{"title":"PJM capacity price by zone","page":"https://jesseahawkins.com/power/capacity/","csv":"https://jesseahawkins.com/power/capacity.csv","terms":["figures cited from its reports"],"checked":"2026-10-16","nextCheckBy":"2027-01-14","fields":[{"name":"zone","type":"string"},{"name":"name","type":"string"},{"name":"part","type":"string"},{"name":"states","type":"string"},{"name":"delivery_year","type":"string"},{"name":"start","type":"string"},{"name":"end","type":"string"},{"name":"priced_as","type":"string"},{"name":"price_usd_per_mw_day","type":"number"},{"name":"fpr","type":"number"},{"name":"days","type":"number"},{"name":"usd_per_kw_month","type":"number"},{"name":"report","type":"string"},{"name":"report_page","type":"number"},{"name":"page","type":"string"},{"name":"source","type":"string"},{"name":"license","type":"string"}],"rowCount":110,"rows":[{"zone":"RTO","name":"All of PJM","part":null,"states":null,"delivery_year":"2024/25","start":"2024-06-01","end":"2025-05-31","priced_as":"RTO","price_usd_per_mw_day":28.92,"fpr":1.0894,"days":365,"usd_per_kw_month":0.9583,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2024-2025/2024-2025-base-residual-auction-report.pdf","report_page":8,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"RTO","name":"All of PJM","part":null,"states":null,"delivery_year":"2025/26","start":"2025-06-01","end":"2026-05-31","priced_as":"RTO","price_usd_per_mw_day":269.92,"fpr":0.9387,"days":365,"usd_per_kw_month":7.7068,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"RTO","name":"All of PJM","part":null,"states":null,"delivery_year":"2026/27","start":"2026-06-01","end":"2027-05-31","priced_as":"RTO","price_usd_per_mw_day":329.17,"fpr":0.917,"days":365,"usd_per_kw_month":9.1812,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"RTO","name":"All of PJM","part":null,"states":null,"delivery_year":"2027/28","start":"2027-06-01","end":"2028-05-31","priced_as":"RTO","price_usd_per_mw_day":333.44,"fpr":0.926,"days":366,"usd_per_kw_month":9.4173,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"RTO","name":"All of PJM","part":null,"states":null,"delivery_year":"2028/29","start":"2028-06-01","end":"2029-05-31","priced_as":"RTO","price_usd_per_mw_day":325,"fpr":0.9401,"days":365,"usd_per_kw_month":9.2933,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"AEP","name":"AEP","part":null,"states":"IN KY MI OH TN VA WV","delivery_year":"2024/25","start":"2024-06-01","end":"2025-05-31","priced_as":"RTO","price_usd_per_mw_day":28.92,"fpr":1.0894,"days":365,"usd_per_kw_month":0.9583,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2024-2025/2024-2025-base-residual-auction-report.pdf","report_page":8,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"AEP","name":"AEP","part":null,"states":"IN KY MI OH TN VA WV","delivery_year":"2025/26","start":"2025-06-01","end":"2026-05-31","priced_as":"RTO","price_usd_per_mw_day":269.92,"fpr":0.9387,"days":365,"usd_per_kw_month":7.7068,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"AEP","name":"AEP","part":null,"states":"IN KY MI OH TN VA WV","delivery_year":"2026/27","start":"2026-06-01","end":"2027-05-31","priced_as":"RTO","price_usd_per_mw_day":329.17,"fpr":0.917,"days":365,"usd_per_kw_month":9.1812,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"AEP","name":"AEP","part":null,"states":"IN KY MI OH TN VA WV","delivery_year":"2027/28","start":"2027-06-01","end":"2028-05-31","priced_as":"RTO","price_usd_per_mw_day":333.44,"fpr":0.926,"days":366,"usd_per_kw_month":9.4173,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"AEP","name":"AEP","part":null,"states":"IN KY MI OH TN VA WV","delivery_year":"2028/29","start":"2028-06-01","end":"2029-05-31","priced_as":"RTO","price_usd_per_mw_day":325,"fpr":0.9401,"days":365,"usd_per_kw_month":9.2933,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DAY","name":"AES Ohio","part":null,"states":"OH","delivery_year":"2024/25","start":"2024-06-01","end":"2025-05-31","priced_as":"DAY","price_usd_per_mw_day":28.92,"fpr":1.0894,"days":365,"usd_per_kw_month":0.9583,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2024-2025/2024-2025-base-residual-auction-report.pdf","report_page":8,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DAY","name":"AES