Requirements Only","year":2027,"printed":2.5,"unit":"GW","mw":2500,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4 Requirements Only","year":2028,"printed":3.7,"unit":"GW","mw":3700,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4 Requirements Only","year":2029,"printed":5.8,"unit":"GW","mw":5800,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4 Requirements Only","year":2030,"printed":5.8,"unit":"GW","mw":5800,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4 Requirements Only","year":2031,"printed":5.8,"unit":"GW","mw":5800,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4 Requirements Only","year":2032,"printed":5.8,"unit":"GW","mw":5800,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4 Requirements Only","year":2033,"printed":5.8,"unit":"GW","mw":5800,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4/9.5 Requirements Met","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4/9.5 Requirements Met","year":2023,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4/9.5 Requirements Met","year":2024,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4/9.5 Requirements Met","year":2025,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4/9.5 Requirements Met","year":2026,"printed":8.3,"unit":"GW","mw":8300,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4/9.5 Requirements Met","year":2027,"printed":17.4,"unit":"GW","mw":17400,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4/9.5 Requirements Met","year":2028,"printed":21.4,"unit":"GW","mw":21400,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4/9.5 Requirements Met","year":2029,"printed":21.7,"unit":"GW","mw":21700,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4/9.5 Requirements Met","year":2030,"printed":21.7,"unit":"GW","mw":21700,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4/9.5 Requirements Met","year":2031,"printed":21.7,"unit":"GW","mw":21700,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4/9.5 Requirements Met","year":2032,"printed":21.7,"unit":"GW","mw":21700,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Section 9.4/9.5 Requirements Met","year":2033,"printed":21.7,"unit":"GW","mw":21700,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"A2E but not operational","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"A2E but not operational","year":2023,"printed":0.3,"unit":"GW","mw":300,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"A2E but not operational","year":2024,"printed":1.4,"unit":"GW","mw":1400,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"A2E but not operational","year":2025,"printed":3,"unit":"GW","mw":3000,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"A2E but not operational","year":2026,"printed":3.1,"unit":"GW","mw":3100,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"A2E but not operational","year":2027,"printed":3.1,"unit":"GW","mw":3100,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"A2E but not operational","year":2028,"printed":3.1,"unit":"GW","mw":3100,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"A2E but not operational","year":2029,"printed":3.1,"unit":"GW","mw":3100,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"A2E but not operational","year":2030,"printed":3.1,"unit":"GW","mw":3100,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"A2E but not operational","year":2031,"printed":3.1,"unit":"GW","mw":3100,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"A2E but not operational","year":2032,"printed":3.1,"unit":"GW","mw":3100,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"A2E but not operational","year":2033,"printed":3.1,"unit":"GW","mw":3100,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Observed Energized","year":2022,"printed":2.6,"unit":"GW","mw":2600,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Observed Energized","year":2023,"printed":4.5,"unit":"GW","mw":4500,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Observed Energized","year":2024,"printed":5,"unit":"GW","mw":5000,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Observed Energized","year":2025,"printed":5.8,"unit":"GW","mw":5800,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Observed Energized","year":2026,"printed":5.9,"unit":"GW","mw":5900,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Observed Energized","year":2027,"printed":5.9,"unit":"GW","mw":5900,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Observed Energized","year":2028,"printed":5.9,"unit":"GW","mw":5900,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Observed Energized","year":2029,"printed":5.9,"unit":"GW","mw":5900,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Observed Energized","year":2030,"printed":5.9,"unit":"GW","mw":5900,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Observed Energized","year":2031,"printed":5.9,"unit":"GW","mw":5900,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Observed Energized","year":2032,"printed":5.9,"unit":"GW","mw":5900,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-04","status":"Observed Energized","year":2033,"printed":5.9,"unit":"GW","mw":5900,"overview":"ERCOT Monthly Operational Overview (April 