{"api":"v1","id":"chips.fabs","title":"The fab record: each plant’s dated fields and public money, quoted","section":"chips","row":"one dated field of one plant","page":"https://jesseahawkins.com/chips/fabs/","fields":[{"name":"field","type":"string","tier":null},{"name":"plant_id","type":"string","tier":null},{"name":"owner","type":"string","tier":null},{"name":"plant","type":"string","tier":null},{"name":"country","type":"string","tier":null},{"name":"date","type":"string","tier":null},{"name":"target","type":"string","tier":null},{"name":"window_end","type":"string","tier":null},{"name":"value","type":"string","tier":"quoted"},{"name":"unit","type":"string","tier":null},{"name":"detail","type":"string","tier":null},{"name":"quote","type":"string","tier":"quoted"},{"name":"source_url","type":"string","tier":null},{"name":"license","type":"string","tier":null},{"name":"page","type":"string","tier":null}],"tiers":["quoted"],"provenance":"Each field is quoted from its source page.","freshness":{"state":"current","asOf":"2026-11-12","oldestCheck":"2026-10-20","next":"2026-12-04","late":"2026-12-11","status":"https://jesseahawkins.com/status/","sources":["fabs"],"notice":null},"rowCount":130,"terms":["quoted for comment"],"checked":"2026-10-20","nextCheckBy":"2026-12-04","links":{"rows":"https://jesseahawkins.com/data/v1/datasets/chips.fabs.json","csv":"https://jesseahawkins.com/chips/fabs.csv","releases":"https://jesseahawkins.com/data/v1/datasets/chips.fabs/releases.json"},"latestRelease":{"id":"2026-10-20","date":"2026-10-20","sha256":"12d3f369b1aa7b39d031ed45c0e5fb212b51666bef4605f548ceda1a34326bd5","json":"https://jesseahawkins.com/data/v1/datasets/chips.fabs/releases/2026-10-20.json","csv":"https://jesseahawkins.com/data/releases/chips/fabs/2026-10-20.csv"},"csvSha256":"12d3f369b1aa7b39d031ed45c0e5fb212b51666bef4605f548ceda1a34326bd5","matchesLatestRelease":true,"rows":[{"field":"promise","plant_id":"tsmc-arizona-fab-1","owner":"TSMC","plant":"TSMC Arizona first fab","country":"United States","date":"2024-11-15","target":"2025-H1","window_end":"2025-06-30","value":null,"unit":null,"detail":"production (production)","quote":"Fab 1 : On track to start production in first half of 2025","source_url":"https://www.nist.gov/chips/tsmc-arizona-phoenix","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"tsmc-arizona-fab-1","owner":"TSMC","plant":"TSMC Arizona first fab","country":"United States","date":"2024-11-15","target":null,"window_end":null,"value":"6600000000","unit":"USD","detail":"US CHIPS Act (NIST CHIPS Program Office); final; Award covers fabs 1 to 3 in Phoenix; up to $5 billion in loans also offered","quote":"up to $6.6 billion in direct funding under the CHIPS Incentives Program’s Funding Opportunity for Commercial Fabrication Facilities.","source_url":"https://www.nist.gov/news-events/news/2024/11/biden-harris-administration-announces-chips-incentives-award-tsmc-arizona","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"tsmc-arizona-fab-2","owner":"TSMC","plant":"TSMC Arizona second fab","country":"United States","date":"2024-11-15","target":"2027-H2","window_end":"2027-12-31","value":null,"unit":null,"detail":"production (production)","quote":"Fab 2 : Expected to begin production in second half of 2027","source_url":"https://www.nist.gov/chips/tsmc-arizona-phoenix","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"tsmc-arizona-fab-2","owner":"TSMC","plant":"TSMC Arizona second fab","country":"United States","date":"2024-11-15","target":null,"window_end":null,"value":"6600000000","unit":"USD","detail":"US CHIPS Act (NIST CHIPS Program Office); final; Same award as fab 1; covers fabs 1 to 3","quote":"up to $6.6 billion in direct funding under the CHIPS Incentives Program’s Funding Opportunity for Commercial Fabrication Facilities.","source_url":"https://www.nist.gov/news-events/news/2024/11/biden-harris-administration-announces-chips-incentives-award-tsmc-arizona","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"tsmc-arizona-fab-3","owner":"TSMC","plant":"TSMC Arizona third fab","country":"United States","date":"2024-11-15","target":"by 2030 (end of the decade)","window_end":"2030-12-31","value":null,"unit":null,"detail":"production (production)","quote":"Fab 3 : Expected to begin production by the end of the decade","source_url":"https://www.nist.gov/chips/tsmc-arizona-phoenix","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"tsmc-arizona-fab-3","owner":"TSMC","plant":"TSMC Arizona third fab","country":"United States","date":"2024-11-15","target":null,"window_end":null,"value":"6600000000","unit":"USD","detail":"US CHIPS Act (NIST CHIPS Program Office); final; Same award as fab 1; covers fabs 1 to 3","quote":"up to $6.6 billion in direct funding under the CHIPS Incentives Program’s Funding Opportunity for Commercial Fabrication Facilities.","source_url":"https://www.nist.gov/news-events/news/2024/11/biden-harris-administration-announces-chips-incentives-award-tsmc-arizona","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"tsmc-jasm-fab-1","owner":"TSMC (JASM; minority owners Sony Semiconductor Solutions, DENSO, Toyota)","plant":"JASM first fab (Kumamoto)","country":"Japan","date":"2022-06-17","target":"2024-12","window_end":"2024-12-31","value":null,"unit":null,"detail":"first shipment (production)","quote":"・生産能力：5.5 万枚/月（12 インチ換算）","source_url":"https://www.meti.go.jp/policy/mono_info_service/joho/laws/semiconductor/semiconductor_plan/nintei_tokuteihandoutai_keikaku_01.pdf","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"tsmc-jasm-fab-1","owner":"TSMC (JASM; minority owners Sony Semiconductor Solutions, DENSO, Toyota)","plant":"JASM first fab (Kumamoto)","country":"Japan","date":"2022-06-17","target":null,"window_end":null,"value":"409500000000","unit":"JPY","detail":"Japan METI (5G Promotion Act, specific semiconductor plan subsidy); final","quote":"※最大助成額は4095億円","source_url":"https://www.meti.go.jp/policy/mono_info_service/joho/laws/semiconductor/semiconductor_plan.html","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"capacity","plant_id":"tsmc-jasm-fab-1","owner":"TSMC (JASM; minority owners Sony Semiconductor Solutions, DENSO, Toyota)","plant":"JASM first fab (Kumamoto)","country":"Japan","date":null,"target":null,"window_end":null,"value":"45000","unit":"wafers a month","detail":"METI amended plan (2026-10-16): 45,000 for 22/28nm, 50,000 for the whole plant. TSMC stated 45,000 in 2021; METI stated 55,000 in 2022.","quote":"・生産能力：4.5 万枚/月（12 インチ換算）※工場全体では 5.0 万枚/月（12 インチ換算）","source_url":"https://www.meti.go.jp/policy/mono_info_service/joho/laws/semiconductor/semiconductor_plan/nintei_tokuteihandoutai_keikaku_01-2.pdf","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"tsmc-jasm-fab-2","owner":"TSMC (JASM; minority owners Sony Semiconductor Solutions, DENSO, Toyota)","plant":"JASM second fab (Kumamoto)","country":"Japan","date":"2024-02-24","target":"2027-Q4","window_end":"2027-12-31","value":null,"unit":null,"detail":"first shipment (production)","quote":"・生産能力：4.8 万枚/月（12 インチ換算） ※工場全体では 6.3 万枚/月（12 インチ換算）","source_url":"https://www.meti.go.jp/policy/mono_info_service/joho/laws/semiconductor/semiconductor_plan/nintei_tokuteihandoutai_keikaku06.pdf","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"tsmc-jasm-fab-2","owner":"TSMC (JASM; minority owners Sony Semiconductor Solutions, DENSO, Toyota)","plant":"JASM second fab (Kumamoto)","country":"Japan","date":"2026-10-16","target":"2028-Q4","window_end":"2028-12-31","value":null,"unit":null,"detail":"first shipment (production)","quote":"・主要製品：ロジック半導体（3nm プロセス）","source_url":"https://www.meti.go.jp/policy/mono_info_service/joho/laws/semiconductor/semiconductor_plan/nintei_tokuteihandoutai_keikaku06-2.pdf","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"tsmc-jasm-fab-2","owner":"TSMC (JASM; minority owners Sony Semiconductor Solutions, DENSO, Toyota)","plant":"JASM second fab (Kumamoto)","country":"Japan","date":"2024-02-24","target":null,"window_end":null,"value":"645150000000","unit":"JPY","detail":"Japan METI (5G Promotion Act, specific semiconductor plan subsidy); final","quote":"※最大助成額は6451.5億円","source_url":"https://www.meti.go.jp/policy/mono_info_service/joho/laws/semiconductor/semiconductor_plan.html","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"capacity","plant_id":"tsmc-jasm-fab-2","owner":"TSMC (JASM; minority owners Sony Semiconductor Solutions, DENSO, Toyota)","plant":"JASM second fab (Kumamoto)","country":"Japan","date":null,"target":null,"window_end":null,"value":"6000","unit":"wafers a month","detail":"METI amended plan (2026-10-16) for 3nm. The 2024 METI plan said 48,000 per