Ohio","part":null,"states":"OH","delivery_year":"2025/26","start":"2025-06-01","end":"2026-05-31","priced_as":"DAY","price_usd_per_mw_day":269.92,"fpr":0.9387,"days":365,"usd_per_kw_month":7.7068,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DAY","name":"AES Ohio","part":null,"states":"OH","delivery_year":"2026/27","start":"2026-06-01","end":"2027-05-31","priced_as":"DAY","price_usd_per_mw_day":329.17,"fpr":0.917,"days":365,"usd_per_kw_month":9.1812,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DAY","name":"AES Ohio","part":null,"states":"OH","delivery_year":"2027/28","start":"2027-06-01","end":"2028-05-31","priced_as":"DAY","price_usd_per_mw_day":333.44,"fpr":0.926,"days":366,"usd_per_kw_month":9.4173,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DAY","name":"AES Ohio","part":null,"states":"OH","delivery_year":"2028/29","start":"2028-06-01","end":"2029-05-31","priced_as":"DAY","price_usd_per_mw_day":325,"fpr":0.9401,"days":365,"usd_per_kw_month":9.2933,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"APS","name":"Allegheny Power","part":null,"states":"MD PA WV","delivery_year":"2024/25","start":"2024-06-01","end":"2025-05-31","priced_as":"RTO","price_usd_per_mw_day":28.92,"fpr":1.0894,"days":365,"usd_per_kw_month":0.9583,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2024-2025/2024-2025-base-residual-auction-report.pdf","report_page":8,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"APS","name":"Allegheny Power","part":null,"states":"MD PA WV","delivery_year":"2025/26","start":"2025-06-01","end":"2026-05-31","priced_as":"RTO","price_usd_per_mw_day":269.92,"fpr":0.9387,"days":365,"usd_per_kw_month":7.7068,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"APS","name":"Allegheny Power","part":null,"states":"MD PA WV","delivery_year":"2026/27","start":"2026-06-01","end":"2027-05-31","priced_as":"RTO","price_usd_per_mw_day":329.17,"fpr":0.917,"days":365,"usd_per_kw_month":9.1812,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"APS","name":"Allegheny Power","part":null,"states":"MD PA WV","delivery_year":"2027/28","start":"2027-06-01","end":"2028-05-31","priced_as":"RTO","price_usd_per_mw_day":333.44,"fpr":0.926,"days":366,"usd_per_kw_month":9.4173,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"APS","name":"Allegheny Power","part":null,"states":"MD PA WV","delivery_year":"2028/29","start":"2028-06-01","end":"2029-05-31","priced_as":"RTO","price_usd_per_mw_day":325,"fpr":0.9401,"days":365,"usd_per_kw_month":9.2933,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"AECO","name":"Atlantic City Electric","part":null,"states":"NJ","delivery_year":"2024/25","start":"2024-06-01","end":"2025-05-31","priced_as":"EMAAC","price_usd_per_mw_day":53.6,"fpr":1.0894,"days":365,"usd_per_kw_month":1.7761,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2024-2025/2024-2025-base-residual-auction-report.pdf","report_page":8,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"AECO","name":"Atlantic City Electric","part":null,"states":"NJ","delivery_year":"2025/26","start":"2025-06-01","end":"2026-05-31","priced_as":"EMAAC","price_usd_per_mw_day":269.92,"fpr":0.9387,"days":365,"usd_per_kw_month":7.7068,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"AECO","name":"Atlantic City Electric","part":null,"states":"NJ","delivery_year":"2026/27","start":"2026-06-01","end":"2027-05-31","priced_as":"EMAAC","price_usd_per_mw_day":329.17,"fpr":0.917,"days":365,"usd_per_kw_month":9.1812,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"AECO","name":"Atlantic City Electric","part":null,"states":"NJ","delivery_year":"2027/28","start":"2027-06-01","end":"2028-05-31","priced_as":"EMAAC","price_usd_per_mw_day":333.44,"fpr":0.926,"days":366,"usd_per_kw_month":9.4173,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"AECO","name":"Atlantic City Electric","part":null,"states":"NJ","delivery_year":"2028/29","start":"2028-06-01","end":"2029-05-31","priced_as":"EMAAC","price_usd_per_mw_day":325,"fpr":0.9401,"days":365,"usd_per_kw_month":9.2933,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"BGE","name":"Baltimore Gas and