2026)","url":"https://www.ercot.com/files/docs/2026/05/19/ERCOT-Monthly-Operational-Overview-April-2026.pdf","page":9,"pdf_sha256":"002e14196894e0f9bd5031243fc95071aea3f8129503a8fede4f58b6c35ca0bd","table_image_sha256":"9d14b048f50b00a7d672df597702f8595e43ffd8b445adc7bc8f68758b686925","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Total","year":2022,"printed":2.6,"unit":"GW","mw":2600,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Total","year":2023,"printed":4.8,"unit":"GW","mw":4800,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Total","year":2024,"printed":6.4,"unit":"GW","mw":6400,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Total","year":2025,"printed":13,"unit":"GW","mw":13000,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Total","year":2026,"printed":61.1,"unit":"GW","mw":61100,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Total","year":2027,"printed":206.2,"unit":"GW","mw":206200,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Total","year":2028,"printed":359.8,"unit":"GW","mw":359800,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Total","year":2029,"printed":432.7,"unit":"GW","mw":432700,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Total","year":2030,"printed":463.1,"unit":"GW","mw":463100,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Total","year":2031,"printed":474.1,"unit":"GW","mw":474100,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Total","year":2032,"printed":474.7,"unit":"GW","mw":474700,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Total","year":2033,"printed":474.7,"unit":"GW","mw":474700,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"No Studies Submitted","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"No Studies Submitted","year":2023,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"No Studies Submitted","year":2024,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"No Studies Submitted","year":2025,"printed":4.1,"unit":"GW","mw":4100,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"No Studies Submitted","year":2026,"printed":32.8,"unit":"GW","mw":32800,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"No Studies Submitted","year":2027,"printed":109,"unit":"GW","mw":109000,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"No Studies Submitted","year":2028,"printed":205.8,"unit":"GW","mw":205800,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"No Studies Submitted","year":2029,"printed":261,"unit":"GW","mw":261000,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"No Studies Submitted","year":2030,"printed":273.5,"unit":"GW","mw":273500,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"No Studies Submitted","year":2031,"printed":284,"unit":"GW","mw":284000,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"No Studies Submitted","year":2032,"printed":284.3,"unit":"GW","mw":284300,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"No Studies Submitted","year":2033,"printed":284.3,"unit":"GW","mw":284300,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Under ERCOT Review","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Under ERCOT Review","year":2023,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Under ERCOT Review","year":2024,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Under ERCOT Review","year":2025,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Under ERCOT Review","year":2026,"printed":7.5,"unit":"GW","mw":7500,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Under ERCOT Review","year":2027,"printed":53.5,"unit":"GW","mw":53500,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Under ERCOT Review","year":2028,"printed":103.6,"unit":"GW","mw":103600,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Under ERCOT Review","year":2029,"printed":118.5,"unit":"GW","mw":118500,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Under ERCOT Review","year":2030,"printed":135.1,"unit":"GW","mw":135100,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Under ERCOT Review","year":2031,"printed":135.5,"unit":"GW","mw":135500,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Under ERCOT Review","year":2032,"printed":135.5,"unit":"GW","mw":135500,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Under ERCOT Review","year":2033,"printed":135.5,"unit":"GW","mw":135500,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4 Requirements Only","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4 Requirements Only","year":2023,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4 Requirements Only","year":2024,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4 Requirements Only","year":2025,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4 Requirements Only","year":2026,"printed":1.5,"unit":"GW","mw":1500,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4 Requirements Only","year":2027,"printed":4.7,"unit":"GW","mw":4700,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4 Requirements Only","year":2028,"printed":6.3,"unit":"GW","mw":6300,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4 Requirements Only","year":2029,"printed":8.5,"unit":"GW","mw":8500,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4 Requirements Only","year":2030,"printed":9.9,"unit":"GW","mw":9900,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4 Requirements Only","year":2031,"printed":9.9,"unit":"GW","mw":9900,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4 Requirements Only","year":2032,"printed":9.9,"unit":"GW","mw":9900,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4 Requirements Only","year":2033,"printed":9.9,"unit":"GW","mw":9900,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4/9.5 Requirements Met","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4/9.5 Requirements Met","year":2023,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4/9.5 Requirements Met","year":2024,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4/9.5 Requirements Met","year":2025,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4/9.5 Requirements Met","year":2026,"printed":10.2,"unit":"GW","mw":10200,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4/9.5 Requirements Met","year":2027,"printed":29.9,"unit":"GW","mw":29900,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4/9.5 Requirements Met","year":2028,"printed":35,"unit":"GW","mw":35000,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4/9.5 Requirements Met","year":2029,"printed":35.7,"unit":"GW","mw":35700,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4/9.5 Requirements Met","year":2030,"printed":35.7,"unit":"GW","mw":35700,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4/9.5 Requirements Met","year":2031,"printed":35.7,"unit":"GW","mw":35700,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4/9.5 