month.","quote":"・主要製品：ロジック半導体（3nm プロセス）","source_url":"https://www.meti.go.jp/policy/mono_info_service/joho/laws/semiconductor/semiconductor_plan/nintei_tokuteihandoutai_keikaku06-2.pdf","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"announced","plant_id":"intel-arizona-fab-52","owner":"Intel","plant":"Fab 52 (Ocotillo campus)","country":"United States","date":"2021-03-23","target":null,"window_end":null,"value":null,"unit":null,"detail":null,"quote":"This build-out represents an investment of approximately $20 billion,","source_url":"https://www.intc.com/news-events/press-releases/detail/1452/intel-announces-major-expansion-in-arizona","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"intel-arizona-fab-52","owner":"Intel","plant":"Fab 52 (Ocotillo campus)","country":"United States","date":"2021-09-24","target":"2024","window_end":"2024-12-31","value":null,"unit":null,"detail":"fully operational (production)","quote":"With the addition of the two new factories – to be named Fab 52 and Fab 62","source_url":"https://www.intc.com/news-events/press-releases/detail/1501/intel-breaks-ground-on-two-new-leading-edge-chip-factories","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"intel-arizona-fab-52","owner":"Intel","plant":"Fab 52 (Ocotillo campus)","country":"United States","date":"2024-11-26","target":null,"window_end":null,"value":"3940000000","unit":"USD","detail":"US CHIPS Act (NIST CHIPS Program Office); final; Chandler share of the $7.865 billion Intel award (2 new fabs and 1 modernized fab)","quote":"Construction of 2 new leading-edge fabs and modernization of 1 existing fab","source_url":"https://www.nist.gov/chips/intel-corporation-arizona-chandler","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"intel-arizona-fab-52","owner":"Intel","plant":"Fab 52 (Ocotillo campus)","country":"United States","date":"2025-08-22","target":null,"window_end":null,"value":"5700000000","unit":"USD","detail":"US CHIPS Act grant converted to U.S. government equity; disbursed; Company-wide: unpaid CHIPS grants used to fund the government equity stake; not specific to this fab","quote":"The government’s equity stake will be funded by the remaining $5.7 billion in grants previously awarded,","source_url":"https://www.intc.com/news-events/press-releases/detail/1748/intel-and-trump-administration-reach-historic-agreement-to","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"investment","plant_id":"intel-arizona-fab-52","owner":"Intel","plant":"Fab 52 (Ocotillo campus)","country":"United States","date":null,"target":null,"window_end":null,"value":"20000000000","unit":"USD","detail":"Fab 52 and Fab 62 together","quote":"This build-out represents an investment of approximately $20 billion,","source_url":"https://www.intc.com/news-events/press-releases/detail/1452/intel-announces-major-expansion-in-arizona","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"started","plant_id":"intel-arizona-fab-52","owner":"Intel","plant":"Fab 52 (Ocotillo campus)","country":"United States","date":"2025-10-09","target":null,"window_end":"2025-10-09","value":null,"unit":null,"detail":"Intel said Fab 52 is fully operational and set to reach high-volume production later in 2025; in January 2026 it said 18A ramped to high-volume manufacturing in Arizona.","quote":"Arizona’s Fab 52 is fully operational and set to reach high-volume production using Intel 18A later this year,","source_url":"https://www.intc.com/news-events/press-releases/detail/1752/intel-unveils-panther-lake-architecture-first-ai-pc","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"status","plant_id":"intel-arizona-fab-52","owner":"Intel","plant":"Fab 52 (Ocotillo campus)","country":"United States","date":"2026-01-22","target":null,"window_end":null,"value":"ramping/production","unit":null,"detail":null,"quote":"Intel 18A ramped to high-volume manufacturing in Arizona and Oregon,","source_url":"https://www.intc.com/news-events/press-releases/detail/1759/intel-reports-fourth-quarter-and-full-year-2025-financial","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"announced","plant_id":"intel-arizona-fab-62","owner":"Intel","plant":"Fab 62 (Ocotillo campus)","country":"United States","date":"2021-03-23","target":null,"window_end":null,"value":null,"unit":null,"detail":null,"quote":"This build-out represents an investment of approximately $20 billion,","source_url":"https://www.intc.com/news-events/press-releases/detail/1452/intel-announces-major-expansion-in-arizona","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"intel-arizona-fab-62","owner":"Intel","plant":"Fab 62 (Ocotillo campus)","country":"United States","date":"2021-09-24","target":"2024","window_end":"2024-12-31","value":null,"unit":null,"detail":"fully operational (production)","quote":"With the addition of the two new factories – to be named Fab 52 and Fab 62","source_url":"https://www.intc.com/news-events/press-releases/detail/1501/intel-breaks-ground-on-two-new-leading-edge-chip-factories","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"intel-arizona-fab-62","owner":"Intel","plant":"Fab 62 (Ocotillo campus)","country":"United States","date":"2024-11-26","target":null,"window_end":null,"value":"3940000000","unit":"USD","detail":"US CHIPS Act (NIST CHIPS Program Office); final; Same Chandler award as Fab 52","quote":"Construction of 2 new leading-edge fabs and modernization of 1 existing fab","source_url":"https://www.nist.gov/chips/intel-corporation-arizona-chandler","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"investment","plant_id":"intel-arizona-fab-62","owner":"Intel","plant":"Fab 62 (Ocotillo campus)","country":"United States","date":null,"target":null,"window_end":null,"value":"20000000000","unit":"USD","detail":"Fab 52 and Fab 62 together","quote":"This build-out represents an investment of approximately $20 billion,","source_url":"https://www.intc.com/news-events/press-releases/detail/1452/intel-announces-major-expansion-in-arizona","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"announced","plant_id":"intel-ohio-one","owner":"Intel","plant":"Ohio One (Mod 1 and Mod 2)","country":"United States","date":"2022-01-21","target":null,"window_end":null,"value":null,"unit":null,"detail":null,"quote":"Intel today announced plans for an initial investment of more than $20 billion","source_url":"https://www.intc.com/news-events/press-releases/detail/1521/intel-announces-next-us-site-with-landmark-investment-in","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"intel-ohio-one","owner":"Intel","plant":"Ohio One (Mod 1 and Mod 2)","country":"United States","date":"2022-01-21","target":"2025","window_end":"2025-12-31","value":null,"unit":null,"detail":"production (production)","quote":"Intel today announced plans for an initial investment of more than $20 billion","source_url":"https://www.intc.com/news-events/press-releases/detail/1521/intel-announces-next-us-site-with-landmark-investment-in","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"intel-ohio-one","owner":"Intel","plant":"Ohio One (Mod 1 and Mod 2)","country":"United States","date":"2024-11-26","target":null,"window_end":null,"value":"1500000000","unit":"USD","detail":"US CHIPS Act (NIST CHIPS Program Office); final; New Albany share of the $7.865 billion Intel award","quote":"Construction of one greenfield leading-edge fab (with one additional fab being built)","source_url":"https://www.nist.gov/chips/intel-corporation-ohio-new-albany","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"status","plant_id":"intel-ohio-one","owner":"Intel","plant":"Ohio One (Mod 1 and Mod 2)","country":"United States","date":"2025-07-24","target":null,"window_end":null,"value":"paused/delayed","unit":null,"detail":null,"quote":"Intel will further slow the pace of construction in Ohio to ensure spending is aligned with market demand.","source_url":"https://www.intc.com/news-events/press-releases/detail/1745/intel-reports-second-quarter-2025-financial-results","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"announced","plant_id":"intel-magdeburg","owner":"Intel","plant":"Magdeburg leading-edge wafer fabrication site","country":"Germany","date":"2022-03-15","target":null,"window_end":null,"value":null,"unit":null,"detail":null,"quote":"Intel plans to initially invest 17 billion euros,","source_url":"https://www.intc.com/news-events/press-releases/detail/1532/intel-announces-initial-investment-of-more-than-33","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"intel-magdeburg","owner":"Intel","plant":"Magdeburg leading-edge wafer fabrication site","country":"Germany","date":"2022-03-15","target":"2027","window_end":"2027-12-31","value":null,"unit":null,"detail":"production (production)","quote":"Intel plans to initially invest 17 billion euros,","source_url":"https://www.intc.com/news-events/press-releases/detail/1532/intel-announces-initial-investment-of-more-than-33","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"intel-magdeburg","owner":"Intel","plant":"Magdeburg leading-edge wafer fabrication site","country":"Germany","date":"2023-06-19","target":"4 to 5 years after EU approval of the incentive package","window_end":null,"value":null,"unit":null,"detail":"first facility enters production (production)","quote":"now expected to be more than 30 billion euros for two first-of-a-kind semiconductor facilities","source_url":"https://www.intc.com/news-events/press-releases/detail/1628/intel-german-government-agree-on-increased-scope-for-wafer","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"investment","plant_id":"intel-magdeburg","owner":"Intel","plant":"Magdeburg leading-edge wafer fabrication site","country":"Germany","date":null,"target":null,"window_end":null,"value":"30000000000","unit":"EUR","detail":"Two fabs, per the revised 2023 agreement; first stated as 17 billion euros in 2022","quote":"now expected to be more than 30 billion euros for two first-of-a-kind semiconductor facilities","source_url":"https://www.intc.com/news-events/press-releases/detail/1628/intel-german-government-agree-on-increased-scope-for-wafer","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"status","plant_id":"intel-magdeburg","owner":"Intel","plant":"Magdeburg leading-edge wafer fabrication site","country":"Germany","date":"2025-07-24","target":null,"window_end":null,"value":"cancelled","unit":null,"detail":null,"quote":"Intel will no longer move forward with planned projects in Germany and Poland.","source_url":"https://www.intc.com/news-events/press-releases/detail/1745/intel-reports-second-quarter-2025-financial-results","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"announced","plant_id":"intel-ireland-fab-34","owner":"Intel","plant":"Fab 34","country":"Ireland","date":"2022-03-15","target":null,"window_end":null,"value":null,"unit":null,"detail":null,"quote":"Fab 34, set to go online in 2023","source_url":"https://www.intc.com/news-events/press-releases/detail/1532/intel-announces-initial-investment-of-more-than-33","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"intel-ireland-fab-34","owner":"Intel","plant":"Fab 34","country":"Ireland","date":"2022-03-15","target":"2023","window_end":"2023-12-31","value":null,"unit":null,"detail":"go online (production)","quote":"Fab 34, set to go online in 2023","source_url":"https://www.intc.com/news-events/press-releases/detail/1532/intel-announces-initial-investment-of-more-than-33","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"started","plant_id":"intel-ireland-fab-34","owner":"Intel","plant":"Fab 34","country":"Ireland","date":"2023-09-29","target":null,"window_end":"2023-09-29","value":null,"unit":null,"detail":null,"quote":"Intel’s Fab 34 production milestone","source_url":"https://www.intc.com/news-events/press-releases/detail/1652/intels-new-fab-in-ireland-begins-high-volume-production","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"status","plant_id":"intel-ireland-fab-34","owner":"Intel","plant":"Fab 34","country":"Ireland","date":"2026-04-01","target":null,"window_end":null,"value":"ramping/production","unit":null,"detail":null,"quote":"Fab 34 is a high-volume semiconductor fabrication facility for products utilizing the Intel 4 and Intel 3 process technologies,","source_url":"https://www.intc.com/news-events/press-releases/detail/1764/intel-to-repurchase-49-equity-interest-in-ireland-fab","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"announced","plant_id":"samsung-taylor-fab-1","owner":"Samsung Electronics","plant":"Taylor fab (first fab)","country":"United States","date":"2021-11-24","target":null,"window_end":null,"value":null,"unit":null,"detail":null,"quote":"The estimated $17 billion investment in the United States","source_url":"https://news.samsung.com/global/samsung-electronics-announces-new-advanced-semiconductor-fab-site-in-taylor-texas","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"samsung-taylor-fab-1","owner":"Samsung Electronics","plant":"Taylor fab (first fab)","country":"United States","date":"2021-11-24","target":"2024-H2","window_end":"2024-12-31","value":null,"unit":null,"detail":"facility operational (production)","quote":"The estimated $17 billion investment in the United States","source_url":"https://news.samsung.com/global/samsung-electronics-announces-new-advanced-semiconductor-fab-site-in-taylor-texas","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"samsung-taylor-fab-1","owner":"Samsung Electronics","plant":"Taylor fab (first fab)","country":"United States","date":"2023-06-28","target":"2024-H2","window_end":"2024-12-31","value":null,"unit":null,"detail":"begin operation (production)","quote":"Construction of the new fab in Taylor is proceeding according to initial plans","source_url":"https://news.samsung.com/global/samsung-electronics-unveils-foundry-vision-in-the-ai-era-at-samsung-foundry-forum-2023","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"samsung-taylor-fab-1","owner":"Samsung Electronics","plant":"Taylor fab (first fab)","country":"United States","date":"2024-12-20","target":"by 2030","window_end":"2030-12-31","value":null,"unit":null,"detail":"all facilities operational (whole CHIPS project) (production)","quote":"two leading-edge logic foundry fabs focused on mass production of 2nm process technologies","source_url":"https://www.nist.gov/chips/samsung-electronics-texas-taylor","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"samsung-taylor-fab-1","owner":"Samsung Electronics","plant":"Taylor fab (first fab)","country":"United States","date":"2025-10-30","target":"2026","window_end":"2026-12-31","value":null,"unit":null,"detail":"begin operations (production)","quote":"beginning operations at the Company’s fab in Taylor, Texas in a timely manner.","source_url":"https://news.samsung.com/global/samsung-electronics-announces-third-quarter-2025-results","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"samsung-taylor-fab-1","owner":"Samsung Electronics","plant":"Taylor fab (first fab)","country":"United States","date":"2024-12-20","target":null,"window_end":null,"value":"4745000000","unit":"USD","detail":"US CHIPS Act (NIST CHIPS Program Office); final; Award covers Taylor (2 leading-edge fabs and an R&D fab) and the Austin expansion","quote":"awarded Samsung Electronics (Samsung) up to $4.745 billion in direct funding","source_url":"https://www.nist.gov/news-events/news/2024/12/biden-harris-administration-announces-chips-incentives-award-samsung","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"investment","plant_id":"samsung-taylor-fab-1","owner":"Samsung Electronics","plant":"Taylor fab (first fab)","country":"United States","date":null,"target":null,"window_end":null,"value":"17000000000","unit":"USD","detail":"Buildings, property improvements, machinery and equipment, as stated in 2021","quote":"The estimated $17 billion investment in the United States","source_url":"https://news.samsung.com/global/samsung-electronics-announces-new-advanced-semiconductor-fab-site-in-taylor-texas","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"status","plant_id":"samsung-taylor-fab-1","owner":"Samsung Electronics","plant":"Taylor fab (first fab)","country":"United States","date":"2025-10-30","target":null,"window_end":null,"value":"under construction","unit":null,"detail":null,"quote":"beginning operations at the Company’s fab in Taylor, Texas in a timely manner.","source_url":"https://news.samsung.com/global/samsung-electronics-announces-third-quarter-2025-results","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"announced","plant_id":"samsung-taylor-fab-2","owner":"Samsung Electronics","plant":"Taylor second fab","country":"United States","date":"2026-07-30","target":null,"window_end":null,"value":null,"unit":null,"detail":null,"quote":"second Taylor fab by the end of this year, targeting mass production in 2030.","source_url":"https://www.koreatimes.co.kr/business/techscience/20260730/samsung-electronics-to-break-ground-on-2nd-fab-in-taylor-within-this-year","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"samsung-taylor-fab-2","owner":"Samsung Electronics","plant":"Taylor second fab","country":"United States","date":"2026-07-30","target":"2030","window_end":"2030-12-31","value":null,"unit":null,"detail":"mass production (production)","quote":"second Taylor fab by the end of this year, targeting mass