Electric","part":null,"states":"MD","delivery_year":"2024/25","start":"2024-06-01","end":"2025-05-31","priced_as":"BGE","price_usd_per_mw_day":73,"fpr":1.0894,"days":365,"usd_per_kw_month":2.4189,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2024-2025/2024-2025-base-residual-auction-report.pdf","report_page":8,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"BGE","name":"Baltimore Gas and Electric","part":null,"states":"MD","delivery_year":"2025/26","start":"2025-06-01","end":"2026-05-31","priced_as":"BGE","price_usd_per_mw_day":466.35,"fpr":0.9387,"days":365,"usd_per_kw_month":13.3153,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"BGE","name":"Baltimore Gas and Electric","part":null,"states":"MD","delivery_year":"2026/27","start":"2026-06-01","end":"2027-05-31","priced_as":"BGE","price_usd_per_mw_day":329.17,"fpr":0.917,"days":365,"usd_per_kw_month":9.1812,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"BGE","name":"Baltimore Gas and Electric","part":null,"states":"MD","delivery_year":"2027/28","start":"2027-06-01","end":"2028-05-31","priced_as":"BGE","price_usd_per_mw_day":333.44,"fpr":0.926,"days":366,"usd_per_kw_month":9.4173,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"BGE","name":"Baltimore Gas and Electric","part":null,"states":"MD","delivery_year":"2028/29","start":"2028-06-01","end":"2029-05-31","priced_as":"BGE","price_usd_per_mw_day":325,"fpr":0.9401,"days":365,"usd_per_kw_month":9.2933,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"COMED","name":"ComEd","part":null,"states":"IL","delivery_year":"2024/25","start":"2024-06-01","end":"2025-05-31","priced_as":"COMED","price_usd_per_mw_day":28.92,"fpr":1.0894,"days":365,"usd_per_kw_month":0.9583,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2024-2025/2024-2025-base-residual-auction-report.pdf","report_page":8,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"COMED","name":"ComEd","part":null,"states":"IL","delivery_year":"2025/26","start":"2025-06-01","end":"2026-05-31","priced_as":"COMED","price_usd_per_mw_day":269.92,"fpr":0.9387,"days":365,"usd_per_kw_month":7.7068,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"COMED","name":"ComEd","part":null,"states":"IL","delivery_year":"2026/27","start":"2026-06-01","end":"2027-05-31","priced_as":"COMED","price_usd_per_mw_day":329.17,"fpr":0.917,"days":365,"usd_per_kw_month":9.1812,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"COMED","name":"ComEd","part":null,"states":"IL","delivery_year":"2027/28","start":"2027-06-01","end":"2028-05-31","priced_as":"COMED","price_usd_per_mw_day":333.44,"fpr":0.926,"days":366,"usd_per_kw_month":9.4173,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"COMED","name":"ComEd","part":null,"states":"IL","delivery_year":"2028/29","start":"2028-06-01","end":"2029-05-31","priced_as":"COMED","price_usd_per_mw_day":325,"fpr":0.9401,"days":365,"usd_per_kw_month":9.2933,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DPL","name":"Delmarva Power","part":"DPL-SOUTH","states":"DE MD VA","delivery_year":"2024/25","start":"2024-06-01","end":"2025-05-31","priced_as":"DPL-SOUTH","price_usd_per_mw_day":426.17,"fpr":1.0894,"days":365,"usd_per_kw_month":14.1215,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2024-2025/2024-2025-base-residual-auction-report.pdf","report_page":8,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DPL","name":"Delmarva Power","part":"DPL-SOUTH","states":"DE MD VA","delivery_year":"2025/26","start":"2025-06-01","end":"2026-05-31","priced_as":"DPL-SOUTH","price_usd_per_mw_day":269.92,"fpr":0.9387,"days":365,"usd_per_kw_month":7.7068,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DPL","name":"Delmarva Power","part":"DPL-SOUTH","states":"DE MD VA","delivery_year":"2026/27","start":"2026-06-01","end":"2027-05-31","priced_as":"DPL-SOUTH","price_usd_per_mw_day":329.17,"fpr":0.917,"days":365,"usd_per_kw_month":9.1812,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DPL","name":"Delmarva Power","part":"DPL-SOUTH","states":"DE MD VA","delivery_year":"2027/28","start":"2027-06-01","end":"2028-05-31","priced_as":"DPL-SOUTH","price_usd_per_mw_day":333.44,"fpr":0.926,"days":366,"usd_per_kw_month":9.4173,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DPL","name":"Delmarva Power","part":"DPL-SOUTH","states":"DE MD VA","delivery_year":"2028/29","start":"2028-06-01","end":"2029-05-31","priced_as":"DPL-SOUTH","price_usd_per_mw_day":325,"fpr":0.9401,"days":365,"usd_per_kw_month":9.2933,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DPL","name":"Delmarva