Requirements Met","year":2032,"printed":36,"unit":"GW","mw":36000,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Section 9.4/9.5 Requirements Met","year":2033,"printed":36,"unit":"GW","mw":36000,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"A2E but not operational","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"A2E but not operational","year":2023,"printed":0.3,"unit":"GW","mw":300,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"A2E but not operational","year":2024,"printed":1.4,"unit":"GW","mw":1400,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"A2E but not operational","year":2025,"printed":3,"unit":"GW","mw":3000,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"A2E but not operational","year":2026,"printed":3.2,"unit":"GW","mw":3200,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"A2E but not operational","year":2027,"printed":3.2,"unit":"GW","mw":3200,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"A2E but not operational","year":2028,"printed":3.2,"unit":"GW","mw":3200,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"A2E but not operational","year":2029,"printed":3.2,"unit":"GW","mw":3200,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"A2E but not operational","year":2030,"printed":3.2,"unit":"GW","mw":3200,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"A2E but not operational","year":2031,"printed":3.2,"unit":"GW","mw":3200,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"A2E but not operational","year":2032,"printed":3.2,"unit":"GW","mw":3200,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"A2E but not operational","year":2033,"printed":3.2,"unit":"GW","mw":3200,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Observed Energized","year":2022,"printed":2.6,"unit":"GW","mw":2600,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Observed Energized","year":2023,"printed":4.5,"unit":"GW","mw":4500,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Observed Energized","year":2024,"printed":5,"unit":"GW","mw":5000,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Observed Energized","year":2025,"printed":5.8,"unit":"GW","mw":5800,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Observed Energized","year":2026,"printed":5.9,"unit":"GW","mw":5900,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Observed Energized","year":2027,"printed":5.9,"unit":"GW","mw":5900,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Observed Energized","year":2028,"printed":5.9,"unit":"GW","mw":5900,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Observed Energized","year":2029,"printed":5.9,"unit":"GW","mw":5900,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Observed Energized","year":2030,"printed":5.9,"unit":"GW","mw":5900,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Observed Energized","year":2031,"printed":5.9,"unit":"GW","mw":5900,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Observed Energized","year":2032,"printed":5.9,"unit":"GW","mw":5900,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-05","status":"Observed Energized","year":2033,"printed":5.9,"unit":"GW","mw":5900,"overview":"ERCOT Monthly Operational Overview (May 2026)","url":"https://www.ercot.com/files/docs/2026/06/15/ERCOT-Monthly-Operational-Overview-Final-May-2026.pdf","page":9,"pdf_sha256":"7b943dc62a188d859433e50b58bb7268c0ad024f5ef2d3edf60498c64867dfd2","table_image_sha256":"7d9731f1a4a25693fa45794a43895332796c8013be448cc519759ca325261229","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Total","year":2022,"printed":3.3,"unit":"GW","mw":3300,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Total","year":2023,"printed":4.7,"unit":"GW","mw":4700,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Total","year":2024,"printed":6.6,"unit":"GW","mw":6600,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Total","year":2025,"printed":15.9,"unit":"GW","mw":15900,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Total","year":2026,"printed":64.8,"unit":"GW","mw":64800,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Total","year":2027,"printed":201.2,"unit":"GW","mw":201200,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Total","year":2028,"printed":349.7,"unit":"GW","mw":349700,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Total","year":2029,"printed":416.5,"unit":"GW","mw":416500,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Total","year":2030,"printed":444.9,"unit":"GW","mw":444900,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Total","year":2031,"printed":464.8,"unit":"GW","mw":464800,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Total","year":2032,"printed":465.5,"unit":"GW","mw":465500,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Total","year":2033,"printed":465.5,"unit":"GW","mw":465500,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"No Studies Submitted","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"No Studies Submitted","year":2023,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"No Studies Submitted","year":2024,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"No Studies Submitted","year":2025,"printed":4.1,"unit":"GW","mw":4100,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"No Studies Submitted","year":2026,"printed":32.3,"unit":"GW","mw":32300,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"No Studies Submitted","year":2027,"printed":102.4,"unit":"GW","mw":102400,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"No Studies Submitted","year":2028,"printed":186.2,"unit":"GW","mw":186200,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"No Studies Submitted","year":2029,"printed":228.8,"unit":"GW","mw":228800,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"No Studies Submitted","year":2030,"printed":242.2,"unit":"GW","mw":242200,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"No Studies