production in 2030.","source_url":"https://www.koreatimes.co.kr/business/techscience/20260730/samsung-electronics-to-break-ground-on-2nd-fab-in-taylor-within-this-year","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"samsung-taylor-fab-2","owner":"Samsung Electronics","plant":"Taylor second fab","country":"United States","date":"2024-12-20","target":null,"window_end":null,"value":"4745000000","unit":"USD","detail":"US CHIPS Act (NIST CHIPS Program Office); final; Same award as Taylor fab 1; the award page names two leading-edge fabs","quote":"awarded Samsung Electronics (Samsung) up to $4.745 billion in direct funding","source_url":"https://www.nist.gov/news-events/news/2024/12/biden-harris-administration-announces-chips-incentives-award-samsung","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"status","plant_id":"samsung-taylor-fab-2","owner":"Samsung Electronics","plant":"Taylor second fab","country":"United States","date":"2026-07-30","target":null,"window_end":null,"value":"announced","unit":null,"detail":null,"quote":"second Taylor fab by the end of this year, targeting mass production in 2030.","source_url":"https://www.koreatimes.co.kr/business/techscience/20260730/samsung-electronics-to-break-ground-on-2nd-fab-in-taylor-within-this-year","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"announced","plant_id":"samsung-pyeongtaek-p4","owner":"Samsung Electronics","plant":"Pyeongtaek Line 4 (P4)","country":"South Korea","date":"2023-10-31","target":null,"window_end":null,"value":null,"unit":null,"detail":null,"quote":"progressing the P4 framework for mid- to long-term supply.","source_url":"https://news.samsung.com/global/samsung-electronics-announces-third-quarter-2023-results","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"status","plant_id":"samsung-pyeongtaek-p4","owner":"Samsung Electronics","plant":"Pyeongtaek Line 4 (P4)","country":"South Korea","date":"2023-10-31","target":null,"window_end":null,"value":"under construction","unit":null,"detail":null,"quote":"progressing the P4 framework for mid- to long-term supply.","source_url":"https://news.samsung.com/global/samsung-electronics-announces-third-quarter-2023-results","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"announced","plant_id":"samsung-pyeongtaek-p5","owner":"Samsung Electronics","plant":"Pyeongtaek Line 5 (P5)","country":"South Korea","date":"2025-11-16","target":null,"window_end":null,"value":null,"unit":null,"detail":null,"quote":"삼성전자는 최근 임시 경영위원회를 열고 평택사업장 2단지 5라인의 골조 공사를 추진하기로 결정했다.","source_url":"https://news.samsung.com/kr/삼성-국내에-향후-5년간-450조원-투자","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"samsung-pyeongtaek-p5","owner":"Samsung Electronics","plant":"Pyeongtaek Line 5 (P5)","country":"South Korea","date":"2025-11-16","target":"2028","window_end":"2028-12-31","value":null,"unit":null,"detail":"full-scale operation (production)","quote":"삼성전자는 최근 임시 경영위원회를 열고 평택사업장 2단지 5라인의 골조 공사를 추진하기로 결정했다.","source_url":"https://news.samsung.com/kr/삼성-국내에-향후-5년간-450조원-투자","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"status","plant_id":"samsung-pyeongtaek-p5","owner":"Samsung Electronics","plant":"Pyeongtaek Line 5 (P5)","country":"South Korea","date":"2025-11-16","target":null,"window_end":null,"value":"under construction","unit":null,"detail":null,"quote":"삼성전자는 최근 임시 경영위원회를 열고 평택사업장 2단지 5라인의 골조 공사를 추진하기로 결정했다.","source_url":"https://news.samsung.com/kr/삼성-국내에-향후-5년간-450조원-투자","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"announced","plant_id":"skhynix-yongin-y1","owner":"SK hynix","plant":"Yongin Semiconductor Cluster first fab (Y1)","country":"South Korea","date":"2024-07-26","target":null,"window_end":null,"value":null,"unit":null,"detail":null,"quote":"decided to invest about 9.4 trillion won in building the first fab and business facilities","source_url":"https://news.skhynix.com/en/sk-hynix-board-approves-yongin-semiconductor-cluster-plan/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"skhynix-yongin-y1","owner":"SK hynix","plant":"Yongin Semiconductor Cluster first fab (Y1)","country":"South Korea","date":"2024-04-03","target":"2027 (early)","window_end":"2027-12-31","value":null,"unit":null,"detail":"first fab completion (building)","quote":"with plans for completion in early 2027.","source_url":"https://news.skhynix.com/en/sk-hynix-signs-investment-agreement-of-advanced-chip-packaging-with-indiana/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"skhynix-yongin-y1","owner":"SK hynix","plant":"Yongin Semiconductor Cluster first fab (Y1)","country":"South Korea","date":"2024-04-24","target":"2027-05","window_end":"2027-05-31","value":null,"unit":null,"detail":"first fab completion (building)","quote":"start construction of the first fab in Yongin in March next year and complete it in May 2027.","source_url":"https://news.skhynix.com/en/sk-hynix-to-produce-dram-from-m15x-in-cheongju/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"skhynix-yongin-y1","owner":"SK hynix","plant":"Yongin Semiconductor Cluster first fab (Y1)","country":"South Korea","date":"2024-07-26","target":"2027-05","window_end":"2027-05-31","value":null,"unit":null,"detail":"first fab completion (building)","quote":"decided to invest about 9.4 trillion won in building the first fab and business facilities","source_url":"https://news.skhynix.com/en/sk-hynix-board-approves-yongin-semiconductor-cluster-plan/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"skhynix-yongin-y1","owner":"SK hynix","plant":"Yongin Semiconductor Cluster first fab (Y1)","country":"South Korea","date":"2026-02-25","target":"2027-02","window_end":"2027-02-28","value":null,"unit":null,"detail":"first cleanroom opening (moved up from May 2027) (building)","quote":"This brings the total investment for the construction of the first fab to approximately 31 trillion KRW","source_url":"https://news.skhynix.com/en/new-facility-investment-for-yongin-semiconductor-cluster/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"skhynix-yongin-y1","owner":"SK hynix","plant":"Yongin Semiconductor Cluster first fab (Y1)","country":"South Korea","date":"2026-08-07","target":"2027-02","window_end":"2027-02-28","value":null,"unit":null,"detail":"first cleanroom opening (building)","quote":"Meanwhile, construction on Y1 is progressing smoothly toward its initial cleanroom opening target of February next year.","source_url":"https://news.skhynix.com/en/fab-facility-investment-2026/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"investment","plant_id":"skhynix-yongin-y1","owner":"SK hynix","plant":"Yongin Semiconductor Cluster first fab (Y1)","country":"South Korea","date":null,"target":null,"window_end":null,"value":"31000000000000","unit":"KRW","detail":"Total construction of the first fab (9.4 trillion won approved 2024, plus 21.6 trillion won approved 2026)","quote":"This brings the total investment for the construction of the first fab to approximately 31 trillion KRW","source_url":"https://news.skhynix.com/en/new-facility-investment-for-yongin-semiconductor-cluster/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"status","plant_id":"skhynix-yongin-y1","owner":"SK hynix","plant":"Yongin Semiconductor Cluster first fab (Y1)","country":"South Korea","date":"2026-08-07","target":null,"window_end":null,"value":"under construction","unit":null,"detail":null,"quote":"Meanwhile, construction on Y1 is progressing smoothly toward its initial cleanroom opening target of February next year.","source_url":"https://news.skhynix.com/en/fab-facility-investment-2026/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"announced","plant_id":"skhynix-yongin-y2","owner":"SK hynix","plant":"Yongin Semiconductor Cluster second fab (Y2)","country":"South Korea","date":"2026-08-07","target":null,"window_end":null,"value":null,"unit":null,"detail":null,"quote":"35.2 trillion won in Yongin “Y2” fab and 19.1 trillion won in the Cheongju “M17” fab","source_url":"https://news.skhynix.com/en/fab-facility-investment-2026/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"skhynix-yongin-y2","owner":"SK hynix","plant":"Yongin Semiconductor Cluster second fab (Y2)","country":"South Korea","date":"2026-08-07","target":"2029-06","window_end":"2029-06-30","value":null,"unit":null,"detail":"first cleanroom opening (building)","quote":"35.2 trillion won in Yongin “Y2” fab and 19.1 trillion won in the Cheongju “M17” fab","source_url":"https://news.skhynix.com/en/fab-facility-investment-2026/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"investment","plant_id":"skhynix-yongin-y2","owner":"SK hynix","plant":"Yongin Semiconductor Cluster second fab (Y2)","country":"South