Power","part":"rest","states":"DE MD","delivery_year":"2024/25","start":"2024-06-01","end":"2025-05-31","priced_as":"EMAAC","price_usd_per_mw_day":53.6,"fpr":1.0894,"days":365,"usd_per_kw_month":1.7761,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2024-2025/2024-2025-base-residual-auction-report.pdf","report_page":8,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DPL","name":"Delmarva Power","part":"rest","states":"DE MD","delivery_year":"2025/26","start":"2025-06-01","end":"2026-05-31","priced_as":"EMAAC","price_usd_per_mw_day":269.92,"fpr":0.9387,"days":365,"usd_per_kw_month":7.7068,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DPL","name":"Delmarva Power","part":"rest","states":"DE MD","delivery_year":"2026/27","start":"2026-06-01","end":"2027-05-31","priced_as":"EMAAC","price_usd_per_mw_day":329.17,"fpr":0.917,"days":365,"usd_per_kw_month":9.1812,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DPL","name":"Delmarva Power","part":"rest","states":"DE MD","delivery_year":"2027/28","start":"2027-06-01","end":"2028-05-31","priced_as":"EMAAC","price_usd_per_mw_day":333.44,"fpr":0.926,"days":366,"usd_per_kw_month":9.4173,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DPL","name":"Delmarva Power","part":"rest","states":"DE MD","delivery_year":"2028/29","start":"2028-06-01","end":"2029-05-31","priced_as":"EMAAC","price_usd_per_mw_day":325,"fpr":0.9401,"days":365,"usd_per_kw_month":9.2933,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DOM","name":"Dominion Energy","part":null,"states":"NC VA","delivery_year":"2024/25","start":"2024-06-01","end":"2025-05-31","priced_as":"own supply (FRR)","price_usd_per_mw_day":null,"fpr":1.0894,"days":365,"usd_per_kw_month":null,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":7,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DOM","name":"Dominion Energy","part":null,"states":"NC VA","delivery_year":"2025/26","start":"2025-06-01","end":"2026-05-31","priced_as":"DOM","price_usd_per_mw_day":444.26,"fpr":0.9387,"days":365,"usd_per_kw_month":12.6846,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DOM","name":"Dominion Energy","part":null,"states":"NC VA","delivery_year":"2026/27","start":"2026-06-01","end":"2027-05-31","priced_as":"DOM","price_usd_per_mw_day":329.17,"fpr":0.917,"days":365,"usd_per_kw_month":9.1812,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DOM","name":"Dominion Energy","part":null,"states":"NC VA","delivery_year":"2027/28","start":"2027-06-01","end":"2028-05-31","priced_as":"DOM","price_usd_per_mw_day":333.44,"fpr":0.926,"days":366,"usd_per_kw_month":9.4173,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DOM","name":"Dominion Energy","part":null,"states":"NC VA","delivery_year":"2028/29","start":"2028-06-01","end":"2029-05-31","priced_as":"DOM","price_usd_per_mw_day":325,"fpr":0.9401,"days":365,"usd_per_kw_month":9.2933,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DEOK","name":"Duke Energy Ohio and Kentucky","part":null,"states":"KY OH","delivery_year":"2024/25","start":"2024-06-01","end":"2025-05-31","priced_as":"DEOK","price_usd_per_mw_day":96.24,"fpr":1.0894,"days":365,"usd_per_kw_month":3.189,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2024-2025/2024-2025-base-residual-auction-report.pdf","report_page":8,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DEOK","name":"Duke Energy Ohio and Kentucky","part":null,"states":"KY OH","delivery_year":"2025/26","start":"2025-06-01","end":"2026-05-31","priced_as":"DEOK","price_usd_per_mw_day":269.92,"fpr":0.9387,"days":365,"usd_per_kw_month":7.7068,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DEOK","name":"Duke Energy Ohio and Kentucky","part":null,"states":"KY OH","delivery_year":"2026/27","start":"2026-06-01","end":"2027-05-31","priced_as":"DEOK","price_usd_per_mw_day":329.17,"fpr":0.917,"days":365,"usd_per_kw_month":9.1812,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DEOK","name":"Duke Energy Ohio and Kentucky","part":null,"states":"KY OH","delivery_year":"2027/28","start":"2027-06-01","end":"2028-05-31","priced_as":"DEOK","price_usd_per_mw_day":333.44,"fpr":0.926,"days":366,"usd_per_kw_month":9.4173,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DEOK","name":"Duke