Submitted","year":2031,"printed":253.7,"unit":"GW","mw":253700,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"No Studies Submitted","year":2032,"printed":254,"unit":"GW","mw":254000,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"No Studies Submitted","year":2033,"printed":254,"unit":"GW","mw":254000,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Under ERCOT Review","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Under ERCOT Review","year":2023,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Under ERCOT Review","year":2024,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Under ERCOT Review","year":2025,"printed":3,"unit":"GW","mw":3000,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Under ERCOT Review","year":2026,"printed":11,"unit":"GW","mw":11000,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Under ERCOT Review","year":2027,"printed":48.5,"unit":"GW","mw":48500,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Under ERCOT Review","year":2028,"printed":104.1,"unit":"GW","mw":104100,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Under ERCOT Review","year":2029,"printed":124.5,"unit":"GW","mw":124500,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Under ERCOT Review","year":2030,"printed":135.6,"unit":"GW","mw":135600,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Under ERCOT Review","year":2031,"printed":144,"unit":"GW","mw":144000,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Under ERCOT Review","year":2032,"printed":144,"unit":"GW","mw":144000,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Under ERCOT Review","year":2033,"printed":144,"unit":"GW","mw":144000,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4 Requirements Only","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4 Requirements Only","year":2023,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4 Requirements Only","year":2024,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4 Requirements Only","year":2025,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4 Requirements Only","year":2026,"printed":1.5,"unit":"GW","mw":1500,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4 Requirements Only","year":2027,"printed":8.4,"unit":"GW","mw":8400,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4 Requirements Only","year":2028,"printed":10.7,"unit":"GW","mw":10700,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4 Requirements Only","year":2029,"printed":13.9,"unit":"GW","mw":13900,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4 Requirements Only","year":2030,"printed":17.4,"unit":"GW","mw":17400,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4 Requirements Only","year":2031,"printed":17.4,"unit":"GW","mw":17400,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4 Requirements Only","year":2032,"printed":17.4,"unit":"GW","mw":17400,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4 Requirements Only","year":2033,"printed":17.4,"unit":"GW","mw":17400,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4/9.5 Requirements Met","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4/9.5 Requirements Met","year":2023,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4/9.5 Requirements Met","year":2024,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4/9.5 Requirements Met","year":2025,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4/9.5 Requirements Met","year":2026,"printed":11.1,"unit":"GW","mw":11100,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4/9.5 Requirements Met","year":2027,"printed":33,"unit":"GW","mw":33000,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4/9.5 Requirements Met","year":2028,"printed":39.7,"unit":"GW","mw":39700,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4/9.5 Requirements Met","year":2029,"printed":40.3,"unit":"GW","mw":40300,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4/9.5 Requirements Met","year":2030,"printed":40.7,"unit":"GW","mw":40700,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4/9.5 Requirements Met","year":2031,"printed":40.7,"unit":"GW","mw":40700,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4/9.5 Requirements Met","year":2032,"printed":41.1,"unit":"GW","mw":41100,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Section 9.4/9.5 Requirements Met","year":2033,"printed":41.1,"unit":"GW","mw":41100,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"A2E but not operational","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"A2E but not operational","year":2023,"printed":0.4,"unit":"GW","mw":400,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"A2E but not operational","year":2024,"printed":1.8,"unit":"GW","mw":1800,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"A2E but not operational","year":2025,"printed":3.1,"unit":"GW","mw":3100,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"A2E but not operational","year":2026,"printed":3.2,"unit":"GW","mw":3200,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"A2E but not operational","year":2027,"printed":3.2,"unit":"GW","mw":3200,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"A2E but not operational","year":2028,"printed":3.2,"unit":"GW","mw":3200,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"A2E but not operational","year":2029,"printed":3.2,"unit":"GW","mw":3200,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"A2E but not operational","year":2030,"printed":3.2,"unit":"GW","mw":3200,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"A2E but not operational","year":2031,"printed":3.2,"unit":"GW","mw":3200,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"A2E but not operational","year":2032,"printed":3.2,"unit":"GW","mw":3200,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"A2E but not operational","year":2033,"printed":3.2,"unit":"GW","mw":3200,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Observed Energized","year":2022,"printed":3.3,"unit":"GW","mw":3300,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Observed