Korea","date":null,"target":null,"window_end":null,"value":"35200000000000","unit":"KRW","detail":"Y2 fab, support building, R&D center and infrastructure, through October 2031","quote":"35.2 trillion won in Yongin “Y2” fab and 19.1 trillion won in the Cheongju “M17” fab","source_url":"https://news.skhynix.com/en/fab-facility-investment-2026/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"status","plant_id":"skhynix-yongin-y2","owner":"SK hynix","plant":"Yongin Semiconductor Cluster second fab (Y2)","country":"South Korea","date":"2026-08-07","target":null,"window_end":null,"value":"announced","unit":null,"detail":null,"quote":"35.2 trillion won in Yongin “Y2” fab and 19.1 trillion won in the Cheongju “M17” fab","source_url":"https://news.skhynix.com/en/fab-facility-investment-2026/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"announced","plant_id":"skhynix-cheongju-m15x","owner":"SK hynix","plant":"M15X","country":"South Korea","date":"2022-09-06","target":null,"window_end":null,"value":null,"unit":null,"detail":null,"quote":"A total of 15 trillion won will be injected over the next five years to build the fab","source_url":"https://news.skhynix.com/en/sk-hynix-to-build-m15x-fab-in-cheongju-in-october/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"skhynix-cheongju-m15x","owner":"SK hynix","plant":"M15X","country":"South Korea","date":"2022-09-06","target":"2025 (early)","window_end":"2025-12-31","value":null,"unit":null,"detail":"construction completion (building)","quote":"A total of 15 trillion won will be injected over the next five years to build the fab","source_url":"https://news.skhynix.com/en/sk-hynix-to-build-m15x-fab-in-cheongju-in-october/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"skhynix-cheongju-m15x","owner":"SK hynix","plant":"M15X","country":"South Korea","date":"2024-04-24","target":"2025-11","window_end":"2025-11-30","value":null,"unit":null,"detail":"construction completion for early mass production (building)","quote":"the total investment in building the new production base will be more than 20 trillion won","source_url":"https://news.skhynix.com/en/sk-hynix-to-produce-dram-from-m15x-in-cheongju/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"investment","plant_id":"skhynix-cheongju-m15x","owner":"SK hynix","plant":"M15X","country":"South Korea","date":null,"target":null,"window_end":null,"value":"20000000000000","unit":"KRW","detail":"Long-term total for the new production base (5.3 trillion won for fab construction); 15 trillion won over 5 years in the 2022 plan","quote":"the total investment in building the new production base will be more than 20 trillion won","source_url":"https://news.skhynix.com/en/sk-hynix-to-produce-dram-from-m15x-in-cheongju/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"status","plant_id":"skhynix-cheongju-m15x","owner":"SK hynix","plant":"M15X","country":"South Korea","date":"2026-04-22","target":null,"window_end":null,"value":"ramping/production","unit":null,"detail":null,"quote":"focusing on the ramp-up of M15X, infrastructure preparation on the Yongin cluster,","source_url":"https://news.skhynix.com/en/q1-2026-business-results/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"announced","plant_id":"skhynix-cheongju-m17","owner":"SK hynix","plant":"M17","country":"South Korea","date":"2026-07-02","target":null,"window_end":null,"value":null,"unit":null,"detail":null,"quote":"KRW 80 trillion in the M17 NAND production fab","source_url":"https://news.skhynix.com/en/fact-07/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"skhynix-cheongju-m17","owner":"SK hynix","plant":"M17","country":"South Korea","date":"2026-07-02","target":"2029-H1","window_end":"2029-06-30","value":null,"unit":null,"detail":"operations (production)","quote":"KRW 80 trillion in the M17 NAND production fab","source_url":"https://news.skhynix.com/en/fact-07/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"skhynix-cheongju-m17","owner":"SK hynix","plant":"M17","country":"South Korea","date":"2026-08-07","target":"2028-12","window_end":"2028-12-31","value":null,"unit":null,"detail":"first cleanroom opening (building)","quote":"35.2 trillion won in Yongin “Y2” fab and 19.1 trillion won in the Cheongju “M17” fab","source_url":"https://news.skhynix.com/en/fab-facility-investment-2026/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"investment","plant_id":"skhynix-cheongju-m17","owner":"SK hynix","plant":"M17","country":"South Korea","date":null,"target":null,"window_end":null,"value":"19100000000000","unit":"KRW","detail":"M17 fab approved by the board in August 2026; the June 2026 plan said about 80 trillion won for M17 in the long term","quote":"35.2 trillion won in Yongin “Y2” fab and 19.1 trillion won in the Cheongju “M17” fab","source_url":"https://news.skhynix.com/en/fab-facility-investment-2026/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"status","plant_id":"skhynix-cheongju-m17","owner":"SK hynix","plant":"M17","country":"South Korea","date":"2026-08-07","target":null,"window_end":null,"value":"announced","unit":null,"detail":null,"quote":"35.2 trillion won in Yongin “Y2” fab and 19.1 trillion won in the Cheongju “M17” fab","source_url":"https://news.skhynix.com/en/fab-facility-investment-2026/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"announced","plant_id":"skhynix-west-lafayette","owner":"SK hynix","plant":"Indiana fab (HBM advanced packaging and R&D)","country":"United States","date":"2024-04-03","target":null,"window_end":null,"value":null,"unit":null,"detail":null,"quote":"it will invest an estimated $3.87 billion in West Lafayette, Indiana","source_url":"https://news.skhynix.com/en/sk-hynix-signs-investment-agreement-of-advanced-chip-packaging-with-indiana/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"skhynix-west-lafayette","owner":"SK hynix","plant":"Indiana fab (HBM advanced packaging and R&D)","country":"United States","date":"2024-04-03","target":"2028-H2","window_end":"2028-12-31","value":null,"unit":null,"detail":"mass production (production)","quote":"it will invest an estimated $3.87 billion in West Lafayette, Indiana","source_url":"https://news.skhynix.com/en/sk-hynix-signs-investment-agreement-of-advanced-chip-packaging-with-indiana/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"skhynix-west-lafayette","owner":"SK hynix","plant":"Indiana fab (HBM advanced packaging and R&D)","country":"United States","date":"2024-12-19","target":"2028-H2","window_end":"2028-12-31","value":null,"unit":null,"detail":"mass production (production)","quote":"Mass production expected to begin second half of 2028","source_url":"https://www.nist.gov/chips/sk-hynix-indiana-west-lafayette","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"skhynix-west-lafayette","owner":"SK hynix","plant":"Indiana fab (HBM advanced packaging and R&D)","country":"United States","date":"2026-08-28","target":"2029-H2","window_end":"2029-12-31","value":null,"unit":null,"detail":"mass production of next-generation HBM (later product)","quote":"The Indiana fab, with a total expected investment of over $4 billion,","source_url":"https://news.skhynix.com/en/groundbreaking-ceremony-in-indiana/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"skhynix-west-lafayette","owner":"SK hynix","plant":"Indiana fab (HBM advanced packaging and R&D)","country":"United States","date":"2024-08-06","target":null,"window_end":null,"value":"450000000","unit":"USD","detail":"US CHIPS Act (NIST CHIPS Program Office); preliminary","quote":"up to $450 million in proposed direct funding and access to proposed loans of $500 million","source_url":"https://news.skhynix.com/en/preliminary-mou-terms-signed-with-us-doc-for-advanced-packaging-facility-in-indiana/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"skhynix-west-lafayette","owner":"SK hynix","plant":"Indiana fab (HBM advanced packaging and R&D)","country":"United States","date":"2024-12-19","target":null,"window_end":null,"value":"458000000","unit":"USD","detail":"US CHIPS Act (NIST CHIPS Program Office); final","quote":"awarded SK hynix up to $458 million in direct funding","source_url":"https://www.nist.gov/news-events/news/2024/12/biden-harris-administration-announces-chips-incentives-award-sk-hynix","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"investment","plant_id":"skhynix-west-lafayette","owner":"SK hynix","plant":"Indiana fab (HBM advanced packaging and R&D)","country":"United States","date":null,"target":null,"window_end":null,"value":"4000000000","unit":"USD","detail":"Total expected investment (stated in 2026; $3.87 billion in 2024)","quote":"The Indiana fab, with a total expected investment of over $4 billion,","source_url":"https://news.skhynix.com/en/groundbreaking-ceremony-in-indiana/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"status","plant_id":"skhynix-west-lafayette","owner":"SK hynix","plant":"Indiana fab (HBM advanced packaging and R&D)","country":"United States","date":"2026-08-28","target":null,"window_end":null,"value":"under construction","unit":null,"detail":null,"quote":"The Indiana fab, with a total expected investment of over $4 billion,","source_url":"https://news.skhynix.com/en/groundbreaking-ceremony-in-indiana/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"micron-boise-id1","owner":"Micron","plant":"Idaho fab 1 (ID1)","country":"United States","date":"2024-12-10","target":null,"window_end":null,"value":"6165000000","unit":"USD","detail":"US CHIPS Act (NIST CHIPS Program Office); final; Award covers 2 Idaho fabs and 2 New York fabs; $6.165 billion finalized 2024-12-10, raised to about $6.44 billion with Virginia","quote":"awarded Micron Technology up to $6.165 billion in direct funding","source_url":"https://www.nist.gov/news-events/news/2024/12/department-commerce-awards-chips-incentives-micron-idaho-and-new-york","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"micron-boise-id2","owner":"Micron","plant":"Idaho fab 2 (ID2)","country":"United States","date":"2024-12-10","target":null,"window_end":null,"value":"6165000000","unit":"USD","detail":"US CHIPS Act (NIST CHIPS Program Office); final; Award covers 2 Idaho fabs and 2 New York fabs; $6.165 billion finalized 2024-12-10, raised to about $6.44 billion with Virginia","quote":"awarded Micron Technology up to $6.165 billion in direct funding","source_url":"https://www.nist.gov/news-events/news/2024/12/department-commerce-awards-chips-incentives-micron-idaho-and-new-york","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"micron-clay-ny","owner":"Micron","plant":"New York megafab (Clay), fabs 1 and 2","country":"United States","date":"2024-12-10","target":null,"window_end":null,"value":"6165000000","unit":"USD","detail":"US CHIPS Act (NIST CHIPS Program Office); final; Award covers 2 Idaho fabs and 2 New York fabs; $6.165 billion finalized 2024-12-10, raised to about $6.44 billion with Virginia","quote":"awarded Micron Technology up to $6.165 billion in direct funding","source_url":"https://www.nist.gov/news-events/news/2024/12/department-commerce-awards-chips-incentives-micron-idaho-and-new-york","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"micron-hiroshima","owner":"Micron (Micron Memory Japan)","plant":"Hiroshima fab: 1-gamma EUV DRAM and new cleanroom","country":"Japan","date":"2023-10-03","target":"2026-Q2 (Micron fiscal, Dec 2025 to Feb 2026)","window_end":"2026-02-28","value":null,"unit":null,"detail":"first shipment, 1γ (production)","quote":"・主要製品：ＤＲＡＭ（１γ世代）","source_url":"https://www.meti.go.jp/policy/mono_info_service/joho/laws/semiconductor/semiconductor_plan/nintei_tokuteihandoutai_keikaku04.pdf","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"micron-hiroshima","owner":"Micron (Micron Memory Japan)","plant":"Hiroshima fab: 1-gamma EUV DRAM and new cleanroom","country":"Japan","date":"2025-09-12","target":"2028-Q4 (Micron fiscal, Jun to Aug 2028)","window_end":"2028-08-31","value":null,"unit":null,"detail":"first shipment, next-generation DRAM (later product)","quote":"・主要製品：次世代ＤＲＡＭ","source_url":"https://www.meti.go.jp/policy/mono_info_service/joho/laws/semiconductor/semiconductor_plan/nintei_tokuteihandoutai_keikaku07.pdf","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"micron-hiroshima","owner":"Micron (Micron Memory Japan)","plant":"Hiroshima fab: 1-gamma EUV DRAM and new cleanroom","country":"Japan","date":"2026-07-04","target":"2028-H2","window_end":"2028-12-31","value":null,"unit":null,"detail":"equipment move-in for new cleanroom (building)","quote":"広島工場（広島県東広島市）で新たなクリーンルームの着工を発表しました。","source_url":"https://jp.micron.com/about/press/news/micron-breaks-ground-on-hiroshima-cleanroom-to-support-advanced-memory-for-ai","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"micron-hiroshima","owner":"Micron (Micron Memory Japan)","plant":"Hiroshima fab: 1-gamma EUV DRAM and new cleanroom","country":"Japan","date":"2023-10-03","target":null,"window_end":null,"value":"167000000000","unit":"JPY","detail":"Japan METI (5G Promotion Act, specific semiconductor plan subsidy); final","quote":"※最大助成額は1670億円","source_url":"https://www.meti.go.jp/policy/mono_info_service/joho/laws/semiconductor/semiconductor_plan.html","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"micron-hiroshima","owner":"Micron (Micron Memory Japan)","plant":"Hiroshima fab: 1-gamma EUV DRAM and new cleanroom","country":"Japan","date":"2025-09-12","target":null,"window_end":null,"value":"500000000000","unit":"JPY","detail":"Japan METI (5G Promotion Act, specific semiconductor plan subsidy); final","quote":"※最大助成額は1670億円","source_url":"https://www.meti.go.jp/policy/mono_info_service/joho/laws/semiconductor/semiconductor_plan.html","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"capacity","plant_id":"micron-hiroshima","owner":"Micron (Micron Memory Japan)","plant":"Hiroshima fab: 1-gamma EUV DRAM and new cleanroom","country":"Japan","date":null,"target":null,"window_end":null,"value":"40000","unit":"wafers a month","detail":"METI plan for 1γ (2023-10-03). The 2025 METI plan for next-generation DRAM also states 40,000 per month.","quote":"・主要製品：ＤＲＡＭ（１γ世代）","source_url":"https://www.meti.go.jp/policy/mono_info_service/joho/laws/semiconductor/semiconductor_plan/nintei_tokuteihandoutai_keikaku04.pdf","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"status","plant_id":"micron-hiroshima","owner":"Micron (Micron Memory Japan)","plant":"Hiroshima fab: 1-gamma EUV DRAM and new cleanroom","country":"Japan","date":"2026-07-04","target":null,"window_end":null,"value":"under construction","unit":null,"detail":null,"quote":"広島工場（広島県東広島市）で新たなクリーンルームの着工を発表しました。","source_url":"https://jp.micron.com/about/press/news/micron-breaks-ground-on-hiroshima-cleanroom-to-support-advanced-memory-for-ai","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"announced","plant_id":"gf-malta-expansion","owner":"GlobalFoundries","plant":"Malta (Fab 8) expansion and new 300mm fab","country":"United States","date":"2024-02-19","target":null,"window_end":null,"value":null,"unit":null,"detail":null,"quote":"awarded GlobalFoundries (GF) up to $1.5 billion in direct funding","source_url":"https://www.nist.gov/news-events/news/2024/11/biden-harris-administration-announces-chips-incentives-award","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"gf-malta-expansion","owner":"GlobalFoundries","plant":"Malta (Fab 8) expansion and new 300mm fab","country":"United States","date":"2026-10-14","target":"2029","window_end":"2029-12-31","value":null,"unit":null,"detail":"first new fab comes online (production)","quote":"a new 300mm semiconductor fab, which is expected to come online in 2029.","source_url":"https://gf.com/news-and-events/news/globalfoundries-selected-to-operate-two-new-semiconductor-fabs-in-new-york-under-landmark-us-japan-initiative/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"gf-malta-expansion","owner":"GlobalFoundries","plant":"Malta (Fab 8) expansion and new 300mm fab","country":"United States","date":"2024-02-19","target":null,"window_end":null,"value":"1500000000","unit":"USD","detail":"US CHIPS Act (NIST CHIPS Program Office); preliminary; Malta and Burlington projects","quote":"awarded GlobalFoundries (GF) up to $1.5 billion in direct funding","source_url":"https://www.nist.gov/news-events/news/2024/11/biden-harris-administration-announces-chips-incentives-award","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"gf-malta-expansion","owner":"GlobalFoundries","plant":"Malta (Fab 8) expansion and new 300mm fab","country":"United States","date":"2024-11-20","target":null,"window_end":null,"value":"1500000000","unit":"USD","detail":"US CHIPS Act (NIST CHIPS Program Office); final; Malta share is $1.45 billion per the NIST award page","quote":"awarded GlobalFoundries (GF) up to $1.5 billion in direct funding","source_url":"https://www.nist.gov/news-events/news/2024/11/biden-harris-administration-announces-chips-incentives-award","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"gf-malta-expansion","owner":"GlobalFoundries","plant":"Malta (Fab 8) expansion and new 300mm fab","country":"United States","date":"2026-10-14","target":null,"window_end":null,"value":"955000000","unit":"USD","detail":"US CHIPS Act (NIST CHIPS Program Office); final","quote":"amend its existing award and reallocate up to $955 million in