Energy Ohio and Kentucky","part":null,"states":"KY OH","delivery_year":"2028/29","start":"2028-06-01","end":"2029-05-31","priced_as":"DEOK","price_usd_per_mw_day":325,"fpr":0.9401,"days":365,"usd_per_kw_month":9.2933,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DUQ","name":"Duquesne Light","part":null,"states":"PA","delivery_year":"2024/25","start":"2024-06-01","end":"2025-05-31","priced_as":"RTO","price_usd_per_mw_day":28.92,"fpr":1.0894,"days":365,"usd_per_kw_month":0.9583,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2024-2025/2024-2025-base-residual-auction-report.pdf","report_page":8,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DUQ","name":"Duquesne Light","part":null,"states":"PA","delivery_year":"2025/26","start":"2025-06-01","end":"2026-05-31","priced_as":"RTO","price_usd_per_mw_day":269.92,"fpr":0.9387,"days":365,"usd_per_kw_month":7.7068,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DUQ","name":"Duquesne Light","part":null,"states":"PA","delivery_year":"2026/27","start":"2026-06-01","end":"2027-05-31","priced_as":"RTO","price_usd_per_mw_day":329.17,"fpr":0.917,"days":365,"usd_per_kw_month":9.1812,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DUQ","name":"Duquesne Light","part":null,"states":"PA","delivery_year":"2027/28","start":"2027-06-01","end":"2028-05-31","priced_as":"RTO","price_usd_per_mw_day":333.44,"fpr":0.926,"days":366,"usd_per_kw_month":9.4173,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"DUQ","name":"Duquesne Light","part":null,"states":"PA","delivery_year":"2028/29","start":"2028-06-01","end":"2029-05-31","priced_as":"RTO","price_usd_per_mw_day":325,"fpr":0.9401,"days":365,"usd_per_kw_month":9.2933,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"EKPC","name":"East Kentucky Power Cooperative","part":null,"states":"KY","delivery_year":"2024/25","start":"2024-06-01","end":"2025-05-31","priced_as":"RTO","price_usd_per_mw_day":28.92,"fpr":1.0894,"days":365,"usd_per_kw_month":0.9583,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2024-2025/2024-2025-base-residual-auction-report.pdf","report_page":8,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"EKPC","name":"East Kentucky Power Cooperative","part":null,"states":"KY","delivery_year":"2025/26","start":"2025-06-01","end":"2026-05-31","priced_as":"RTO","price_usd_per_mw_day":269.92,"fpr":0.9387,"days":365,"usd_per_kw_month":7.7068,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"EKPC","name":"East Kentucky Power Cooperative","part":null,"states":"KY","delivery_year":"2026/27","start":"2026-06-01","end":"2027-05-31","priced_as":"RTO","price_usd_per_mw_day":329.17,"fpr":0.917,"days":365,"usd_per_kw_month":9.1812,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"EKPC","name":"East Kentucky Power Cooperative","part":null,"states":"KY","delivery_year":"2027/28","start":"2027-06-01","end":"2028-05-31","priced_as":"RTO","price_usd_per_mw_day":333.44,"fpr":0.926,"days":366,"usd_per_kw_month":9.4173,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"EKPC","name":"East Kentucky Power Cooperative","part":null,"states":"KY","delivery_year":"2028/29","start":"2028-06-01","end":"2029-05-31","priced_as":"RTO","price_usd_per_mw_day":325,"fpr":0.9401,"days":365,"usd_per_kw_month":9.2933,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"ATSI","name":"FirstEnergy Ohio and Penn Power","part":null,"states":"OH PA","delivery_year":"2024/25","start":"2024-06-01","end":"2025-05-31","priced_as":"ATSI","price_usd_per_mw_day":28.92,"fpr":1.0894,"days":365,"usd_per_kw_month":0.9583,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2024-2025/2024-2025-base-residual-auction-report.pdf","report_page":8,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"ATSI","name":"FirstEnergy Ohio and Penn Power","part":null,"states":"OH PA","delivery_year":"2025/26","start":"2025-06-01","end":"2026-05-31","priced_as":"ATSI","price_usd_per_mw_day":269.92,"fpr":0.9387,"days":365,"usd_per_kw_month":7.7068,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"ATSI","name":"FirstEnergy Ohio and Penn Power","part":null,"states":"OH