Energized","year":2023,"printed":4.3,"unit":"GW","mw":4300,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Observed Energized","year":2024,"printed":4.8,"unit":"GW","mw":4800,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Observed Energized","year":2025,"printed":5.7,"unit":"GW","mw":5700,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Observed Energized","year":2026,"printed":5.7,"unit":"GW","mw":5700,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Observed Energized","year":2027,"printed":5.7,"unit":"GW","mw":5700,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Observed Energized","year":2028,"printed":5.7,"unit":"GW","mw":5700,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Observed Energized","year":2029,"printed":5.7,"unit":"GW","mw":5700,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Observed Energized","year":2030,"printed":5.7,"unit":"GW","mw":5700,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Observed Energized","year":2031,"printed":5.7,"unit":"GW","mw":5700,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Observed Energized","year":2032,"printed":5.7,"unit":"GW","mw":5700,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-06","status":"Observed Energized","year":2033,"printed":5.7,"unit":"GW","mw":5700,"overview":"ERCOT Monthly Operational Overview (June 2026)","url":"https://www.ercot.com/files/docs/2026/07/17/ERCOT-Monthly-Operational-Overview-June-2026.pdf","page":9,"pdf_sha256":"a967182359f661b8c5f05f4edf5df459fa098da6a7f7d99c6f2e76021b563e67","table_image_sha256":"fbdbfcbd76974bcf26ed05c26c4848c969761039e94b819d5e411d0967ae6bc0","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Total","year":2022,"printed":3.3,"unit":"GW","mw":3300,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Total","year":2023,"printed":4.7,"unit":"GW","mw":4700,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Total","year":2024,"printed":6.6,"unit":"GW","mw":6600,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Total","year":2025,"printed":16,"unit":"GW","mw":16000,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Total","year":2026,"printed":66.9,"unit":"GW","mw":66900,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Total","year":2027,"printed":203.5,"unit":"GW","mw":203500,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Total","year":2028,"printed":351.2,"unit":"GW","mw":351200,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Total","year":2029,"printed":418.4,"unit":"GW","mw":418400,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Total","year":2030,"printed":446.8,"unit":"GW","mw":446800,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Total","year":2031,"printed":466.8,"unit":"GW","mw":466800,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Total","year":2032,"printed":467.4,"unit":"GW","mw":467400,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Total","year":2033,"printed":467.4,"unit":"GW","mw":467400,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"No Studies Submitted","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"No Studies Submitted","year":2023,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"No Studies Submitted","year":2024,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"No Studies Submitted","year":2025,"printed":4.1,"unit":"GW","mw":4100,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"No Studies Submitted","year":2026,"printed":32.3,"unit":"GW","mw":32300,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"No Studies Submitted","year":2027,"printed":101,"unit":"GW","mw":101000,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"No Studies Submitted","year":2028,"printed":180.6,"unit":"GW","mw":180600,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"No Studies Submitted","year":2029,"printed":221.1,"unit":"GW","mw":221100,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"No Studies Submitted","year":2030,"printed":233.1,"unit":"GW","mw":233100,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"No Studies Submitted","year":2031,"printed":244.6,"unit":"GW","mw":244600,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"No Studies Submitted","year":2032,"printed":244.9,"unit":"GW","mw":244900,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"No Studies Submitted","year":2033,"printed":244.9,"unit":"GW","mw":244900,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Under ERCOT Review","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Under ERCOT Review","year":2023,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Under ERCOT Review","year":2024,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Under ERCOT Review","year":2025,"printed":3,"unit":"GW","mw":3000,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Under ERCOT Review","year":2026,"printed":9.9,"unit":"GW","mw":9900,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Under ERCOT Review","year":2027,"printed":44.5,"unit":"GW","mw":44500,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Under ERCOT Review","year":2028,"printed":94,"unit":"GW","mw":94000,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Under ERCOT Review","year":2029,"printed":114.1,"unit":"GW","mw":114100,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Under ERCOT Review","year":2030,"printed":126.5,"unit":"GW","mw":126500,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Under ERCOT Review","year":2031,"printed":132,"unit":"GW","mw":132000,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Under ERCOT Review","year":2032,"printed":132,"unit":"GW","mw":132000,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Under ERCOT Review","year":2033,"printed":132,"unit":"GW","mw":132000,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4 Requirements Only","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4 Requirements Only","year":2023,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4 Requirements Only","year":2024,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4 