incentives","source_url":"https://www.nist.gov/news-events/news/2026/10/department-commerce-announces-agreement-globalfoundries-amend-its-existing","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"investment","plant_id":"gf-malta-expansion","owner":"GlobalFoundries","plant":"Malta (Fab 8) expansion and new 300mm fab","country":"United States","date":null,"target":null,"window_end":null,"value":"16000000000","unit":"USD","detail":"New York and Vermont, includes more than $13 billion of existing expansion plans (2025 statement)","quote":"today announced plans to invest $16 billion to expand its semiconductor manufacturing and advanced packaging capabilities","source_url":"https://gf.com/gf-press-release/globalfoundries-announces-16b-u-s-investment-to-reshore-essential-chip-manufacturing-and-accelerate-ai-growth/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"status","plant_id":"gf-malta-expansion","owner":"GlobalFoundries","plant":"Malta (Fab 8) expansion and new 300mm fab","country":"United States","date":"2026-10-14","target":null,"window_end":null,"value":"announced","unit":null,"detail":null,"quote":"a new 300mm semiconductor fab, which is expected to come online in 2029.","source_url":"https://gf.com/news-and-events/news/globalfoundries-selected-to-operate-two-new-semiconductor-fabs-in-new-york-under-landmark-us-japan-initiative/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"announced","plant_id":"ti-sherman","owner":"Texas Instruments","plant":"Sherman SM1 and SM2 (300mm fabs)","country":"United States","date":"2021-11-17","target":null,"window_end":null,"value":null,"unit":null,"detail":null,"quote":"has selected Sherman as the location for their next 300-mm fabs, with potential of up to four fabs","source_url":"https://gov.texas.gov/news/post/governor-abbott-announces-texas-instruments-potential-30-billion-investment-in-sherman","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"ti-sherman","owner":"Texas Instruments","plant":"Sherman SM1 and SM2 (300mm fabs)","country":"United States","date":"2022-05-18","target":"2025","window_end":"2025-12-31","value":null,"unit":null,"detail":"production from the first Sherman fab (production)","quote":"Production from the first Sherman fab is expected in 2025.","source_url":"https://www.ti.com/about-ti/newsroom/news-releases/2022/2022-05-18-texas-instruments-breaks-ground-on-new-300-mm-semiconductor-wafer-fabrication-plants-in-sherman--texas.html","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"ti-sherman","owner":"Texas Instruments","plant":"Sherman SM1 and SM2 (300mm fabs)","country":"United States","date":"2025-06-18","target":"2025","window_end":"2025-12-31","value":null,"unit":null,"detail":"SM1 initial production (production)","quote":"investment of up to $40 billion dollars for four fabs","source_url":"https://www.ti.com/about-ti/newsroom/news-releases/2025/texas-instruments-plans-to-invest-more-than--60-billion-to-manufacture-billions-of-foundational-semiconductors-in-the-us.html","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"ti-sherman","owner":"Texas Instruments","plant":"Sherman SM1 and SM2 (300mm fabs)","country":"United States","date":"2024-12-20","target":null,"window_end":null,"value":"900000000","unit":"USD","detail":"US CHIPS Act (NIST CHIPS Program Office); final; Sherman share of the $1.61 billion TI award (Sherman and Lehi)","quote":"Construction of two high-volume 300-mm fabrication facilities","source_url":"https://www.nist.gov/chips/texas-instruments-texas-sherman","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"investment","plant_id":"ti-sherman","owner":"Texas Instruments","plant":"Sherman SM1 and SM2 (300mm fabs)","country":"United States","date":null,"target":null,"window_end":null,"value":"40000000000","unit":"USD","detail":"Four fabs SM1 to SM4 (2025 statement); $30 billion for four fabs in 2021-2022","quote":"investment of up to $40 billion dollars for four fabs","source_url":"https://www.ti.com/about-ti/newsroom/news-releases/2025/texas-instruments-plans-to-invest-more-than--60-billion-to-manufacture-billions-of-foundational-semiconductors-in-the-us.html","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"started","plant_id":"ti-sherman","owner":"Texas Instruments","plant":"Sherman SM1 and SM2 (300mm fabs)","country":"United States","date":"2025-12-17","target":null,"window_end":"2025-12-17","value":null,"unit":null,"detail":"SM1 only. SM2 shell is complete; no production date stated.","quote":"Texas Instruments (TI) today announced the start of production at its newest semiconductor fab in Sherman, TX,","source_url":"https://www.ti.com/about-ti/newsroom/news-releases/2025/texas-instruments-begins-production-at-its-newest-300mm-semiconductor-manufacturing-facility-in-sherman-texas.html","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"status","plant_id":"ti-sherman","owner":"Texas Instruments","plant":"Sherman SM1 and SM2 (300mm fabs)","country":"United States","date":"2025-12-17","target":null,"window_end":null,"value":"ramping/production","unit":null,"detail":null,"quote":"Texas Instruments (TI) today announced the start of production at its newest semiconductor fab in Sherman, TX,","source_url":"https://www.ti.com/about-ti/newsroom/news-releases/2025/texas-instruments-begins-production-at-its-newest-300mm-semiconductor-manufacturing-facility-in-sherman-texas.html","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"wolfspeed-mohawk-valley","owner":"Wolfspeed","plant":"Mohawk Valley fab (200mm SiC device fab)","country":"United States","date":"2024-10-15","target":null,"window_end":null,"value":"750000000","unit":"USD","detail":"US CHIPS Act (NIST CHIPS Program Office); preliminary; Split across Siler City and Marcy; NIST lists the stage as PMT","quote":"up to $750 million in proposed direct funding under the CHIPS and Science Act.","source_url":"https://www.nist.gov/chips/wolfspeed-new-york-marcy","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"status","plant_id":"wolfspeed-mohawk-valley","owner":"Wolfspeed","plant":"Mohawk Valley fab (200mm SiC device fab)","country":"United States","date":"2024-06-24","target":null,"window_end":null,"value":"ramping/production","unit":null,"detail":null,"quote":"Wolfspeed’s Mohawk Valley silicon carbide fab has reached 20% wafer start utilization,","source_url":"https://www.wolfspeed.com/company/news-events/news/wolfspeed-announces-key-milestones-and-operational-update/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"announced","plant_id":"wolfspeed-siler-city","owner":"Wolfspeed","plant":"John Palmour Manufacturing Center (SiC materials)","country":"United States","date":"2022-09-09","target":null,"window_end":null,"value":null,"unit":null,"detail":null,"quote":"with an investment of approximately $5 billion over the next eight years in the Town of Siler City.","source_url":"https://www.nccommerce.com/news/press-releases/2022/09/09/governor-cooper-announces-wolfspeed-selects-north-carolina-445-acre-manufacturing-campus","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"wolfspeed-siler-city","owner":"Wolfspeed","plant":"John Palmour Manufacturing Center (SiC materials)","country":"United States","date":"2024-06-24","target":"2024-08 (early)","window_end":"2024-08-31","value":null,"unit":null,"detail":"crystal qualification (production)","quote":"has installed and recently activated initial furnaces less than one year after vertical construction commenced.","source_url":"https://www.wolfspeed.com/company/news-events/news/wolfspeed-announces-key-milestones-and-operational-update/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"wolfspeed-siler-city","owner":"Wolfspeed","plant":"John Palmour Manufacturing Center (SiC materials)","country":"United States","date":"2024-10-15","target":null,"window_end":null,"value":"750000000","unit":"USD","detail":"US CHIPS Act (NIST CHIPS Program Office); preliminary; Split across Siler City and Marcy; NIST lists the stage as PMT","quote":"up to $750 million in proposed direct funding under the CHIPS and Science Act.","source_url":"https://www.nist.gov/chips/wolfspeed-north-carolina-siler-city","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"investment","plant_id":"wolfspeed-siler-city","owner":"Wolfspeed","plant":"John Palmour Manufacturing Center (SiC materials)","country":"United States","date":null,"target":null,"window_end":null,"value":"5000000000","unit":"USD","detail":"Over eight years, as stated by the North Carolina Department of Commerce (2022)","quote":"with an investment of approximately $5 billion over the next eight years in the Town of Siler