PA","delivery_year":"2026/27","start":"2026-06-01","end":"2027-05-31","priced_as":"ATSI","price_usd_per_mw_day":329.17,"fpr":0.917,"days":365,"usd_per_kw_month":9.1812,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"ATSI","name":"FirstEnergy Ohio and Penn Power","part":null,"states":"OH PA","delivery_year":"2027/28","start":"2027-06-01","end":"2028-05-31","priced_as":"ATSI","price_usd_per_mw_day":333.44,"fpr":0.926,"days":366,"usd_per_kw_month":9.4173,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"ATSI","name":"FirstEnergy Ohio and Penn Power","part":null,"states":"OH PA","delivery_year":"2028/29","start":"2028-06-01","end":"2029-05-31","priced_as":"ATSI","price_usd_per_mw_day":325,"fpr":0.9401,"days":365,"usd_per_kw_month":9.2933,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"JCPL","name":"Jersey Central Power & Light","part":null,"states":"NJ","delivery_year":"2024/25","start":"2024-06-01","end":"2025-05-31","priced_as":"EMAAC","price_usd_per_mw_day":53.6,"fpr":1.0894,"days":365,"usd_per_kw_month":1.7761,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2024-2025/2024-2025-base-residual-auction-report.pdf","report_page":8,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"JCPL","name":"Jersey Central Power & Light","part":null,"states":"NJ","delivery_year":"2025/26","start":"2025-06-01","end":"2026-05-31","priced_as":"EMAAC","price_usd_per_mw_day":269.92,"fpr":0.9387,"days":365,"usd_per_kw_month":7.7068,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"JCPL","name":"Jersey Central Power & Light","part":null,"states":"NJ","delivery_year":"2026/27","start":"2026-06-01","end":"2027-05-31","priced_as":"JCPL","price_usd_per_mw_day":329.17,"fpr":0.917,"days":365,"usd_per_kw_month":9.1812,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"JCPL","name":"Jersey Central Power & Light","part":null,"states":"NJ","delivery_year":"2027/28","start":"2027-06-01","end":"2028-05-31","priced_as":"JCPL","price_usd_per_mw_day":333.44,"fpr":0.926,"days":366,"usd_per_kw_month":9.4173,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"JCPL","name":"Jersey Central Power & Light","part":null,"states":"NJ","delivery_year":"2028/29","start":"2028-06-01","end":"2029-05-31","priced_as":"JCPL","price_usd_per_mw_day":325,"fpr":0.9401,"days":365,"usd_per_kw_month":9.2933,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"METED","name":"Met-Ed","part":null,"states":"PA","delivery_year":"2024/25","start":"2024-06-01","end":"2025-05-31","priced_as":"MAAC","price_usd_per_mw_day":49.49,"fpr":1.0894,"days":365,"usd_per_kw_month":1.6399,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2024-2025/2024-2025-base-residual-auction-report.pdf","report_page":8,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"METED","name":"Met-Ed","part":null,"states":"PA","delivery_year":"2025/26","start":"2025-06-01","end":"2026-05-31","priced_as":"MAAC","price_usd_per_mw_day":269.92,"fpr":0.9387,"days":365,"usd_per_kw_month":7.7068,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"METED","name":"Met-Ed","part":null,"states":"PA","delivery_year":"2026/27","start":"2026-06-01","end":"2027-05-31","priced_as":"MAAC","price_usd_per_mw_day":329.17,"fpr":0.917,"days":365,"usd_per_kw_month":9.1812,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"METED","name":"Met-Ed","part":null,"states":"PA","delivery_year":"2027/28","start":"2027-06-01","end":"2028-05-31","priced_as":"MAAC","price_usd_per_mw_day":333.44,"fpr":0.926,"days":366,"usd_per_kw_month":9.4173,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"METED","name":"Met-Ed","part":null,"states":"PA","delivery_year":"2028/29","start":"2028-06-01","end":"2029-05-31","priced_as":"MAAC","price_usd_per_mw_day":325,"fpr":0.9401,"days":365,"usd_per_kw_month":9.2933,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PECO","name":"PECO","part":null,"states":"PA","delivery_year":"2024/25","start":"2024-06-01","end":"2025-05-31","priced_as":"EMAAC","price_usd_per_mw_day":53.6,"fpr":1.0894,"days":365,"usd_per_kw_month":1.7761,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2024-2025/2024-2025-base-residual-auction-report.pdf","report_page":8,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PECO","name":"PECO","part":null,"states":"PA","delivery_year":"2025/26","start":"2025-06-01","end":"2026-05-31","priced_as":"EMAAC","price_usd_per_mw_day":269.92,"fpr":0.9387,"days":365,"usd_