Requirements Only","year":2025,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4 Requirements Only","year":2026,"printed":1.7,"unit":"GW","mw":1700,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4 Requirements Only","year":2027,"printed":6.6,"unit":"GW","mw":6600,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4 Requirements Only","year":2028,"printed":10.9,"unit":"GW","mw":10900,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4 Requirements Only","year":2029,"printed":13.4,"unit":"GW","mw":13400,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4 Requirements Only","year":2030,"printed":13.8,"unit":"GW","mw":13800,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4 Requirements Only","year":2031,"printed":13.8,"unit":"GW","mw":13800,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4 Requirements Only","year":2032,"printed":13.8,"unit":"GW","mw":13800,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4 Requirements Only","year":2033,"printed":13.8,"unit":"GW","mw":13800,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4/9.5 Requirements Met","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4/9.5 Requirements Met","year":2023,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4/9.5 Requirements Met","year":2024,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4/9.5 Requirements Met","year":2025,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4/9.5 Requirements Met","year":2026,"printed":13.6,"unit":"GW","mw":13600,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4/9.5 Requirements Met","year":2027,"printed":42,"unit":"GW","mw":42000,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4/9.5 Requirements Met","year":2028,"printed":56.2,"unit":"GW","mw":56200,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4/9.5 Requirements Met","year":2029,"printed":60.3,"unit":"GW","mw":60300,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4/9.5 Requirements Met","year":2030,"printed":63.8,"unit":"GW","mw":63800,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4/9.5 Requirements Met","year":2031,"printed":66.8,"unit":"GW","mw":66800,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4/9.5 Requirements Met","year":2032,"printed":67.2,"unit":"GW","mw":67200,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Section 9.4/9.5 Requirements Met","year":2033,"printed":67.2,"unit":"GW","mw":67200,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"A2E but not operational","year":2022,"printed":0,"unit":"GW","mw":0,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"A2E but not operational","year":2023,"printed":0.4,"unit":"GW","mw":400,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"A2E but not operational","year":2024,"printed":1.8,"unit":"GW","mw":1800,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"A2E but not operational","year":2025,"printed":3.2,"unit":"GW","mw":3200,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"A2E but not operational","year":2026,"printed":3.7,"unit":"GW","mw":3700,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"A2E but not operational","year":2027,"printed":3.7,"unit":"GW","mw":3700,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"A2E but not operational","year":2028,"printed":3.7,"unit":"GW","mw":3700,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"A2E but not operational","year":2029,"printed":3.7,"unit":"GW","mw":3700,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"A2E but not operational","year":2030,"printed":3.7,"unit":"GW","mw":3700,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"A2E but not operational","year":2031,"printed":3.7,"unit":"GW","mw":3700,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"A2E but not operational","year":2032,"printed":3.7,"unit":"GW","mw":3700,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"A2E but not operational","year":2033,"printed":3.7,"unit":"GW","mw":3700,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Observed Energized","year":2022,"printed":3.3,"unit":"GW","mw":3300,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Observed Energized","year":2023,"printed":4.3,"unit":"GW","mw":4300,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Observed Energized","year":2024,"printed":4.8,"unit":"GW","mw":4800,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Observed Energized","year":2025,"printed":5.7,"unit":"GW","mw":5700,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Observed Energized","year":2026,"printed":5.7,"unit":"GW","mw":5700,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Observed Energized","year":2027,"printed":5.7,"unit":"GW","mw":5700,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Observed Energized","year":2028,"printed":5.7,"unit":"GW","mw":5700,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Observed Energized","year":2029,"printed":5.7,"unit":"GW","mw":5700,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Observed Energized","year":2030,"printed":5.7,"unit":"GW","mw":5700,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Observed Energized","year":2031,"printed":5.7,"unit":"GW","mw":5700,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Observed Energized","year":2032,"printed":5.7,"unit":"GW","mw":5700,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"},{"month":"2026-07","status":"Observed Energized","year":2033,"printed":5.7,"unit":"GW","mw":5700,"overview":"ERCOT Monthly Operational Overview (July 2026)","url":"https://www.ercot.com/files/docs/2026/08/17/ERCOT-Monthly-Operational-Overview-July-2026.pdf","page":9,"pdf_sha256":"07f3e1693efff73b4f0a62c57f7d9698f9694dee749c1e8da624fd99a9984414","table_image_sha256":"c478533106e203d3c57f5323fcbe8e0cd354f6b424341932efaea2268f22b67d","publisher":"Electric Reliability Council of Texas (ERCOT)","license":"ERCOT terms of use: public contents may be reproduced unmodified, and raw data used in compilations, charts and analyses (https://www.ercot.com/help/terms)"}]}