City.","source_url":"https://www.nccommerce.com/news/press-releases/2022/09/09/governor-cooper-announces-wolfspeed-selects-north-carolina-445-acre-manufacturing-campus","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"status","plant_id":"wolfspeed-siler-city","owner":"Wolfspeed","plant":"John Palmour Manufacturing Center (SiC materials)","country":"United States","date":"2024-06-24","target":null,"window_end":null,"value":"ramping/production","unit":null,"detail":null,"quote":"has installed and recently activated initial furnaces less than one year after vertical construction commenced.","source_url":"https://www.wolfspeed.com/company/news-events/news/wolfspeed-announces-key-milestones-and-operational-update/","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"announced","plant_id":"amkor-peoria","owner":"Amkor Technology","plant":"Arizona advanced packaging and test campus","country":"United States","date":"2024-07-26","target":null,"window_end":null,"value":null,"unit":null,"detail":null,"quote":"awarded Amkor Technology Arizona, Inc., a subsidiary of Amkor Technology, Inc., up to $407 million in direct funding","source_url":"https://www.nist.gov/news-events/news/2024/12/biden-harris-administration-announces-chips-incentives-award-amkor","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"amkor-peoria","owner":"Amkor Technology","plant":"Arizona advanced packaging and test campus","country":"United States","date":"2024-12-20","target":"2027-Q4","window_end":"2027-12-31","value":null,"unit":null,"detail":"mass production (production)","quote":"expected to produce approximately 14,500 wafers per month and 3,700,000 units per month","source_url":"https://www.nist.gov/chips/amkor-technology-inc-arizona-peoria","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"amkor-peoria","owner":"Amkor Technology","plant":"Arizona advanced packaging and test campus","country":"United States","date":"2025-10-06","target":"2028 (early)","window_end":"2028-12-31","value":null,"unit":null,"detail":"production (production)","quote":"increasing total project investment by more than $5 billion , to a total of $7 billion across two phases","source_url":"https://www.nasdaq.com/press-release/amkor-technology-breaks-ground-new-semiconductor-advanced-packaging-and-test-campus","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"amkor-peoria","owner":"Amkor Technology","plant":"Arizona advanced packaging and test campus","country":"United States","date":"2024-07-26","target":null,"window_end":null,"value":"407000000","unit":"USD","detail":"US CHIPS Act (NIST CHIPS Program Office); preliminary","quote":"awarded Amkor Technology Arizona, Inc., a subsidiary of Amkor Technology, Inc., up to $407 million in direct funding","source_url":"https://www.nist.gov/news-events/news/2024/12/biden-harris-administration-announces-chips-incentives-award-amkor","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"amkor-peoria","owner":"Amkor Technology","plant":"Arizona advanced packaging and test campus","country":"United States","date":"2024-12-20","target":null,"window_end":null,"value":"407000000","unit":"USD","detail":"US CHIPS Act (NIST CHIPS Program Office); final","quote":"awarded Amkor Technology Arizona, Inc., a subsidiary of Amkor Technology, Inc., up to $407 million in direct funding","source_url":"https://www.nist.gov/news-events/news/2024/12/biden-harris-administration-announces-chips-incentives-award-amkor","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"capacity","plant_id":"amkor-peoria","owner":"Amkor Technology","plant":"Arizona advanced packaging and test campus","country":"United States","date":null,"target":null,"window_end":null,"value":"14500","unit":"wafers a month","detail":"Stated by the U.S. Department of Commerce award page, not by Amkor.","quote":"expected to produce approximately 14,500 wafers per month and 3,700,000 units per month","source_url":"https://www.nist.gov/chips/amkor-technology-inc-arizona-peoria","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"investment","plant_id":"amkor-peoria","owner":"Amkor Technology","plant":"Arizona advanced packaging and test campus","country":"United States","date":null,"target":null,"window_end":null,"value":"7000000000","unit":"USD","detail":"Two phases (2025 statement); $1.7 billion expected capital expenditure on the CHIPS award page","quote":"increasing total project investment by more than $5 billion , to a total of $7 billion across two phases","source_url":"https://www.nasdaq.com/press-release/amkor-technology-breaks-ground-new-semiconductor-advanced-packaging-and-test-campus","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"status","plant_id":"amkor-peoria","owner":"Amkor Technology","plant":"Arizona advanced packaging and test campus","country":"United States","date":"2025-10-06","target":null,"window_end":null,"value":"under construction","unit":null,"detail":null,"quote":"increasing total project investment by more than $5 billion , to a total of $7 billion across two phases","source_url":"https://www.nasdaq.com/press-release/amkor-technology-breaks-ground-new-semiconductor-advanced-packaging-and-test-campus","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"announced","plant_id":"kioxia-kitakami-k2","owner":"Kioxia (joint venture with Sandisk)","plant":"Kitakami Plant Fab2 (K2)","country":"Japan","date":"2022-03-23","target":null,"window_end":null,"value":null,"unit":null,"detail":null,"quote":"it will begin construction of a state-of-the-art new fabrication facility (Fab2) at its Kitakami Plant","source_url":"https://www.kioxia.com/en-jp/about/news/2022/20220323-1.html","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"kioxia-kitakami-k2","owner":"Kioxia (joint venture with Sandisk)","plant":"Kitakami Plant Fab2 (K2)","country":"Japan","date":"2022-03-23","target":"2023","window_end":"2023-12-31","value":null,"unit":null,"detail":"construction completion (building)","quote":"it will begin construction of a state-of-the-art new fabrication facility (Fab2) at its Kitakami Plant","source_url":"https://www.kioxia.com/en-jp/about/news/2022/20220323-1.html","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"promise","plant_id":"kioxia-kitakami-k2","owner":"Kioxia (joint venture with Sandisk)","plant":"Kitakami Plant Fab2 (K2)","country":"Japan","date":"2024-02-06","target":"2025-09","window_end":"2025-09-30","value":null,"unit":null,"detail":"first shipment (Kitakami) (production)","quote":"・生産能力：２．５万枚/月（１２インチ換算）","source_url":"https://www.meti.go.jp/policy/mono_info_service/joho/laws/semiconductor/semiconductor_plan/nintei_tokuteihandoutai_keikaku05.pdf","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"public_money","plant_id":"kioxia-kitakami-k2","owner":"Kioxia (joint venture with Sandisk)","plant":"Kitakami Plant Fab2 (K2)","country":"Japan","date":"2024-02-06","target":null,"window_end":null,"value":"150000000000","unit":"JPY","detail":"Japan METI (5G Promotion Act, specific semiconductor plan subsidy); final; Yokkaichi and Kitakami together","quote":"have been approved to receive an up to 150 billion yen subsidy,","source_url":"https://www.kioxia.com/en-jp/about/news/2024/20240206-1.html","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"capacity","plant_id":"kioxia-kitakami-k2","owner":"Kioxia (joint venture with Sandisk)","plant":"Kitakami Plant Fab2 (K2)","country":"Japan","date":null,"target":null,"window_end":null,"value":"25000","unit":"wafers a month","detail":"METI plan: 25,000 per month at Kitakami for the subsidized 8th-generation line.","quote":"・生産能力：２．５万枚/月（１２インチ換算）","source_url":"https://www.meti.go.jp/policy/mono_info_service/joho/laws/semiconductor/semiconductor_plan/nintei_tokuteihandoutai_keikaku05.pdf","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"started","plant_id":"kioxia-kitakami-k2","owner":"Kioxia (joint venture with Sandisk)","plant":"Kitakami Plant Fab2 (K2)","country":"Japan","date":"2025-09-29","target":null,"window_end":"2025-09-29","value":null,"unit":null,"detail":"Start of operation announced.","quote":"today announced the start of operation at the Fab2 (K2),","source_url":"https://www.kioxia.com/en-jp/about/news/2025/20250930-1.html","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"},{"field":"status","plant_id":"kioxia-kitakami-k2","owner":"Kioxia (joint venture with Sandisk)","plant":"Kitakami Plant Fab2 (K2)","country":"Japan","date":"2025-09-29","target":null,"window_end":null,"value":"ramping/production","unit":null,"detail":null,"quote":"today announced the start of operation at the Fab2 (K2),","source_url":"https://www.kioxia.com/en-jp/about/news/2025/20250930-1.html","license":"quoted for comment","page":"https://jesseahawkins.com/chips/fabs/"}]}