per_kw_month":7.7068,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PECO","name":"PECO","part":null,"states":"PA","delivery_year":"2026/27","start":"2026-06-01","end":"2027-05-31","priced_as":"EMAAC","price_usd_per_mw_day":329.17,"fpr":0.917,"days":365,"usd_per_kw_month":9.1812,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PECO","name":"PECO","part":null,"states":"PA","delivery_year":"2027/28","start":"2027-06-01","end":"2028-05-31","priced_as":"EMAAC","price_usd_per_mw_day":333.44,"fpr":0.926,"days":366,"usd_per_kw_month":9.4173,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PECO","name":"PECO","part":null,"states":"PA","delivery_year":"2028/29","start":"2028-06-01","end":"2029-05-31","priced_as":"EMAAC","price_usd_per_mw_day":325,"fpr":0.9401,"days":365,"usd_per_kw_month":9.2933,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PENELEC","name":"Penelec","part":null,"states":"PA","delivery_year":"2024/25","start":"2024-06-01","end":"2025-05-31","priced_as":"MAAC","price_usd_per_mw_day":49.49,"fpr":1.0894,"days":365,"usd_per_kw_month":1.6399,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2024-2025/2024-2025-base-residual-auction-report.pdf","report_page":8,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PENELEC","name":"Penelec","part":null,"states":"PA","delivery_year":"2025/26","start":"2025-06-01","end":"2026-05-31","priced_as":"MAAC","price_usd_per_mw_day":269.92,"fpr":0.9387,"days":365,"usd_per_kw_month":7.7068,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PENELEC","name":"Penelec","part":null,"states":"PA","delivery_year":"2026/27","start":"2026-06-01","end":"2027-05-31","priced_as":"MAAC","price_usd_per_mw_day":329.17,"fpr":0.917,"days":365,"usd_per_kw_month":9.1812,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PENELEC","name":"Penelec","part":null,"states":"PA","delivery_year":"2027/28","start":"2027-06-01","end":"2028-05-31","priced_as":"MAAC","price_usd_per_mw_day":333.44,"fpr":0.926,"days":366,"usd_per_kw_month":9.4173,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PENELEC","name":"Penelec","part":null,"states":"PA","delivery_year":"2028/29","start":"2028-06-01","end":"2029-05-31","priced_as":"MAAC","price_usd_per_mw_day":325,"fpr":0.9401,"days":365,"usd_per_kw_month":9.2933,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PEPCO","name":"Pepco","part":null,"states":"DC MD","delivery_year":"2024/25","start":"2024-06-01","end":"2025-05-31","priced_as":"PEPCO","price_usd_per_mw_day":49.49,"fpr":1.0894,"days":365,"usd_per_kw_month":1.6399,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2024-2025/2024-2025-base-residual-auction-report.pdf","report_page":8,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PEPCO","name":"Pepco","part":null,"states":"DC MD","delivery_year":"2025/26","start":"2025-06-01","end":"2026-05-31","priced_as":"PEPCO","price_usd_per_mw_day":269.92,"fpr":0.9387,"days":365,"usd_per_kw_month":7.7068,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PEPCO","name":"Pepco","part":null,"states":"DC MD","delivery_year":"2026/27","start":"2026-06-01","end":"2027-05-31","priced_as":"PEPCO","price_usd_per_mw_day":329.17,"fpr":0.917,"days":365,"usd_per_kw_month":9.1812,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PEPCO","name":"Pepco","part":null,"states":"DC MD","delivery_year":"2027/28","start":"2027-06-01","end":"2028-05-31","priced_as":"PEPCO","price_usd_per_mw_day":333.44,"fpr":0.926,"days":366,"usd_per_kw_month":9.4173,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PEPCO","name":"Pepco","part":null,"states":"DC MD","delivery_year":"2028/29","start":"2028-06-01","end":"2029-05-31","priced_as":"PEPCO","price_usd_per_mw_day":325,"fpr":0.9401,"days":365,"usd_per_kw_month":9.2933,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PPL","name":"PPL Electric Utilities","part":null,"states":"PA","delivery_year":"2024/25","start":"2024-06-01","end":"2025-05-31","priced_as":"PPL","price_usd_per_mw_day":49.49,"fpr":1.0894,"days":365,"usd_per_kw_month":1.6399,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2024-2025/2024-2025-base-residual-auction-report.pdf","report_page":8,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PPL","name":"PPL Electric Utilities","part":null,"states":"PA","delivery_year":"2025/26","start":"2025-06-01","end":"2026-05-31","priced_as":"PPL","price_usd_per_mw_day":269.92,"fpr":0.9387,"days":365,"usd_per_kw_month":7.7068,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PPL","name":"PPL Electric Utilities","part":null,"states":"PA","delivery_year":"2026/27","start":"2026-06-01","end":"2027-05-31","priced_as":"PPL","price_usd_per_mw_day":329.17,"fpr":0.917,"days":365,"usd_per_kw_month":9.1812,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PPL","name":"PPL Electric Utilities","part":null,"states":"PA","delivery_year":"2027/28","start":"2027-06-01","end":"2028-05-31","priced_as":"PPL","price_usd_per_mw_day":333.44,"fpr":0.926,"days":366,"usd_per_kw_month":9.4173,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PPL","name":"PPL Electric Utilities","part":null,"states":"PA","delivery_year":"2028/29","start":"2028-06-01","end":"2029-05-31","priced_as":"PPL","price_usd_per_mw_day":325,"fpr":0.9401,"days":365,"usd_per_kw_month":9.2933,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PSEG","name":"PSE&G","part":null,"states":"NJ","delivery_year":"2024/25","start":"2024-06-01","end":"2025-05-31","priced_as":"PSEG","price_usd_per_mw_day":53.6,"fpr":1.0894,"days":365,"usd_per_kw_month":1.7761,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2024-2025/2024-2025-base-residual-auction-report.pdf","report_page":8,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PSEG","name":"PSE&G","part":null,"states":"NJ","delivery_year":"2025/26","start":"2025-06-01","end":"2026-05-31","priced_as":"PSEG","price_usd_per_mw_day":269.92,"fpr":0.9387,"days":365,"usd_per_kw_month":7.7068,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PSEG","name":"PSE&G","part":null,"states":"NJ","delivery_year":"2026/27","start":"2026-06-01","end":"2027-05-31","priced_as":"PSEG","price_usd_per_mw_day":329.17,"fpr":0.917,"days":365,"usd_per_kw_month":9.1812,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PSEG","name":"PSE&G","part":null,"states":"NJ","delivery_year":"2027/28","start":"2027-06-01","end":"2028-05-31","priced_as":"PSEG","price_usd_per_mw_day":333.44,"fpr":0.926,"days":366,"usd_per_kw_month":9.4173,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"PSEG","name":"PSE&G","part":null,"states":"NJ","delivery_year":"2028/29","start":"2028-06-01","end":"2029-05-31","priced_as":"PSEG","price_usd_per_mw_day":325,"fpr":0.9401,"days":365,"usd_per_kw_month":9.2933,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"RECO","name":"Rockland Electric","part":null,"states":"NJ","delivery_year":"2024/25","start":"2024-06-01","end":"2025-05-31","priced_as":"EMAAC","price_usd_per_mw_day":53.6,"fpr":1.0894,"days":365,"usd_per_kw_month":1.7761,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2024-2025/2024-2025-base-residual-auction-report.pdf","report_page":8,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"RECO","name":"Rockland Electric","part":null,"states":"NJ","delivery_year":"2025/26","start":"2025-06-01","end":"2026-05-31","priced_as":"EMAAC","price_usd_per_mw_day":269.92,"fpr":0.9387,"days":365,"usd_per_kw_month":7.7068,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"RECO","name":"Rockland Electric","part":null,"states":"NJ","delivery_year":"2026/27","start":"2026-06-01","end":"2027-05-31","priced_as":"EMAAC","price_usd_per_mw_day":329.17,"fpr":0.917,"days":365,"usd_per_kw_month":9.1812,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"RECO","name":"Rockland Electric","part":null,"states":"NJ","delivery_year":"2027/28","start":"2027-06-01","end":"2028-05-31","priced_as":"EMAAC","price_usd_per_mw_day":333.44,"fpr":0.926,"days":366,"usd_per_kw_month":9.4173,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf","report_page":9,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"},{"zone":"RECO","name":"Rockland Electric","part":null,"states":"NJ","delivery_year":"2028/29","start":"2028-06-01","end":"2029-05-31","priced_as":"EMAAC","price_usd_per_mw_day":325,"fpr":0.9401,"days":365,"usd_per_kw_month":9.2933,"report":"https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf","report_page":10,"page":"https://jesseahawkins.com/power/capacity/","source":"PJM Interconnection, Base Residual Auction reports; retrieved 2026-10-16","license":"figures cited from its reports"}]}